HomeMy WebLinkAboutFwd Phase 1 Water Line Abandonment - RQLD Comments 2
---------- Forwarded message ----------
From: Jason Davis <jdavis@affinis.us>
Date: Fri, Nov 16, 2012 at 11:30 AM
Subject: Re: Phase 1 Water Line Abandonment - RQLD Comments
To: "Michael.McMillion@amwater.com" <Michael.McMillion@amwater.com>
Cc: "Ben Drake (ben.rqbld@gmail.com)" <ben.rqbld@gmail.com>, Blake
Madden <bmadden@affinis.us>, Brent Miles <bmiles@northpointkc.com>, "Don
Coleman (donpcoleman@yahoo.com)" <donpcoleman@yahoo.com>,
"jeffg@completehomeconcepts.com" <jeffg@completehomeconcepts.com>,
"mmcginness@mcginness-shaw.com" <mmcginness@mcginness-shaw.com>, "Richie
Benninghoven (rcb@usckc.com)" <rcb@usckc.com>, Ron Super
<rsuper@kc.rr.com>, Rick Worrel <rworrel@affinis.us>, "Travis Hoover
(thoover@riversidemo.com)" <thoover@riversidemo.com>
Mike,
The modifications requiring grouting to the vault are acceptable.
Let me know if you have any questions.
Thanks,
Jason
Jason Davis
Vice President, Federal Services
Affinis Corp
Mobile: 913.634.6278
On Nov 15, 2012, at 11:44, "Michael.McMillion@amwater.com"
<Michael.McMillion@amwater.com> wrote:
> Jason,
>
> Attached below is the updated plan sheet #3 for the Phase 1 Grout in
Place. This change was based on our conversation during the pre-bid
meeting site visit.
>
>
> Please let me know if you have comments. I would like to get this
plan sheets to the bidding contractors as soon as possible.
>
> Some brief notes on what was changed:
> - The east excavation was moved to a point 25' east of the BNSF RR
spur, a note was included requiring excavation/backfill per BNSF
standards.
> - Included note for west excavation that RQBLD standards must be
followed since it is within the LCA.
> - Removed excavations near projected levee slopes
> - Included note that the ease & west excavations be the beginning
points of the up slope grouting of the pipe
> - Added note that the exiting water vault be used to access the up
slop ends of the grouting
> - Highlighted levee access path blue, included note that only light
trucks will be allowed on this path to access the water vault atop the
levee.
>
> Sincerely,
>
> Mike McMillion, PE
> Project Engineer
> Missouri American Water
> mcmillion@amwater.com
> 314-996-2335
> <updated p.3 of Phase 1_11-15-12.pdf>
########################################################################
#############