HomeMy WebLinkAboutFwd Phase 1 Water Line Abandonment - RQLD Comments
---------- Forwarded message ----------
From: <Michael.McMillion@amwater.com>
Date: Thu, Nov 15, 2012 at 11:43 AM
Subject: RE: Phase 1 Water Line Abandonment - RQLD Comments
To: jdavis@affinis.us
Cc: "Ben Drake (ben.rqbld@gmail.com)" <ben.rqbld@gmail.com>, Blake
Madden <bmadden@affinis.us>, Brent Miles <bmiles@northpointkc.com>, "Don
Coleman (donpcoleman@yahoo.com)" <donpcoleman@yahoo.com>,
"jeffg@completehomeconcepts.com" <jeffg@completehomeconcepts.com>,
"mmcginness@mcginness-shaw.com" <mmcginness@mcginness-shaw.com>, "Richie
Benninghoven (rcb@usckc.com)" <rcb@usckc.com>, Ron Super
<rsuper@kc.rr.com>, Rick Worrel <rworrel@affinis.us>, "Travis Hoover
(thoover@riversidemo.com)" <thoover@riversidemo.com>
Jason,
Attached below is the updated plan sheet #3 for the Phase 1 Grout in
Place. This change was based on our conversation during the pre-bid
meeting site visit.
Please let me know if you have comments. I would like to get this plan
sheets to the bidding contractors as soon as possible.
Some brief notes on what was changed:
- The east excavation was moved to a point 25' east of the BNSF RR
spur, a note was included requiring excavation/backfill per BNSF
standards.
- Included note for west excavation that RQBLD standards must be
followed since it is within the LCA.
- Removed excavations near projected levee slopes
- Included note that the ease & west excavations be the beginning
points of the up slope grouting of the pipe
- Added note that the exiting water vault be used to access the up slop
ends of the grouting
- Highlighted levee access path blue, included note that only light
trucks will be allowed on this path to access the water vault atop the
levee.
Sincerely,
Mike McMillion, PE
Project Engineer
Missouri American Water
mcmillion@amwater.com
314-996-2335