Loading...
HomeMy WebLinkAboutFwd l-385 Deficiency Meeting Summary ---------- Forwarded message ---------- From: Doncoleman <donpcoleman@yahoo.com> Date: Sun, Nov 25, 2012 at 4:23 PM Subject: Re: l-385 Deficiency Meeting Summary To: Jason Davis <jdavis@affinis.us> Cc: Brent Miles <bmiles@northpointkc.com>, "jeffg@completehomeconcepts.com" <jeffg@completehomeconcepts.com>, "RichieBenninghoven (rcb@usckc.com)" <rcb@usckc.com>, Ron Super <rsuper@kc.rr.com>, "mmcginness@mcginness-shaw.com" <mmcginness@mcginness-shaw.com>, "BenDrake (ben.rqbld@gmail.com)" <ben.rqbld@gmail.com>, "Kimes, Thomas(Thomas.Kimes@hdrinc.com)" <Thomas.Kimes@hdrinc.com>, "Mike Duffy(mduffy@cityofriversidemo.com)" <mduffy@cityofriversidemo.com>, Rick Worrel <rworrel@affinis.us>, Blake Madden <bmadden@affinis.us>, Kathy Rose <krose@riversidemo.com> To All: Regarding Jason's point 5, the city of Riverside has always told the levee district that they are responsible for interior drainage and that the RQLD is only responsible for the lines from the levee to the river. The issue arose concerning construction of various "collector" lines to bring them to a common point to go through the levee. This has nothing to do with whether local tax or federal dollars paid for the improvements. Let's not confuse the issue of where the city stops and the levee district starts. I believe that what the Corps wants is to have a definition of who will be responsible for inclusion in the O &M manual of who will maintain those collector lines, not necessarily wanting to pin it on RQLD. Sent from my iPad Don Coleman 816-916-8383 On Nov 20, 2012, at 2:21 PM, Jason Davis <jdavis@affinis.us> wrote: Gentlemen, I have attached a summary of the meeting held with John Benson, Charlie Detrick, Don Coleman, Ben Drake and Jason Davis this morning. In general, the meeting was held to verify/confirm the status of the deficiencies listed in the MOA Exhibit A. The meeting did include some discussion on O&M agreements when asked by USACE for documentation to include within the O&M Manual. Items Noted during meeting: 1. USACE will provide as-builts for work performed by USACE (ex. Line Creek work, QPS outfall, etc.). USACE also intends to send their survey crew out to capture utility crossings and associated overbuild. 2. Relief Well at QPS. The clay liner will be a changed condition to the design assumptions for the relief well design. Since USACE has committed the Napoleon crew to perform the liner work Jason Davis will request that Continental modify their calculations for the changed condition. The liner should increase the factor of safety. Previous discussions with Continental indicated that they would be willing to perform this change to their calculations. 3. Cat II, Item 1. Checking for vertical gaps at transition walls. Jason Davis will forward USACE meeting minutes and Gary Van Riessen’s recommendation letter (2009) to all to refresh everyone’s memory on past discussions. Everyone agreed that this item will require additional discussion to determine the way forward. 4. Cat II, Item 5. USACE is currently working to provide an amendment to the MOA to remove the upper Line Creek deficiency from the MOA list. 5. During deficiency discussions USACE requested agreements for maintenance of the 14 interior drainage structures and Detention Pond be provided for incorporation into the O&M. This then led into maintenance responsibility discussion. USACE will look to the Levee District as the responsible party for maintenance of all project improvements. The Levee District can then decide how they would like to perform the maintenance responsibilities. USACE is defining project improvements as any improvement that had Federal dollars spent for the project. 6. Jason Davis will forward the Weko-Seal required maintenance to Charlie Detrick to include within the O&M Manual. 7. USACE will forward the Burlington Creek analysis and report to Jason Davis. I have attached a MOA Exhibit A list provided by John Benson at the meeting this morning summarizing USACE status of the deficiencies. Feel free to contact me with any questions. Thanks, Jason Jason D. Davis, P.E., Vice President, Federal Services Affinis Corp | BUILDING LONG-LASTING RELATIONSHIPS | www.affinis.us <http://www.affinis.us/> Named a "Best Firm to Work for in Civil Engineering" by CE News - 2007, 2008, 2010 & 2012 <image001.jpg> <http://www.affinis.us/secNew/section/25Under25.htm> 7401 W. 129th Street, Suite 110 | Overland Park, KS 66213 Direct: 913-239-1106 | Mobile: 913-634-6278 | Fax: 913-239-1111 | Toll-free: 1-877-527-5468 Follow us on: <image002.jpg> <http://www.facebook.com/home.php?#!/pages/Affinis-Corp/308999976861?ref =search&sid=KRiXs-FtcoqULBN71qICiQ.19290190..1> and <image003.jpg> <http://twitter.com/AffinisCorp> This email and any files transmitted with it are confidential and are solely intended for the individual or entity to whom they are addressed. If you are not the intended recipient or the person responsible for delivering the email to the recipient, be advised that you have received this email in error and that any use, dissemination, forwarding, printing, or copying of this email is strictly prohibited. If you have received this email in error, please reply to sender and take the steps necessary to delete this message completely from your computer system. Thank you. ________________________________ Scanned by MailMarshal - Marshal's comprehensive email content security solution. Download a free evaluation of MailMarshal at www.marshal.com <http://www.marshal.com> ________________________________ <2012-11-20 MOA Deficiency status.pdf>