HomeMy WebLinkAbout1153 Amending Agreement for Engineering Services with HDR Engineering BILL NO. 2012-059 ORDINANCE NO. ��s3
AN ORDINANCE AMENDING THE AGREEMENT FOR ENGINEERING SERVICES WITH
HDR ENGINEERING, INC. TO PROVIDE FOR A CHANGE IN THE SCOPE OF SERVICES TO
INCLUDE SPECIFIC DESIGN AND CONSTRUCTION SERVICES IN CONNECTION WITH
THE LOWER LINE CREEK TRAIL PROJECT AND AUTHORIZING PAYMENT FOR
SERVICES IN CONNECTION WITH SUCH PROJECT IN AN AMOUNT NOT TO EXCEED
$55,757.19
WHEREAS, the City of Riverside, Missouri ("City") approved the qualifications of HDR
Engineering, Inc. ("HDR") to provide certain engineering services within the City and entered
into an agreement with HDR at such time for provision of on-call engineering services within the
City pursuant to Ordinance 2009-110 (hereinafter the "AgreemenY'); and
WHEREAS, there is a need to amend the Scope of Services under the Agreement to
authorize specified engineering services related to the Lower Line Creek Trail Project; and '
WHEREAS, the amount of $36,297.19 has previously been paid out of the city treasury
for such services with a remaining amount due not to exceed an additional $19,460.00; and
WHEREAS, the Board of Aldermen find it is in the best interest of the citizens of the City
of Riverside to provide for such additional services, ratify prior expenditures and authorize
additional expenditures as set forth in Exhibit A attached hereto;
NOW THEREFORE, BE IT ORDAINED BY THE BOARD OF ALDERMEN OF THE
CITY OF RIVERSIDE, MISSOURI, AS FOLLOWS:
SECTION 1— AMENDMENT APPROVED. Execution and delivery of an amended
scope of services to the Agreement with HDR Engineering, Inc. in substantially the form attached
hereto as Exhibit A, is hereby approved and all prior actions taken with regard to the acquisition
and payment of such services from HDR in connection with the Lower Line Creek Trail Project are
hereby approved, ratified and authorized.
SECTION 2—AUTHORITY GRANTED. The Mayor, the City Administrator, the City
Attorney and other appropriate City officials are hereby authorized to take any and all actions as
may be deemed necessary or convenient to carry out and comply with the intent of this
Ordinance and to execute and deliver for and on behalf of the City all certificates, instruments,
agreements and other documents, as may be necessary or convenient to perform all matters
herein authorized and any actions taken prior to the adoption of this ordinance are hereby
ratified and approved.
SECTION 3— EFFECTIVE DATE. This Ordinance shall be in full force and effect from
and after its passage and approval.
BE IT REMEMBERED that the above was read two times by heading only, passed and
approved by a majority of the Board of Aldermen and APPROVED by the Mayor of the City of
Riverside, Missouri, this ��day of September, 2012.
� at een L. Rose, Mayor
�; • App e s o Form:
Robin LittreU, City Clerk a mps , City Attomey
August 30, 2012
City ofRiverside
Ath�: Mr. Travis Hoover, P.E., Capita) Projects Engineer
2950 NW Vivion Road �
Riverside, MO 64150
Re: Lower Line Creek Trail Connecter �
HDR P[oject No. 178226
Dear Travis:
At the City of Riverside's request, HDR Engineering Inc. (HDR) has coYnpleted design and
development of 95% construction plans and specifications for the referenced project as part of
our On-Call City Engineering Services contract dated August 4, 2009. The services completed
by HDR to date include the following tasks.
• Topographic survey of•the west bank of Line Creek in the vibinity of Tullison Road and
Highway 9
• Preliminary Plan Development of a mulN-use trail along Line Creek from tlrgosy
Pazkway undemeath the Tullison Road and Highway 9 bridges north to Cliffview Drive
• Performed HEC-ItAS hydraulic analysis of the proposed trail's affect on the FEMA
floodplain, completed a No-Rise'certification, and flood plain development permit.
• Coordinated with and obtained MoDOT approval to encroach on Hwy 9 ROW
• Conducted review meetings with the Corps of Engineers and Riverside Quindero Levee
District (RQLD)
• Competed a geotechnical analysis of the slope stability of the levee caused by the
proposed modifications due to the trail installarion
, . Developed Final Construction Plans and Specification for review and approval by the
Corps nf Engineers and RQLD
These services have been completed on an hourly basis plus reimbursable expenses. HDR's
September invoice, which will account for chazges through August 25, 2012, indicates total
project related billings of $36,297.19.
Work remaining to finalize the Bid Package for Advertisement includes satisfactorly
addressing the Corp of Engineers and the RQLD review comments and updating the Project
Manual based on City review comments. HDR has completed three iterations of updates and
� 3741NETwanOrive Phane:1818)550-W19
, H�HEnginaering,lnc. Lse'aSummiLM081061-1988 FBtIB181554-3061
� www.hdrinc.com
Travis Hooveq P.E. �
• CityojRiverside
Page 2 oj3
review with the RQLD and anticipates approval at the conclusion of the next review cycle. At
that point the project will be ready to advertise for bid .
HDR's anticipated remaining Scope of Services for this pmject will include:
Bid Package Preparatlon ,
• Final review meeting with RQLD and Corps of Engineers
•' Finalize P1ans based on review comments
• Finalize Project Manual
Biddiug Phase Services
• Plan Distribution and tracking of Plan Holder's List
• Attend Pre-�id Conference, Prepare and distribute minutes
• Address B�d Phase inquiries
• Prepaze and issue applicable addendum
• Attend Bid Opening
, • Prepare Bid Tabulation and review bids for responsiveness and mathematical
correctness
• Submit a written awazd recommendarion and attend one_ (1) Board of Aldermen meeting
Construction Phase Services
• Attend Pre-Construction Conference
• Attend Construction Progress Meetings — Monthly (3)
• Provide Contract Document Interpretation
• Prepaze and Issue Applicable Change Orders
• Substantial Completion Inspection and Punch list �
• Final Completion Inspection, Closeout Documentation
As compensation for the performance of the Bidding and Construction Phase Scope of Services
described in this Letter, HDR respectfully requests compensation in the amount of $19,460.00.
This compensation is broken down into the project components describe above as follows:
• Bid Package Preparation $4,860.00 •
Bidding Phase Services $7,170.00
Constcuction Phase Services $7,430.00
Travis H9over, P.E.
City ojRiverside .
Page 3 of 3
If you have any questions while reviewing this inforination please feel free to wntact me at
816-347-1120. We have enjoyed working with the City of Riverside on this project and look
forward to its succeasful completion.
Sincerely, •
Aaron� re tte P. .
��2� 1/�s , ,
Cc: Nancy Thompson, City.Attorney
AMENDMENTTO AGREEMENT
FOR
ENGINEERING SERVICES
WHEREAS:
HDR ENGINEERING, INC. ("HDR") entered inio an Agreement on Auaust 9lh . 2009 to
perform engineering services for the Citv of Riverside ("Riverside"l;
Riverside desires to amend this Agreement in order for HDR to perform services beyond those
previously contemplated;
HDR is willing to amend the agreement and perform the additionai engineering services.
NOW, THEREFORE, HDR and Riverside do hereby agree:
The Agreement and the terms and conditions therein shall remain unchanged other than the additional
scope of work associated with the Lower Line Creek Trail Connector Project listed below;
Bid Package Preparation
. Final review meeting with RQLD and Corps of Engineers
• Finalize Plans based on review comments
. Finalize Project Manual
Bidding Phase Services
• Plan Distribution and tracking of Plan HoldePs List
• Attend Pre-Bid Conference, Prepare and distribute minutes
• Address Bid Phase inquiries
. Prepare and issue applicable addendum
• Attend Bid Opening
. Prepare Bid Tabulation and review bids for responsiveness and mathematical correctness
• Submit a written award recommendation and attend one (1) Board of Aldermen meefing
Construction Phase Services
• Aflend Pre-Conslruction Conference
• Attend Constructan Progress MeeGngs — Monthly (3)
. Provide Contract Document Interpretation
. Prepare and Issue Applicable Change Orders
• Substantial Completion Inspection and Punch list
. Final Complefron Inspection, Closeout Documenta6on
Estimated Fee associated with the addiGonal scope of work is 19 460.00 as detailed on the attached
Detailed Scope and Fee Estimate.
IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the day and year written
bebw:
HDR ENGINEERING, INC. ("HDR") CITY OF RIVERSIDE ("RIVERSIDE")
By: St n hris�� e^5r. V.P By: �
. �`.°�-`-�
its: �""� �ts: � fh I�.e..-, l- �a s�
Date: � � Date: � —� - � i a—
CITY OF RIVERSIDE - LOWER LINE CREEK TRAIL CONNECTOR
HDR Engineering, Inc.
Scope and Fee
Kimes, McGhee, WoaO,
ihomas Bresette, Aaron Mark Sims, Ky/e Reuss, Billfe Connie
Geotechnical
Tech Ativisor Project Mgr. Pro'ect En . En9. CADD Tech AEmin Ezpenses To[al
Billing Ra[es 177.D0 15].00 116.00 115.00 ]0.00 60.D0
TASKS
A� Finalize BiC Package
1 ReviewMeeOnqwiNRpL�andGOmSOtEngrs 4 4 4 2 1 $60 $2,126
2 FinalizePlansbaseGOnreviewcommenls 4 4 8 $30 $1,682
3 FinalizePmleclManual 2 4 4 $34 $�,052
Subrotal Hours 4 10 12 2 8 5
Subm�al Dollars 684 1570 1392 230 560 700 124 $4,860
Tofal Preliminary 0eslgn Phase E4,860
e� Bidding Phase
i PIan015Vi6uAonandPackingolPlanHaldefsList 2 i6 $1,192
2Atlen�Pre-BiaCOnlerence,PrepareMinules 2 4 2 $28 $926
3AddressBidPhaselnquines 2 4 8 4 $2.738
4PrepareantlluueApplicableAtlGenOUm 2 fi 4 $1,250
5 Anentl9idOpening 2 $28 5342
Prepare Bitl Tabulatian antl Review Bids br responsiveness and
6 maNematicalconecNess 2 2 $352
] ReviewBitlsandQuestionnaire,venyreferencesoflowbltlEer 4 $628
Submit a written award recommentlation and attend one (1�
H Board ofAldermen meeUng 2 $28 $342
Su6mtalMOUrs 2 i6 22 0 0 28
Su6mtalD011ars 342 2512 T552 0 0 1680 84 E7,170
Tofal Bidding Phase 57,170
�' ConsfruclianPhase
1 AnenEPre-GanswcoonCanlerence 2 2 $32 8578
2 AnendCansWCtionPmgressMeetings-MOnth �3� B 8 $60 $2,244
3 PmvideCantractDocumentlnterpre�ation 4 8 81,556
4 PrepareandlssueAp IlcableChan eOrGers 4 8 $1,556
5 SubslantialCompletionlns ecfionandPwchlist 2 2 4 $32 $1,152
6 Final CompleGOn Inspectioq Gloseout�ocumenlation 2 $30 $344
Submtal Hours 2 22 30 0 0 0
Submtal Dollars 342 3454 3480 0 0 0 154 57,430
Total ConsVUCtion Phase $7,ffi0
Total Hours 8 48 64 2 8 33 163
To[al Billing Amoun[ E1.368 57,SJ6 E7,42d 5230 E560 57,980 E362 E19,460