Loading...
HomeMy WebLinkAbout2004-02-12 Planning & Zoning Commission Minutes MINUTES PLANNING AND ZONING COMMISSION RIVERSIDE, MISSOURI February 12, 2004 The Planning and Zoning Commission for the City of Riverside, Missouri, met in regular session in the Board of Aldermen's Chamber at City Hall, 2950 Northwest Vivion Road, Riverside, Missouri. Barbara Snyder called the meeting to order at 7:30 p.m. The following members answered roll call: Al Bowman, Karen Gordy, Toni Looker, Shawn Lee, Ray Uhl and Barbara Snyder, Evelyn Poe. Aaron Locke, Jim Burch, Cy Houston, Mayor Betty Burch, Jim Smith and Mike Shelton were absent. Approval of Minutes- Shawn Lee moved that the minutes of January 22, 2004 January 22, 2004 minutes be approved as printed, Evelyn Poe seconded. The motion carried. Mike's Fireworks — 2421 NW Vivion Rd., Motion stated to go ahead as is with Building Permit & Site Plan stipulation of up lift calculations by City of Engineer. A sample of the metal shingles was submitted. Staff recommends the approval of the building permit, once calculations and stamped plans are submitted. Evelyn Poe moved to approve contingent upon engineering calculations being done. Karen Gordy seconded motion. Motion was carried. Shawn Lee opposed. Rinker Hydro Conduit — 4425 Van De Robert Blevins with Rinker Hydro Conduit Populer Road, Sign Permit attended. It was stated that the monument sign will be on the east side and inside the fence. There will also be a wall sign mounted on the building. The two existing wall signs will be removed. Staff Recommendations are to approve the sign permit. Shawn Lee moved to approve the sign permit. The motion seconded by Ray Uhl, the motion carried unanimously. Buildwiser Construction, LLC — 4801 -4867 Shawn Lee dismissed himself due to Homestead Rd & 4801 -4867 Homestead conflict of interest. Community Terr., Building Permits Development Coordinator recommends blanket building permits because Buildwiser does not fully know what will be encountered once gutting and inspection has occurred. It was discussed that wiring will need to meet city code and anything structural will need stamped plans. Buildwiser stated that the have an engineer on call. The project has been and will continue to be supervised by staff. It was also asked that the dumpsters be enclosed. Brent said that it was in discussion. The estimated time frame for this project to be finished would be the end of April. Staff will need to track progress for the Board of Alderman. Toni Looker moved to approve the permits, Karen Gordy seconded the motion, motion carried unanimously. Comment It was stated that in the Code that in earlier years the plans were to be stamped. It is now in the city codes and from here on forward, all plans will need to be stamped in all zoning districts except R -1. Codes for residential also needs to be change so that all plans will need to have a stamp. The meeting adjourned at 8:55 p.m. Mrs. Lynn Anderson with Anderson Backhoe also attended. She has issues for rental of space due to her location being in the GP -I zoning district. Acting Secretary