HomeMy WebLinkAboutR-2012-140 Change Order 1 and 2 for Vivion Road Bridge Over Line Creek RESOLUTION NO. R-2012-740 A RESOLUTION AUTHORZING, APPROVING AND RATIFYING CHANGE ORDERS 1 AND 2 TO THE AGREEMENT BY AND BETWEEN THE CITY OF RIVERSIDE AND L.G. BARCUS & SONS, INC. FOR VIVION ROAD BRIDGE OVER LINE CREEK PROJECT RESULTING IN A REVISED CONTRACT AMOUNT OF $1,602,149.22 FOR SUCH PURPOSES WHEREAS, the City issued an Invitation to Bid for the Vivion Road Bridge over Line Creek Project within the City which was awarded to L. G. Barcus and Sons, Inc. pursuant to Resolution R-2012-048, and WHEREAS, Change Order 1 to said contract was authorized by vote of the Board of Aldermen on August 21, 2012, to approve a modification to Job Special Provision "U" relating to the payment of Liquidated Damages and Liquidated Savings; and WHEREAS, the Board of Aldermen find it in the best interest of the City to formally authorize, approve and ratify Change Order 1 and to further authorize, approve and ratify Change Order 2 to the agreement in the amount of $45,569.84, resulting in a total revised contract amount not to exceed $1,602,149.22; NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE, MISSOURI, AS FOLLOWS: THAT Change Orders 1 and 2 to the Agreement entered into by and between the City and L.G. Barcus and Sons, Inc. and incorporated herein by reference resulting in a revised contract amount not to exceed $1,602,149.22 are hereby authorized, ratified and approved. FURTHER THAT the Mayor, City Administrator and all other required city officials are authorized to execute the change order authorized herein together with any and all documents necessary or incidental to the performance thereof and to take such other actions and/or execute and deliver for and on behalf of the City all certificates, instruments, agreements and other documents as may be deemed necessary or convenient to carry out and comply with the intent of this Ordinance. BE IT REMEMBERED that the above was PASSED AND APPROVED by a majority of the Board of Aldermen and APPROVED by the Mayor of the City of Riverside, Missouri, this �"—° day of October, 2012. „ ' . . , Kat leen L. Rose, Mayor ATl'EST: 9 <�.�:�, ; cS���eD1J� Robin Linrell, City Clerk Approve s to form: a pso , City Attorney CITY OF �- RIVER_S�D� �� MISSC?URI Upstream from ordinary. 2950 NW Vivion Road Riverside, Missouri 64150 MEMO DATE: September 28, 2012 AGENDA DATE: October 2, 2012 TO: Mayor and Board of Aldermen FROM: Travis Hoover RE: Change Order 2 for the Vivion Road Bridge over Line Creek Project BACKGROUND: Change Order 2 includes: • Relocation of KCPL streetlight conduit —($3,126.96) • Additional compensation for utility redesign -$13,769.03 • Additional compensation for KCPL redesign -$9,951.44 • Additional compensation for locating at&t lines -$8,918.61 • Northmoor waterline - $ I 3,288.22 • Mike's fireworks removal - $2,769.50 Original Contract Amount $1,556,579.38 Toul of Previous Changes $0 Total this Change Order $45,569.84 Current Contract Total $1,602,149.22 RECOMMENDATION: Staff recommends approval of the resolution and acceptance of change order 2 with L.G. Barcus and Sons to continue with construction of the Vivion Road Bridge over Line Creek project. BUDGETARY IMPACT: Approximately $1,679,978.19 will be expended out of the Vivion Road Bridge over Line Creek budget for construction under this contract. l. G. BARCUS AND SONS, INC CmtomerfAtlrcss: 1950 NW VIVION ROAD, RNERSIDE MO 64150 P 816 741-3993 ]oESRe p00re55: BRIOGE REPIACEMENf, CRY OF RIVE0.5IDE� MO� P 816 719-9986 AIVERSIDG MO TRANSMITTAL US 69 (VIVION RD)/ LINE CREEK 85 ]ob: 4548 US 69(VIVION RD)/LINE CRK Customer: CITRIV CITY OF RIVERSIDE, MO Iasued To: MODOT Date Issued: 09/28/12 ST.IOSEPH PRO7ECT OFFICE 4718 SOUTH 169 HWY ST. 70SEPH� MO 64507 Attention: �REO STERVINOU, R.E. Fax No: 816 387-2589 Sub)ect: CHANGE ORDER #1 - MODIFICATION OF INCENTIVE PACKACGE We Are Sending You: CNANGE ORDER Coples Date Descrlption 1 09/28/12 EXECUTED CHANGE ORDER #1 Theae aro transmitted: FOR REViEW ANR APPROVAL Remarke: CHANGE ORDER #1 -MODIFICATION OF LIQUIDATED DAMAGESILIQUIDATED SAVINGS SPECIFICATION ORIGINALS WILL BE MAILED Slgned: � DANIEI GIBSON Flle: MODOT cc: TRAVIS HOOVER GINA OROZCO PAnted by DAG as of 09/28/t2 8:30:S7AM Change Order No. l Date of Issuance: August 21, 2012 Effective Date: August 21, 2012 Project: Bridge A7804 US 69 over Owner: City of Riverside, Ownefs Contract No.: Contract: 3TP-3400(424�J4S2206 Date of Contract: May 22, 2012 Contractor: LG Barcus & Sons Engincer's Project No.: 700336-260 The Contract Documents are madified as foUowa upon executioa of thia Chan�e Order: Description; Due to the delay at the start of the proJect, the Contractor has reqnested compensadon in time fnr project delay due to utility conflicts. Attechmeuts (list documents aupporting change): Attachment 1— Revised Job Speciai Provision U. Liquidated Damages/Liquidated Savings Specified CfIANGE IlV CONTRAGT PI2ICE: CHANGE IN CONTRACT TIlVIES: Original Contract Price: Original Conhact Times: ❑ Working days � Calendat day Substantial wmpledon (days or date): $1.556.579.38 Resdy for Snal payment (days or date):150 [IncreaseJ [Decreasa) from previously approved [Increase] [Decreasej &om previously approved Change Orders Change Orders No. _ to No. _; No. _ to No. �: Substantia] complerion (days): $N/A , Ready for final payment (days): Contract Price prior W this Change Order: Comract 1"unes prior to this Change Order: Substantial compleHon (days or date): $1.556.579.38 Ready for final payment (days or dste): 150 Increase of Uils Change Order: [Increase] [Deerease] of thie Change Order: Substantial wmpletion (days or date): $0.00 Ready for final payment (days or date): 0 Con�act Pdce incorporating this Chenge Order: Contract Tlmes with all approved Change Orders: Substantial compleNon (days or dste): $1.556,579.38 Ready for finel payment (days or date): 150 RECObIMENDED: ACCEPTED: ACC 'FB ._ By: By: s �--� Engfneer (Authorlud Stgnatura) Oxmer (Authariud Signeturo) Contracror ithar Signenue) Date: Date: Date: � � � Approved by MoDOT: Date: Resident Engineer �u.s�tMwdnnnr000xxao�n�.n �e.u�en.,nvff.o,e,a euwu. � e: ATTACHMfiNT I TO CHANGE ORDER N0. 1 U. I.IOUIDATBD DAMAGHS / LIOUIDATED SAVINGS SPECIETED 1.0 Description. If all contract work necessary to sefely open bridge A7804 to traffic is not completed within ihe time constraint listed in section 1.2, the City, the traveling publlc, and state and locel police and governmental authorities will be damaged in various ways, including but not limited to potential liabllity, traffic and traffic flow regulation cost, uaffic congestion and motorist delay, with its resulting cost to the traveling public. l.l Liquidated Damages Specified for Failure To Complete Work on Time. These costs are not reasonably capa6le of being computed or quantified. Thereforc, the contractor will be charged with Ilquidated damages specified in the amount of $10,000.00 per day for each fuil calendar day that all contract work necessary to safely open bridge A7804 to tra�c is not compieted within the dme constraint listed in section 1,2, All rnntract work shall be completed as directed in the contract end on the plans to resume two way traftic on Vivion Road within such time frame. 1.2 Time Constraint. The contractor is advised of the following time constraint that must not exceed the specified duration. A maximum duratlon of 60 calendar days shall be allowed for the closure of bridge A7804. This duration ends when the bridge is opened per section 1.4 herein. 1.3 The liquidated damages set forth in swtion 1.1 am related specificaily to the closure of the bridge to traffic end will be assessed ln addition to any other liquidated damages chazged under the Missouri Standard Specifications for Highwey Construction, as indicated olsewhere in this contract. l.4 The deducdon in section 1.1 will continue unHl such time as the necessary work to open the bridge to two wey traffic is completed and such Vaffic is restored. The contractor may regulete traffic flow from dme to time to complete the contract work following opening of the bridge to two way traft3c. (.5 Liquidated Savings SpecifIed for Early Compledon. The contractor will receive an incentive payment from the City, in addition to all other sums earned under the contract, if the contractor completes construction of bridge A7804 before the 60 calendar day time constraint. To qualify for this incentive payment, afl contract work necessary to safely open bridge A7804 to traffic must be completed and bridge A7804 must be open to vehicular traffic. An incentive payment of up to a marimum of $77,828.97 will be paid for completion of such work prior to the 60 calendar day time constraint. The ma�cimum amount paid as ]iquidated savings will not exceed 5% of the total bid for Job No, J4S2206. in the event the contractor dces not aggrossively pursue all contract work necessary to safely open btidge A7804, the amount of $5,000 shall be DEDUCI'ED from such incen[ive payment for each "wocking day" the contractor is not on the job site during the period of time the bridge is closed to vehicular traffic, up to a maximum of fifteen (15) working days. For purposes of this section only, determination as to whether the contcactor should be charged a"working day" for failure W perform work at the project site shall be determined by the MoDOT Resident Bngineer et the time of the occurrence. The uUlization of a working day determination for deductions from such incentive payment in this section shall not alter or affect the number of calendar days which the bridge may closed before the assessment of ilquidated damages in section U.l.l. The deductlon from the incendve payment shall be tn addition to the liquidated damages in section U.1.1. The incentive payment and deductions therefrom for failure of contractor to aggressively pursue the work on a critical path are a fair and reasonable approximadon of the additional time and campensation to perfarm the work due to the delay in the start time of the mad ciosing because of utility conflicts. 1.6 In the event of an axcusable delay, an extension of the wntract completion time will not extend the date specified for determining eny liquidated savings or incentive contained in sections U.1.0 through L1.1.7.. Punher, in the event of an excusable delsy, if the contractor completes the work providing for liquidated savings or incentive on or before the milestone or other date, the additional work performed to achieve such incentive shall not constitute a basis to claim acceleration costs in addidon to the liquidated savings or incentive that may be earned, 1.7 The incent3ve payment described above is made, not as a bonus or gift, but as sHpuleted compensadon in ft�ll for reduced risks, delay and inconvenience experienced by the traveling public, and for other reduced costs to the City and public resuldng from early completion. __ 14305teteAve,KansosCit�N566102,Ph:9]i621-11W,Fk:913�621-9288 _�_ �� � ��r R4548 US 69 HI hwa hAon Roa , Alvenlde MO Y Total Com emation lGe has r uested the fdlowing dadutts end addltlonal com ensatlan for work to he a�tocmed. q �� LG0leoferingthefollowingdeducttomovethe2"Streetlig tCOnduitfranbeingsuspe�edundertheBrldge j (3,12&96) . to running through the corral reil . �i%aondhesbeendeducted � Y_v I e �-- 4GBisrequestlngthefollowingcompensatloniorthe5[ormSewerRedetlgn.� �S 13,769�03 �ifb eond has baen Includetl ................LG8137EqAEStlflBth€{�OI(BWIIfgCaYA1�1136tId1fibY'KCPL'plSi�lYCUBI/OVlttOIPi'8fl'tl'CkbtlgES__._—___._.__........__'. _—__..__—.... . .._......__............. �I •39G Bond has baen Included � i LGB Is requesting the tollowing compensativn for the Potholing to Locate AT&T Ilnes ad)atant to the drllled shaRs. $ 8,918.61 *1 %Bond has been added r Le er No1 0 LGBlsrequestl�thetollowingcompensatlontorelocatatha3ValveClusterfortheCltyofNOAhmoorcurrenUy $ 19,Y68.32 loceted at Statlon 21+63.00, 5Y.00' lt and ins[all addltlonal landseap�ng in ecwrdance wilh Sheat 55 and Sheet j SSA •196 8ond has been edded �� — ----____— — ---..---- _� _._, ; 1 esl u e a Ca e � LGB Is requesling the folimving compensatlon for the redeslgn otthe abutmmt and caprelnforcing steel. (Bar List ��_ W ._.,� Erran T6D I o e's e o i LGB is requesUng the (ollowing compansatlon for the rcmoval ofthe Mike's Flreworks Slgn end tbe reroutUg of ' eiectrkalw�dn fonnewsi n. $ 2J69.50 - eE sde i : lG8 is requesting the foilowing compensatlon for the redesign of the grading on the West side of the proJect from STA 17t50 - End of Pro ect end foi the ed ustment ot Junctlon Box 85 & N6 . Tg� TBD-AddlNanel Comnensation due to uns ultehle solls In road Remove and Reolace Material. TBD � Nso Including the e mbankment of this mateflal onto Homestead lane. �. I