Loading...
HomeMy WebLinkAbout1312 CO 9 Kissick Construction Co. - Horizons Infrastructure BILL NO. 2014-040 ORDINANCE NOJ3 11" AN ORDINANCE AUTHORIZING AND APPROVING CHANGE ORDER 9 TO THE KISSICK CONSTRUCTION CO., INC. CONTRACT RESULTING IN AN APPROVED REVISED CONTRACT AMOUNT OF $1,652,283.19 WHEREAS, Briarcliff Realty, LLC and the City entered into that certain Master Development Agreement dated May 10, 2011 (the "MDA"); and WHEREAS, Briarcliff Realty, LLC assigned all its rights and obligations under the MDA, but not its rights and obligations under the MDA First Amendment, to Briarcliff Horizons, LLC, an affiliated entity of Briarcliff Realty, LLC pursuant to Section 12.5(b) of the MDA; and WHEREAS, on or about February 13, 2012, Briarcliff Horizons, LLC filed articles of amendment with the Missouri Secretary of State changing its name to Riverside Horizons, LLC ("Developer'); and WHEREAS, pursuant to the MDA, Developer agreed to construct and complete certain Public Infrastructure Improvements on the Briarcliff Horizons Site, as such terms are defined in the MDA; and WHEREAS, the MDA established Infrastructure Phase 1 improvements to consist of the lakes, canals, and landscaping, and further established the cost estimate and budget for the Infrastructure Phase I Improvements to be Thirteen Million One Hundred Forty-Six Thousand Six Hundred Eighty-Three Dollars ($13,146,683.00); and WHEREAS, on or about August 21, 2011, Developer competitively bid the Infrastructure Project as defined in the MDA and subsequently submitted its recommendation to the City to award a portion of the project known as Horizons Earthwork/ Site Utilities (City Project No. 607- 001) to Kissick Construction Co., Inc. ("Kissick"); and WHEREAS, on or about November 1, 2011, the Board of Aldermen approved Kissick as the contractor to perform construction services related to the Site Utilities portion of Horizons Earthwork/Site Utilities; and WHEREAS, on or about November 15, 2011, Developer entered into an agreement with Kissick to perform construction services related to a portion of the Horizons Earthwork / Site Utilities in an amount not to exceed Nine Hundred Ninety-Two Thousand Eight Hundred Twenty-Four Dollars and Forty-Six Cents ($992,824.46) ("Kissick Contract"); and WHEREAS, on or around August 1, 2012, Developer assigned all of its duties and obligations under the MDA to construct and complete the public infrastructure and other public improvements as set forth in the MDA to Northpoint Development, LLC ("NPD") pursuant to Section 12.5(b) of the MDA; and WHEREAS, the Board has previously approved Change Orders 1-8 to the Kissick Contract for a total net cost INCREASE pursuant to Change Orders 1-8 of One Hundred Seventy-Five Thousand Five Hundred Seventy-Six Dollars and Seventy-Three Cents 1 WA 5114990.2 ($175,576.73), to increase the overall contract total to One Million One Hundred Sixty-Eight Thousand Four Hundred One Dollars and Nineteen Cents ($1,168,401.19); and WHEREAS, NPD and Kissick request approval of, and City staff recommend and request the Board to approve, the following Change Order 9 attached hereto as Attachment A and incorporated herein, to the Kissick Contract: Change Order 9: a) Addition for storm sewers related to the extension of 4151 and 43rd Streets resulting in an increase in the contract amount of$57,187; b) Addition for sanitary sewers related to the extension of 415' and 43`d Streets resulting in an increase in the contract amount of$176,370; C) Addition for water services related to the extension of 415' and 43`d Streets resulting in an increase in the contract amount of$250,325; For a total net cost INCREASE pursuant to Change Order 9 of Four Hundred Eighty- Three Thousand Eight Hundred Eighty-Two Dollars ($483,882.00) to increase the overall contract total to One Million Six Hundred Fifty-Two Thousand Two Hundred Eighty-Three Dollars and Nineteen Cents ($1,652,283.19) for Kissick; and WHEREAS, Sections 5.5 and 5.6 of the MDA require City approval for all change orders to the Infrastructure Construction Documents; and WHEREAS, the Board of Aldermen find that Change Order 9 to the Kissick Contract is in the best interest of the City in that such action fulfills a public purpose and will further the growth of the City, facilitate the development of the entire Horizons site, improve the environment of the City, foster increased economic activity within the City, increase employment opportunities within the City and otherwise is in the best interests of the City by furthering the health, safety, and welfare of its residents and taxpayers. NOW THEREFORE, BE IT ORDAINED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE, MISSOURI, AS FOLLOWS: SECTION 1. BEST INTEREST OF THE CITY TO APPROVE CHANGE ORDER. NPD and Kissick request approval of, and City staff recommend and request the Board to approve, Change Order 9 to the Kissick Contract, attached hereto as Attachment A and incorporated herein, and the Board finds it is in the best interest of the City and that such approval fulfills a public purpose and will further the growth of the City, facilitate the development of the entire Horizons site, improve the environment of the City, foster increased economic activity within the City, increase employment opportunities within the City and otherwise is in the best interests of the City by furthering the health, safety, and welfare of its residents and taxpayers, to approve Change Order 9, and the Board does hereby approve of Change Order 9 as follows: a) Addition for storm sewers related to the extension of 4151 and 43`d Streets resulting in an increase in the contract amount of$57,187; 2 WA 5114990.2 b) Addition for sanitary sewers related to the extension of 4151 and 43rd Streets resulting in an increase in the contract amount of$176,370; C) Addition for water services related to the extension of 4151 and 43rd Streets resulting in an increase in the contract amount of$250,325; For a total net cost INCREASE pursuant to Change Order 9 of Four Hundred Eighty- Three Thousand Eight Hundred Eighty-Two Dollars ($483,882.00) to increase the overall contract total to One Million Six Hundred Fifty-Two Thousand Two Hundred Eighty-Three Dollars and Nineteen Cents ($1,652,283.19) for Kissick. SECTION 2. AUTHORITY TO EXECUTE. The Mayor, City Administrator and all other required city officials are authorized to execute the change order authorized herein, together with any and all documents necessary or incidental to the performance thereof, and to take such other actions and/or execute and deliver for and on behalf of the City all certificates, instruments, agreements and other documents as may be deemed necessary or convenient to carry out and comply with the intent of this Ordinance. SECTION 3. EFFECTIVE DATE. This Ordinance shall be in full force and effect from and after the date of its passage and approval. BE IT REMEMBERED that the above was PASSED AND APPROVED by a majority of the Board of Aldermen, and APPROVED by the Mayor of the City of Riverside, Missouri, this 6th day of May, 2014. Q Kathleen L. Rose, Mayor ATTEST; Robin Littrell,.Ci Clerk Approved as to form: Spencer a Britt & Browne LLP Special oun I to the City By Joe Be nar 3 WA 5114990.2 ATTACHMENT A COVER MEMO, CHANGE ORDER 9, AND BACKUP DOCUMENTS 4 WA 5114990.2 CITY OF Upstream from ordinary. 2950 NW Vivion Road Riverside, Missouri 64150 MEMO DATE: April 29', 2014 AGENDA DATE: May 6", 2014 TO: Mayor and Board of Aldermen FROM: Travis Hoover RE: Change Order 9: KISSICK CONSTRUCTION Horizons Earthwork& Site Utilities (607-001) BACKGROUND: Change Orders 1-8 to the contract with Kissick were previously approved for site utility work on Horizons phase I. Change Order 9 includes the sanitary sewer, storm sewer, and waterlines necessary for the extension of NW 41 st and NW 43rd Streets East approximately 1400 If each. The work will be done in accordance with Olsson Plans dated 03/31/2014 including Revision I dated 04/09/14, which were approved on April 15, 2014. The change is further detailed in letter proposal "41st and 43rd St Road Extensions" dated April 28, 2014 by Kissick Construction Company. Final approval and design of water line to be completed by MAWC and approved by Riverside Fire Department; unit rates to be adjusted accordingly. Sanitary sewer plans are under review by KCMO water services, so any significant changes as a result of that review may result in additional costs. BUDGETARY IMPACT: The addition of $483,882.00 for Change Order No. 9 will result in a total amount of $1,652,283.19 for construction under the contract with Kissick Construction. Original Contract Amount $ 992,824.46 Total of Previous Changes $ 175,576.73 Total this Change Order $ 483,882.00 Current Contract Total $ 1,652,283.19 RECOMMENDATION: Staff recommends approval of the ordinance and acceptance of the change order with Kissick Construction for Horizons Earthwork & Site Utilities. urrw CHANGE ORDER NO, 9 P.wrA.mr.v Contractor Name:Kiaslek ConstrutXlon ny.a rtwpa Hadwra Earthwork f Skf UOrales pal..,ta..we 1pzur- c.aw : 1711/2011 Tbb tafaan0 chwq bwb ana"avnlbblbmpwl waN imam bwr«wY bewne by ft*dLawtb:a Ftilw o.Momwl tM Cbnkbdw w b r10mdmrbW ndlwd by M CwMrJw w•r"A w b dares In bN Dew OW*kUaod WwAn Som a*Illbnb110 v"106"Yml.n w am ON hapoW. flee r U+.hwntla Pwi'wMw P:b.Ms°f Pmbp°r UM SmtMmmtuaaYmnppmbeesa Uuuuuu . pChfWYWmaO.Fw.d.awbr1Y1rY11It mwImNwNrtwp.MebMrAWC.eaf.2OIam.11Plu.6a.daaOma Mm]OI.laap pwrplPllwwl MlahNplp+wmN..wm: AA*mP.Wsmtt+oammmm A4.00 rPm Will P�ft A MNw y t 7f!T 00 ft 0 $290 sm am a W 00 A. 0 tom P.bvIplY TpY 4W •m NY CAwp1 NM An Amwtnl $175, AS NY Am Imm dP PvwW TM Rid ObwRlbna .1Td,fTd.T] AY ofT is RW% rbrb This RPgNY f1.1ee.=.19W Nw Cc w 7AY mounk fM2,eef.lq N°wwd ChwQ In f1,Of2,41.41p PwCMI Cbnq b CwMPw Amaunl 11.11% DESIGN ENGINEER: CITY OP RMRSIDE.MISSOURI: c..p.s &L'S,,Stow.lJfo1C.F77FS CRY Engineer. .. _... p.n.11.r✓: t'CO 9'ZeAwO.PY/ Tn Hw.w so" Ibb ow: jr/2/AY a"Wk IpM em. CONTRACTOR: ON-SITE PROJECT MANAGER: COHrRACTORS Qwall w CMnw 2aft RG rn.wlsrabacwlRAerae�waorr awbm b.wpbpwwm MCwb.YtbwppmAMmWsl.a+mraipn e..aaara.wlpa.prpaaaMrMeaslRAcroRe Maw mrownpwwpas..Mp.w rgwMnwpwi pwmwlp psarmtl MpmmlmMplb.w4pN IM blM p:wpYYMIWdManW pd.a paYb✓.blarrWw. MM.IMamM Nwn.IMlNNp pllb Wr YItYM°M pM bMa M.o04pM+W Ybnrw a.11.w.pllbMplb .Ma..p/yna.rpYa+.pP mW PewMapMMai/antlMalm.amrml.p4.ra MIMMp. Y.MYN.Ni.I1.P4P1:..MYbMRl1�°•°J�V$�WaYnM.la.l.r 1. ppn.Pu+la'q�viak ConsUP mcmawy p..r:pw k „dMbM'US K CONSTRUCTION S S I C K COMPANY April 28th,2014 Mr. Mark Pomerenke Briarcliff Horizons, LLC 4151 N. Mulberry Drive Suite 205 Kansas City, MO 64116 Re: Horizons Development Site Utilities Dear Mark: Kissick Construction Co. submits for your review our proposal for the Site Utilities for the referenced project. Our proposal is based on the sanitary sewer drawings dated April 4, 2014 and the civil drawings dated March 31, 2014 and revision 1 date April 9`h, 2014. Our proposal is summarized as follows: I) Storm Sewers 24"RCP 480 LF 24"RCP End Sections 12 Each Flowable fill backfill is included for the pipe installation on 43rd Street. 11) Sanitary Sewers 12"SDR 21 PVC 544 LF 6"SDR 21 PVC 90 LF 4' Diameter Manholes 5 Each Adjust Sanitary Manholes 1.5 VF III) Water Services 12"Cl. 350 DIP 2700 LF Fire Hydrants 10 Each We offer the following clarifications with our proposal: I) We have included performance and payment bond in our proposal. 2) Survey and layout for our work is included. P.7"Al 8131 Indiana Ave., Kansas City,MO 64132 Telephone(816)363-5530 FAX(816)523-1557 (AbC 3) Sales tax is excluded. 4) We have assumed any excess excavated soil can remain on site. 5) We have based our proposal on the assumption that any water encountered in our excavation can be handled with sump pumps. If well points are required,we anticipate the costs to install,operate and remove this dewatering system will cost approximately$75,000. 6) We have included in our proposal the cost to wrap the sanitary sewer main and bedding aggregate in a filter fabric. This was a requirement on our previous installation and thus we have assumed it will be required again. 7) We have included in our proposal the unit costs that make up the waterline installation on the following attached sheet. 8) If height adjustments are required for existing manholes,the unit rate of $270 per vertical foot shall apply with a minimum of$270 per adjustment. 9) We have included the hydrant crossings as shown on sheet C 13.01 with the exception of installing HDPE pipe in lieu of RCP. Our lump sum proposal for this work is as follows: Storm Sewer $57,187 Sanitary Sewer $176,370 Water Services $250.325 $483,882 If you need additional information or have any questions,please do not hesitate to contact me. Sincerely, KISSICK CONSTRUCTION CO. John Garvey Project Manager 8131 Indiana Ave.,Kansas City,MO 64132 Telephone(816)363-5530 FAX(816) 523-1557 A C Pe r � Item No. !Bid Item Description Quantity Unit 'Unit Price Total 1 Connect to Existing System 2EA $ 5,700.00 $ 11,400.00 2 12" Gate Valve _ _ _ _ 4: EA $ 1,785.00 $ 7,140.00 3 Waterline Extension(12" DIP) 2700 LF $ 64.00 $ 172,800.00 4 Fire Hydrant Assembly 10: EA $ 4,894,00 $ 48,940.00 5 24"x 12"Reducer 1 EA $ 1,150.00 $ 1,150.00 6 12"45 Degree Bend 4 EA $ 290.00 $ 1,160.00 7 12"45 Degree Bend 4 EA $ 245.00 $ 980.00 8 12"22.5 Degree Bend 4 EA $ 225.00 $ 900.00 9 12"x 12"Tee 1 EA $ 455.00 $ 455.00 10 Thrust Blocks/Cross Blocks 8 EA $ 675.00 $ 5,400.00 $ 250,325.00