HomeMy WebLinkAboutFwd FW Phase 1 Plans to Grout Pipeline in LCA---------- Forwarded message ----------
From: Jason Davis <jdavis@affinis.us>
Date: Fri, 12 Oct 2012 11:20:42 -0500
Subject: FW: Phase 1 Plans to Grout Pipeline in LCA
To: "Michael.McMillion@amwater.com" <Michael.McMillion@amwater.com>
Cc: "Ben Drake (ben.rqbld@gmail.com)" <ben.rqbld@gmail.com>, "Detrick,
Charles W NWK" <Charles.W.Detrick@usace.army.mil>, Brent Miles
<bmiles@northpointkc.com>, "Don Coleman (donpcoleman@yahoo.com)"
<donpcoleman@yahoo.com>, "jeffg@completehomeconcepts.com"
<jeffg@completehomeconcepts.com>, "Richie Benninghoven
(rcb@usckc.com)" <rcb@usckc.com>, Ron Super <rsuper@kc.rr.com>, RQLD
Mike McGinness <mmcginness@mcginness-shaw.com>, Rick Worrel
<rworrel@affinis.us>, Blake Madden <bmadden@affinis.us>
Mike,
I have taken a look at the revised plan sheet (attached for those
cc'd). The grouting procedures will require excavation in order to
gain access to the pipe. Therefore excavation and backfill
requirements will need to remain in the Phase 1 work.
Please provide a complete set of the construction documents for Phase
1 and Phase 2 for review. We need to review the complete set versus
plan sheets sent piece meal. Providing the construction documents as
pdf files is acceptable.
The Levee District is concerned on your proposed construction time
line. Can you provide justification on why removal of the pipeline
will not occur until the end of 2013?
Please contact me with any questions.
Thanks,
Jason
Jason D. Davis, P.E., Vice President, Federal Services
Affinis Corp | BUILDING LONG-LASTING RELATIONSHIPS |
www.affinis.us<http://www.affinis.us/>
Named a "Best Firm to Work for in Civil Engineering" by CE News -
2007, 2008, 2010 & 2012
[cid:image001.jpg@01CDA868.B7E1B4E0]<http://www.affinis.us/secNew/section/25Under25.htm>
7401 W. 129th Street, Suite 110 | Overland Park, KS 66213
Direct: 913-239-1106 | Mobile: 913-634-6278 | Fax: 913-239-1111 |
Toll-free: 1-877-527-5468
Follow us on: [cid:image002.jpg@01CDA868.B7E1B4E0]
<http://www.facebook.com/home.php?#!/pages/Affinis-Corp/308999976861?ref=search&sid=KRiXs-FtcoqULBN71qICiQ.19290190..1>
and [cid:image003.jpg@01CDA868.B7E1B4E0]
<http://twitter.com/AffinisCorp>
This email and any files transmitted with it are confidential and are
solely intended for the individual or entity to whom they are
addressed. If you are not the intended recipient or the person
responsible for delivering the email to the recipient, be advised that
you have received this email in error and that any use, dissemination,
forwarding, printing, or copying of this email is strictly prohibited.
If you have received this email in error, please reply to sender
and take the steps necessary to delete this message completely from
your computer system.
Thank you.
From: Michael.McMillion@amwater.com [mailto:Michael.McMillion@amwater.com]
Sent: Thursday, October 11, 2012 11:20 AM
To: Jason Davis
Cc: Ben Drake
Subject: Phase 1 Plans to Grout Pipeline in LCA
Jason,
Since we are splitting up our "Water Main Retirement in the RQBLD
Levee" project into 2 phases for grouting & removal I have updated our
plan sheet for Phase 1.
I removed notes related to the removal of the pipe in the levee
structure; only referencing that this will be Phase 2 to be bid
8/1/2013. All notes for the grout in place procedure are what had
previously been approved by RQBLD & the USACE. The future Phase 2
plans will only reference the removal of the pipeline in the levee
structure.
I just wanted you to be aware of this change. The plan sheets sent
out for Phase 1 will include: Plan Sheet 1 - title page with project
location overview with the necessary contact info. Only the title
will change to only reference the grouting. Plan Sheet 2 - Legend
page with typical plan sheet symbols as well as describing the Levee
Elevation Datum NGVD29; no change except for the project title only
referencing Phase 1 Grouting. Plan Sheet 3 - attached below
Let me know if you have any notes related to this plan for just the
grouting of the void pipeline in the LCA.
Sincerely,
Mike McMillion, PE
Project Engineer
Missouri American Water
mcmillion@amwater.com<mailto:mcmillion@amwater.com>
314-996-2335
#####################################################################################
Scanned by MailMarshal - Marshal's comprehensive email content
security solution.
Download a free evaluation of MailMarshal at www.marshal.com
#####################################################################################