HomeMy WebLinkAboutR-2012-145 Approving Change Order 1 and 2 for the Mattox Road Project RESOLUTION NO. R-2012-145
A RESOLUTION AUTHORIZING, APPROVING AND RATIFYING CHANGE ORDERS 1 AND
2 TO THE AGREEMENT BY AND BETWEEN THE CITY OF RIVERSIDE AND V.F.
ANDERSON BUILDERS FOR THE CONSTRUCTION OF THE MATTOX ROAD PROJECT
RESULTING IN A REVISED CONTRACT AMOUNT NOT TO EXCEED $1,362,420
WHEREAS, the City issued an Invitation to Bid for the Mattox Road Project which was
awarded to V.F. Anderson Builders pursuant to Resolution R-2012-066, and
WHEREAS, Change Order 1 to said contract INCREASES the total contract amount by
$83,811.00 and Change Order 2 provides for a credit and REDUCES the total contract by an
amount of $28,216.00, resulting in a NET INCREASE of $55,595.00; and
WHEREAS, the Board of Aldermen find it in the best interest of the City to formally
authorize, approve and ratify Change Orders 1 and 2 to the agreement with V.F. Anderson
Builders, resulting in a total revised contract amount not to exceed $1,362,420.00;
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE
CITY OF RIVERSIDE, MISSOURI, AS FOLLOWS:
THAT Change Orders 1 and 2 to the Agreement entered into by and between the City
and V.F. Anderson Builders and incorporated herein by reference resulting in a revised contract
amount not to exceed $1,362,420.00 are hereby authorized, ratified and approved.
FURTHER THAT the Mayor, City Administrator and all other required city officials are
authorized to execute the change order authorized herein together with any and all documents
necessary or incidental to the performance thereof and to take such other actions and/or
execute and deliver for and on behalf of the City all certificates, instruments, agreements and
other documents as may be deemed necessary or convenient to carry out and comply with the
intent of this Ordinance.
BE IT REMEMBERED that the above was PASSED AND APPROVED by a majority of
the Board of Aldermen and APPROVED by the Mayor of the City of Riverside, Missouri, this
�D"day of October, 2012.
Kathleen L. Rose, Mayor
ATTEST:
��=7';� o.�-L�.
Robin Littrell, City Clerk
Approved as to form:
�
/
a Tho son, City Attorney
MEMO DATE: October 25, 2012
AGENDA DATE: October 30, 2012
TO: Mayor and Board of Aldermen
FROM: Brad Haymond
RE: Change Order I for the Mattox Road Project.
BACKGROUND: NorthPoint previously presented options for the Mattox Road project to try and
the open concurrently with Premium Waters. The change to DIP for Phase II
was approved by a motion but never adopted as an ordinance.
OriginalContractAmount $1,306,825.00
Total of Previous Changes -0-
Total this Change Order +$83,81 I.00
Current Contract Total $1,390,636.00
RECOMMENDATION: NorthPoint recommends approval of the resolution and acceptance of the
change order with VF Anderson Builders for the Mattox Road project.
BUDGETARY IMPACT: We are currently under the allotted construction budget by $9,742.00
CITY OF RIVERSIDE
CHANGES IN PLANS AND CONSTRUCTION
Changes in Pians andlor Constructlon
Project Name: Mattox Road
Project Location: Riverside, Missouri Reauest #1
Project Number. *� rdaw,y w,re� m me ��ai �o,n�e.ma,,,x..�2,�nree w� cm� x,a,,,ee q.me u„waa a io.�nea saw�s �a�me q m<cmv,na as a 2sun ar a
Contract Date: 5/31I2012 �"^es �^ �^� �+� �.bw�ea auamm� r� me esu� Qu.mmo snow� m m� e;e amcosei.
Date Prepared: 8/28/2012 Page Number: 1 of 1
REQUIRED CHANGES IN PRESENT CONTRACT
Contract Item Item Description Nel Change Reason
No.
32 12" PVC decrease 1327 LF Changed to DIP sewer pipe in Phase 11 to speed up construction. 26 days were deducted from the contrect to match up with Premium Walers opening.
34 15" PVC decrease 69 LF See above
41 12' x 6' PVC Tee decrease 4 Ea See above
42 12" x 8" PVC 7ee decrease 1 Ea See above
12" OtP increase 1327 LF See above
15" DIP increase 69 LF See above
12' x 6' DIP 7ee increase 4 Ea See above
12" x 8" DIP Tee increase 1 Ea See above
CITY OF RIVERSIDE �
CAANGES IN PLANS AND CONSTRUCTION
RE�UEST N0.1
Projed Name: Matlox Road The following changes �o the original conlrad amounl were reQUi�ed to cover cost incurted by the Contredw or to retlect
Project I.ocalion: Riverside, Missouri savings realized by the Contractor as a result o( a change in ihe actual wnstruded quanfilies from Ihe estimated quanlilies
Projed Num6er, shown on ihe Bid Proposal.
Contrad Date: 5/3 112 01 2
Date Prepared: 8/28/2012 Page Number: 1 of 1
REqU1RED CHANGES IN PRESENT CONTRACT
Conirect ar Cont2ct or Conirect or New a New or New or
Previous Previous Previous Unit Item Description Adjusted Ad�usled Ad�usled
Quanti Unil Price Amounl QuanCn Unit Pdce Amounl
1,327.0 E51.00 567,677.00 LF 12" PVC Sewer Pipe
69.0 $67.00 $4,623.00 LF 15' PVC Sewer Pipe
4.0 E350.00 $1,400.00 EA 12" X 6' PVC Tee
1.0 E410.00 E410.00 EA 12" X 8' PVC Tee
LF 12' DIP SewerPipe 1.327.00 y109.00 8144.643.00
LF 15' DIP Sewer Pipe 69.00 E124.00 58,556.00
EA 12' X 6" DIP 7ee 4.00 E936.00 $3,744.00
EA 12' X 8' DIP Tee 1.00 E978.00 3978.00
Previous Tolal E74,110.00 Adjusted Tde 5157,921.00
Net Change E83,811.00
Statemenl of Contract
Original ConUacl Amount E1,306,825.00
Nel Amount of PrevioUS Addi�ions and Deduc[lon5
Nel Conlracl Amount Prior to Thls Request E1.306,825.00
Amount a/ This Raques[ $83,811.00
New ConUact Amount $7,390,636.00
Percent Change in Contrecl Amount 6.47 %
CONTRACTOR: PROJECT INSFECTOR: ACCEPTEO BY
Company. VF Anderson Builders LLC
Ciry, Slate: Pewliar MO 64078 Recommended: g� �Qt/{'Y) p(.�
Const qion Ma ager
Signed by: � I��/ Approved: _
Date: � Z 1 —_ _� �/�.5/� Z
Date:
MEMO DATE: October 25, 2012
AGENDA DATE: October 30, 2012
TO: Mayor and Board of Aldermen
FROM: Brad Haymond
RE: Change Order 2 for the Mattox Road Project.
BACKGROUND: NorthPoint previously presented Change Order I for the Mattox Road project.
Change Order 2 includes quantity adjustments and onsite items that came up
during construction.
Original ContractAmount $1,306,825.00
Total of Previous Changes +�g3�gl I.00
Total this Change Order -$28,216.00
Current Contract Total $1,362,420.00
RECOMMENDATION: NorthPoint recommends approval of the resolution and acceptance of the
change order with VF Anderson Builders for the Mattox Road project.
BUDGETARY IMPACT: We are currently under the allotted construction budget by $37,958.00
CITY OF RIVERSIDE �
CHANGES IN PLANS AND CONSTRUCTION
Changes in Plans andlor Construction
Project Name: Mattox Road
Project Localion: Riverside, Missouri Reauest #2
Project NUmber. me idwww+ w�m, a me anqnei mx�aa aman.,,n renwrea m m.ermm n�..�,e eyin, cor�„cm,,, b,rxa,.+�, m,a,e q�u„ ca,n„c�aac. �..,�a.
Conirect Dale: 5/3112012
aum� � ina.rwi mmm�aee o�+�R. rmm m. emmaw v���es mww m me en vrapmr
Dale Prepared: 10A t/2012 Page Number. i of 1
REpUIRED CHANGES IN PRESENT CONTRACT
Contrect Item Item Descriplion �uanL Change Net Dollar Change Reason
No.
Storm Line 82-83 1 iine raised increase $1.985 VFA had to relay lhe stortn line due to the relocated waterline being installed at fhe wrong elevalion
Cemenl Material increase 149 CY increase E2,980 Remove Cement like material found in �he subbase of the East side of Mattox Road on Phase I
Hi h-Earl Concrele increase 154 SY increase $6,468 �^1e switched from regular concrete to a high early conc2te fa KnappCo's iruck dock entrance lo shoAen the cure time hom 7 days �0 2 days
3 Tree Slump Removal decrease $385 decrease 3385 VFA did not remove lhe entire tree and caused MAW's conirecla to remove the stump and root ball that had been lefl
Fix MAW Valve decrease $264 decrease $264 VFP. damaged a valve al 43rd sireet ihat was repaired by MAW's Coniractor
6 Contrector Bortow decrease 100 CY decrease E1,500 On-site material was available and covered atl fill needed for the project
7 Overezcavation decrease 100 CY decrease E1,000 Overexcavation tor soft spots was not required
53 4" Su e Rock decrease 10 CV decrease �1,500 The surge rock was not used and deducted from the controcl
52 Dewaterin 1 lum sum devease $35,000 Dewatering was not required on this pmject due to ihe ground water level staying low
CITY OF RIVERSIDE - �
CHANGES 1N PLANS AND CONSTRUCTIOIV
RE�UE57 NO. 3
Project Name: Maltox Road The following changes to ihe original contred amount were required to cover wst incurted by Ihe Contrector or to reflect
Prqect Location: Riverside, Missouri savings realized by the Contredor as a result of a change in ihe aclual canstructed quanlNies trom Me estimaled quanlilies
Projecl Number: shown on the Bid Proposal.
ContraclOate: SI3112012
DatePrepared: t0111/2012
Page Number: 1 of 1
RE�UIRED CHANGES IN PRESENT CONTRACT
Con[racl or Conired or Conlract or New or New or New or
Previous Previous Previous Unit Item Description Adjusted Adjusted Adjusted
Quanfil Unil Price Amount �uantit Unft Price Amoun�
LS Rework s�orm inle� due W wa[eAine inslalled al wron elevation 1.00 E1,985.00 E7,985.00
CY Remove cementious malerial found under exsUn road 149.00 520.00 E2,980.00
SY Ues hi h-earl stren th concrete for KnappCO iruck entrance 154.00 E42.00 E6,468.00
1.0 $385.00 E385.00 lS Credit-Treestum removal
1.0 E264.00 E264.00 LS Credit - Fix valve at 43rd street that was dama ed
100.0 515.00 E7.500.00 CY Unusedwnvactortumishedborrow
700.0 510.00 31.000.00 CY Unused overexwvation and placemenl af backfill
10.0 5150.00 E1.500.00 CV Unused 4' su e rock
1.0 535,000.00 $35,000.00 l5 Unuud dewaterin swpe
Previous Total $39,649.00 Adjusled Total E11.433.00
Net Change ($28,276.00)
Slatement of ConVact
Original Conirect Amount E7,306,825.00
Nel Amount of Previous Additlons and Deductions $83,817.00
Net ConVad Amount Prior to This Request 51,390,636.00
Amwnt of This Request ($28,216.00)
New ConVac� Amount $1,362,420.00
Percent Change in Conirecl Amounl -2.03Ye
CONTRACTOR: PROJECTINSPECTOR: ACCEPTED BY
Company: VF Anderson Builders LLC
City, Slale: Peculiar MO 64078 Rewmmendetl: �� �R.�/{"l�}'�
Cons cdan R nager
Signed by. � �� Approved: .�
Date: f 9 'v+ �� Date: ��/�/�,