Loading...
HomeMy WebLinkAboutFwd Phase 1 Water Line Abandonment - RQLD Comments 2 ---------- Forwarded message ---------- From: Jason Davis <jdavis@affinis.us> Date: Fri, Nov 16, 2012 at 11:30 AM Subject: Re: Phase 1 Water Line Abandonment - RQLD Comments To: "Michael.McMillion@amwater.com" <Michael.McMillion@amwater.com> Cc: "Ben Drake (ben.rqbld@gmail.com)" <ben.rqbld@gmail.com>, Blake Madden <bmadden@affinis.us>, Brent Miles <bmiles@northpointkc.com>, "Don Coleman (donpcoleman@yahoo.com)" <donpcoleman@yahoo.com>, "jeffg@completehomeconcepts.com" <jeffg@completehomeconcepts.com>, "mmcginness@mcginness-shaw.com" <mmcginness@mcginness-shaw.com>, "Richie Benninghoven (rcb@usckc.com)" <rcb@usckc.com>, Ron Super <rsuper@kc.rr.com>, Rick Worrel <rworrel@affinis.us>, "Travis Hoover (thoover@riversidemo.com)" <thoover@riversidemo.com> Mike, The modifications requiring grouting to the vault are acceptable. Let me know if you have any questions. Thanks, Jason Jason Davis Vice President, Federal Services Affinis Corp Mobile: 913.634.6278 On Nov 15, 2012, at 11:44, "Michael.McMillion@amwater.com" <Michael.McMillion@amwater.com> wrote: > Jason, > > Attached below is the updated plan sheet #3 for the Phase 1 Grout in Place. This change was based on our conversation during the pre-bid meeting site visit. > > > Please let me know if you have comments. I would like to get this plan sheets to the bidding contractors as soon as possible. > > Some brief notes on what was changed: > - The east excavation was moved to a point 25' east of the BNSF RR spur, a note was included requiring excavation/backfill per BNSF standards. > - Included note for west excavation that RQBLD standards must be followed since it is within the LCA. > - Removed excavations near projected levee slopes > - Included note that the ease & west excavations be the beginning points of the up slope grouting of the pipe > - Added note that the exiting water vault be used to access the up slop ends of the grouting > - Highlighted levee access path blue, included note that only light trucks will be allowed on this path to access the water vault atop the levee. > > Sincerely, > > Mike McMillion, PE > Project Engineer > Missouri American Water > mcmillion@amwater.com > 314-996-2335 > <updated p.3 of Phase 1_11-15-12.pdf> ######################################################################## ############# Scanned by MailMarshal - Marshal's comprehensive email content security solution. Download a free evaluation of MailMarshal at www.marshal.com ######################################################################## #############