Loading...
HomeMy WebLinkAboutFwd FW Phase 1 Plans to Grout Pipeline in LCA---------- Forwarded message ---------- From: Jason Davis <jdavis@affinis.us> Date: Fri, 12 Oct 2012 11:20:42 -0500 Subject: FW: Phase 1 Plans to Grout Pipeline in LCA To: "Michael.McMillion@amwater.com" <Michael.McMillion@amwater.com> Cc: "Ben Drake (ben.rqbld@gmail.com)" <ben.rqbld@gmail.com>, "Detrick, Charles W NWK" <Charles.W.Detrick@usace.army.mil>, Brent Miles <bmiles@northpointkc.com>, "Don Coleman (donpcoleman@yahoo.com)" <donpcoleman@yahoo.com>, "jeffg@completehomeconcepts.com" <jeffg@completehomeconcepts.com>, "Richie Benninghoven (rcb@usckc.com)" <rcb@usckc.com>, Ron Super <rsuper@kc.rr.com>, RQLD Mike McGinness <mmcginness@mcginness-shaw.com>, Rick Worrel <rworrel@affinis.us>, Blake Madden <bmadden@affinis.us> Mike, I have taken a look at the revised plan sheet (attached for those cc'd). The grouting procedures will require excavation in order to gain access to the pipe. Therefore excavation and backfill requirements will need to remain in the Phase 1 work. Please provide a complete set of the construction documents for Phase 1 and Phase 2 for review. We need to review the complete set versus plan sheets sent piece meal. Providing the construction documents as pdf files is acceptable. The Levee District is concerned on your proposed construction time line. Can you provide justification on why removal of the pipeline will not occur until the end of 2013? Please contact me with any questions. Thanks, Jason Jason D. Davis, P.E., Vice President, Federal Services Affinis Corp | BUILDING LONG-LASTING RELATIONSHIPS | www.affinis.us<http://www.affinis.us/> Named a "Best Firm to Work for in Civil Engineering" by CE News - 2007, 2008, 2010 & 2012 [cid:image001.jpg@01CDA868.B7E1B4E0]<http://www.affinis.us/secNew/section/25Under25.htm> 7401 W. 129th Street, Suite 110 | Overland Park, KS 66213 Direct: 913-239-1106 | Mobile: 913-634-6278 | Fax: 913-239-1111 | Toll-free: 1-877-527-5468 Follow us on: [cid:image002.jpg@01CDA868.B7E1B4E0] <http://www.facebook.com/home.php?#!/pages/Affinis-Corp/308999976861?ref=search&sid=KRiXs-FtcoqULBN71qICiQ.19290190..1> and [cid:image003.jpg@01CDA868.B7E1B4E0] <http://twitter.com/AffinisCorp> This email and any files transmitted with it are confidential and are solely intended for the individual or entity to whom they are addressed. If you are not the intended recipient or the person responsible for delivering the email to the recipient, be advised that you have received this email in error and that any use, dissemination, forwarding, printing, or copying of this email is strictly prohibited. If you have received this email in error, please reply to sender and take the steps necessary to delete this message completely from your computer system. Thank you. From: Michael.McMillion@amwater.com [mailto:Michael.McMillion@amwater.com] Sent: Thursday, October 11, 2012 11:20 AM To: Jason Davis Cc: Ben Drake Subject: Phase 1 Plans to Grout Pipeline in LCA Jason, Since we are splitting up our "Water Main Retirement in the RQBLD Levee" project into 2 phases for grouting & removal I have updated our plan sheet for Phase 1. I removed notes related to the removal of the pipe in the levee structure; only referencing that this will be Phase 2 to be bid 8/1/2013. All notes for the grout in place procedure are what had previously been approved by RQBLD & the USACE. The future Phase 2 plans will only reference the removal of the pipeline in the levee structure. I just wanted you to be aware of this change. The plan sheets sent out for Phase 1 will include: Plan Sheet 1 - title page with project location overview with the necessary contact info. Only the title will change to only reference the grouting. Plan Sheet 2 - Legend page with typical plan sheet symbols as well as describing the Levee Elevation Datum NGVD29; no change except for the project title only referencing Phase 1 Grouting. Plan Sheet 3 - attached below Let me know if you have any notes related to this plan for just the grouting of the void pipeline in the LCA. Sincerely, Mike McMillion, PE Project Engineer Missouri American Water mcmillion@amwater.com<mailto:mcmillion@amwater.com> 314-996-2335 ##################################################################################### Scanned by MailMarshal - Marshal's comprehensive email content security solution. Download a free evaluation of MailMarshal at www.marshal.com #####################################################################################