HomeMy WebLinkAboutR-2012-145 Approving Change Order 1 and 2 for the Mattox Road Project RESOLUTION NO. R-2012-145 A RESOLUTION AUTHORIZING, APPROVING AND RATIFYING CHANGE ORDERS 1 AND 2 TO THE AGREEMENT BY AND BETWEEN THE CITY OF RIVERSIDE AND V.F. ANDERSON BUILDERS FOR THE CONSTRUCTION OF THE MATTOX ROAD PROJECT RESULTING IN A REVISED CONTRACT AMOUNT NOT TO EXCEED $1,362,420 WHEREAS, the City issued an Invitation to Bid for the Mattox Road Project which was awarded to V.F. Anderson Builders pursuant to Resolution R-2012-066, and WHEREAS, Change Order 1 to said contract INCREASES the total contract amount by $83,811.00 and Change Order 2 provides for a credit and REDUCES the total contract by an amount of $28,216.00, resulting in a NET INCREASE of $55,595.00; and WHEREAS, the Board of Aldermen find it in the best interest of the City to formally authorize, approve and ratify Change Orders 1 and 2 to the agreement with V.F. Anderson Builders, resulting in a total revised contract amount not to exceed $1,362,420.00; NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE, MISSOURI, AS FOLLOWS: THAT Change Orders 1 and 2 to the Agreement entered into by and between the City and V.F. Anderson Builders and incorporated herein by reference resulting in a revised contract amount not to exceed $1,362,420.00 are hereby authorized, ratified and approved. FURTHER THAT the Mayor, City Administrator and all other required city officials are authorized to execute the change order authorized herein together with any and all documents necessary or incidental to the performance thereof and to take such other actions and/or execute and deliver for and on behalf of the City all certificates, instruments, agreements and other documents as may be deemed necessary or convenient to carry out and comply with the intent of this Ordinance. BE IT REMEMBERED that the above was PASSED AND APPROVED by a majority of the Board of Aldermen and APPROVED by the Mayor of the City of Riverside, Missouri, this �D"day of October, 2012. Kathleen L. Rose, Mayor ATTEST: ��=7';� o.�-L�. Robin Littrell, City Clerk Approved as to form: � / a Tho son, City Attorney MEMO DATE: October 25, 2012 AGENDA DATE: October 30, 2012 TO: Mayor and Board of Aldermen FROM: Brad Haymond RE: Change Order I for the Mattox Road Project. BACKGROUND: NorthPoint previously presented options for the Mattox Road project to try and the open concurrently with Premium Waters. The change to DIP for Phase II was approved by a motion but never adopted as an ordinance. OriginalContractAmount $1,306,825.00 Total of Previous Changes -0- Total this Change Order +$83,81 I.00 Current Contract Total $1,390,636.00 RECOMMENDATION: NorthPoint recommends approval of the resolution and acceptance of the change order with VF Anderson Builders for the Mattox Road project. BUDGETARY IMPACT: We are currently under the allotted construction budget by $9,742.00 CITY OF RIVERSIDE CHANGES IN PLANS AND CONSTRUCTION Changes in Pians andlor Constructlon Project Name: Mattox Road Project Location: Riverside, Missouri Reauest #1 Project Number. *� rdaw,y w,re� m me ��ai �o,n�e.ma,,,x..�2,�nree w� cm� x,a,,,ee q.me u„waa a io.�nea saw�s �a�me q m<cmv,na as a 2sun ar a Contract Date: 5/31I2012 �"^es �^ �^� �+� �.bw�ea auamm� r� me esu� Qu.mmo snow� m m� e;e amcosei. Date Prepared: 8/28/2012 Page Number: 1 of 1 REQUIRED CHANGES IN PRESENT CONTRACT Contract Item Item Description Nel Change Reason No. 32 12" PVC decrease 1327 LF Changed to DIP sewer pipe in Phase 11 to speed up construction. 26 days were deducted from the contrect to match up with Premium Walers opening. 34 15" PVC decrease 69 LF See above 41 12' x 6' PVC Tee decrease 4 Ea See above 42 12" x 8" PVC 7ee decrease 1 Ea See above 12" OtP increase 1327 LF See above 15" DIP increase 69 LF See above 12' x 6' DIP 7ee increase 4 Ea See above 12" x 8" DIP Tee increase 1 Ea See above CITY OF RIVERSIDE � CAANGES IN PLANS AND CONSTRUCTION RE�UEST N0.1 Projed Name: Matlox Road The following changes �o the original conlrad amounl were reQUi�ed to cover cost incurted by the Contredw or to retlect Project I.ocalion: Riverside, Missouri savings realized by the Contractor as a result o( a change in ihe actual wnstruded quanfilies from Ihe estimated quanlilies Projed Num6er, shown on ihe Bid Proposal. Contrad Date: 5/3 112 01 2 Date Prepared: 8/28/2012 Page Number: 1 of 1 REqU1RED CHANGES IN PRESENT CONTRACT Conirect ar Cont2ct or Conirect or New a New or New or Previous Previous Previous Unit Item Description Adjusted Ad�usled Ad�usled Quanti Unil Price Amounl QuanCn Unit Pdce Amounl 1,327.0 E51.00 567,677.00 LF 12" PVC Sewer Pipe 69.0 $67.00 $4,623.00 LF 15' PVC Sewer Pipe 4.0 E350.00 $1,400.00 EA 12" X 6' PVC Tee 1.0 E410.00 E410.00 EA 12" X 8' PVC Tee LF 12' DIP SewerPipe 1.327.00 y109.00 8144.643.00 LF 15' DIP Sewer Pipe 69.00 E124.00 58,556.00 EA 12' X 6" DIP 7ee 4.00 E936.00 $3,744.00 EA 12' X 8' DIP Tee 1.00 E978.00 3978.00 Previous Tolal E74,110.00 Adjusted Tde 5157,921.00 Net Change E83,811.00 Statemenl of Contract Original ConUacl Amount E1,306,825.00 Nel Amount of PrevioUS Addi�ions and Deduc[lon5 Nel Conlracl Amount Prior to Thls Request E1.306,825.00 Amount a/ This Raques[ $83,811.00 New ConUact Amount $7,390,636.00 Percent Change in Contrecl Amount 6.47 % CONTRACTOR: PROJECT INSFECTOR: ACCEPTEO BY Company. VF Anderson Builders LLC Ciry, Slate: Pewliar MO 64078 Recommended: g� �Qt/{'Y) p(.� Const qion Ma ager Signed by: � I��/ Approved: _ Date: � Z 1 —_ _� �/�.5/� Z Date: MEMO DATE: October 25, 2012 AGENDA DATE: October 30, 2012 TO: Mayor and Board of Aldermen FROM: Brad Haymond RE: Change Order 2 for the Mattox Road Project. BACKGROUND: NorthPoint previously presented Change Order I for the Mattox Road project. Change Order 2 includes quantity adjustments and onsite items that came up during construction. Original ContractAmount $1,306,825.00 Total of Previous Changes +�g3�gl I.00 Total this Change Order -$28,216.00 Current Contract Total $1,362,420.00 RECOMMENDATION: NorthPoint recommends approval of the resolution and acceptance of the change order with VF Anderson Builders for the Mattox Road project. BUDGETARY IMPACT: We are currently under the allotted construction budget by $37,958.00 CITY OF RIVERSIDE � CHANGES IN PLANS AND CONSTRUCTION Changes in Plans andlor Construction Project Name: Mattox Road Project Localion: Riverside, Missouri Reauest #2 Project NUmber. me idwww+ w�m, a me anqnei mx�aa aman.,,n renwrea m m.ermm n�..�,e eyin, cor�„cm,,, b,rxa,.+�, m,a,e q�u„ ca,n„c�aac. �..,�a. Conirect Dale: 5/3112012 aum� � ina.rwi mmm�aee o�+�R. rmm m. emmaw v���es mww m me en vrapmr Dale Prepared: 10A t/2012 Page Number. i of 1 REpUIRED CHANGES IN PRESENT CONTRACT Contrect Item Item Descriplion �uanL Change Net Dollar Change Reason No. Storm Line 82-83 1 iine raised increase $1.985 VFA had to relay lhe stortn line due to the relocated waterline being installed at fhe wrong elevalion Cemenl Material increase 149 CY increase E2,980 Remove Cement like material found in �he subbase of the East side of Mattox Road on Phase I Hi h-Earl Concrele increase 154 SY increase $6,468 �^1e switched from regular concrete to a high early conc2te fa KnappCo's iruck dock entrance lo shoAen the cure time hom 7 days �0 2 days 3 Tree Slump Removal decrease $385 decrease 3385 VFA did not remove lhe entire tree and caused MAW's conirecla to remove the stump and root ball that had been lefl Fix MAW Valve decrease $264 decrease $264 VFP. damaged a valve al 43rd sireet ihat was repaired by MAW's Coniractor 6 Contrector Bortow decrease 100 CY decrease E1,500 On-site material was available and covered atl fill needed for the project 7 Overezcavation decrease 100 CY decrease E1,000 Overexcavation tor soft spots was not required 53 4" Su e Rock decrease 10 CV decrease �1,500 The surge rock was not used and deducted from the controcl 52 Dewaterin 1 lum sum devease $35,000 Dewatering was not required on this pmject due to ihe ground water level staying low CITY OF RIVERSIDE - � CHANGES 1N PLANS AND CONSTRUCTIOIV RE�UE57 NO. 3 Project Name: Maltox Road The following changes to ihe original contred amount were required to cover wst incurted by Ihe Contrector or to reflect Prqect Location: Riverside, Missouri savings realized by the Contredor as a result of a change in ihe aclual canstructed quanlNies trom Me estimaled quanlilies Projecl Number: shown on the Bid Proposal. ContraclOate: SI3112012 DatePrepared: t0111/2012 Page Number: 1 of 1 RE�UIRED CHANGES IN PRESENT CONTRACT Con[racl or Conired or Conlract or New or New or New or Previous Previous Previous Unit Item Description Adjusted Adjusted Adjusted Quanfil Unil Price Amount �uantit Unft Price Amoun� LS Rework s�orm inle� due W wa[eAine inslalled al wron elevation 1.00 E1,985.00 E7,985.00 CY Remove cementious malerial found under exsUn road 149.00 520.00 E2,980.00 SY Ues hi h-earl stren th concrete for KnappCO iruck entrance 154.00 E42.00 E6,468.00 1.0 $385.00 E385.00 lS Credit-Treestum removal 1.0 E264.00 E264.00 LS Credit - Fix valve at 43rd street that was dama ed 100.0 515.00 E7.500.00 CY Unusedwnvactortumishedborrow 700.0 510.00 31.000.00 CY Unused overexwvation and placemenl af backfill 10.0 5150.00 E1.500.00 CV Unused 4' su e rock 1.0 535,000.00 $35,000.00 l5 Unuud dewaterin swpe Previous Total $39,649.00 Adjusled Total E11.433.00 Net Change ($28,276.00) Slatement of ConVact Original Conirect Amount E7,306,825.00 Nel Amount of Previous Additlons and Deductions $83,817.00 Net ConVad Amount Prior to This Request 51,390,636.00 Amwnt of This Request ($28,216.00) New ConVac� Amount $1,362,420.00 Percent Change in Conirecl Amounl -2.03Ye CONTRACTOR: PROJECTINSPECTOR: ACCEPTED BY Company: VF Anderson Builders LLC City, Slale: Peculiar MO 64078 Rewmmendetl: �� �R.�/{"l�}'� Cons cdan R nager Signed by. � �� Approved: .� Date: f 9 'v+ �� Date: ��/�/�,