HomeMy WebLinkAbout2013-08 RQLD Comments - Updated Plan Sheets for Water Main Removal in RQBLD Levee
---------- Forwarded message ----------
From: Jason Davis <jdavis@affinis.us>
Date: Fri, Aug 16, 2013 at 8:22 AM
Subject: RQLD Comments - Updated Plan Sheets for Water Main Removal in
RQBLD Levee
To: "Michael.McMillion@amwater.com" <Michael.McMillion@amwater.com>
Cc: Brent Miles <bmiles@northpointkc.com>, "Don Coleman
(donpcoleman@yahoo.com)" <donpcoleman@yahoo.com>,
"jeffg@completehomeconcepts.com" <jeffg@completehomeconcepts.com>,
"Richie Benninghoven (rcb@usckc.com)" <rcb@usckc.com>, Ron Super
<rsuper@kc.rr.com>, "Ben Drake (benrqbld@gmail.com)"
<benrqbld@gmail.com>, Blake Madden <bmadden@affinis.us>, Rick Worrel
<rworrel@affinis.us>, "mmcginness@mcginness-shaw.com"
<mmcginness@mcginness-shaw.com>
Mike,
In General, the excavation limits should be revised showing excavation
cut starting 1’-0” from edge of Intercon Drive at a 2H:1V slope on the
Riverward side of the levee. See the email and USACE response letter
allowing limited removal of pipe within the levee projected slopes.
Below are sheet specific comments.
Sheet 5
1. Typical Levee Section. The riverward side of the levee
excavation slope (perpendicular to the levee slope) should be revised to
2H:1V.
2. Typical Levee Section. Show excavation cut starting 1’-0” from
edge of Intercon Drive. This will essentially reduce the portion of pipe
removed to that perpendicular to the levee.
3. General Notes. Add a note stating that Contractor shall
maintain full access to Intercon Drive at all times during construction.
4. General Notes. Add a note requiring Riverside Quindaro Levee
District Inspector to verify grouting of pipe at removal limits.
5. General Notes. Add a note stating the pipe ends at the removal
limits shall be encased in a 1-ft thick impervious plug or bentonite
grout.
Sheet 6
1. Revise the excavation limits shown. See comments for sheet 5.
2. Add a note that the existing 8-in PVC pipeline disturbed by
excavations shall be replaced and existing drainage to Burlington Creek
shall be maintained.
The plans should be revised and re-submitted to the Levee District for
review to verify comments have been addressed . Re-submittal will not
require USACE review.
Feel free to contact me with any questions.
Also, the Levee District anticipates an emergency repair to the Q1
crossing in the near future. Q1 is the rolling gate directly south of
the waterline abandonment area. We will need to coordinate construction
schedules between these two projects. Do you have an estimated
construction start date?
Thanks,
Jason
Jason D. Davis, P.E., Vice President, Federal Services
Affinis Corp | BUILDING LONG-LASTING RELATIONSHIPS | www.affinis.us
<http://www.affinis.us/>
Named the Best Firm to Work for in Civil Engineering by CE News for 2013
<http://www.affinis.us/secNew/blog/Blog-027.htm>
7401 W. 129th Street, Suite 110 | Overland Park, KS 66213
cid:image001.jpg@01CE8D13.C9A7DE80
<http://www.facebook.com/home.php?#!/pages/Affinis-Corp/308999976861?ref
=search&sid=KRiXs-FtcoqULBN71qICiQ.19290190..1>
cid:image002.jpg@01CE8D13.C9A7DE80 <http://twitter.com/AffinisCorp>
cid:image005.jpg@01CE8D13.C9A7DE80
<http://www.linkedin.com/company/278228?trk=tyah>
Direct: 913-239-1106 | Mobile: 913-634-6278 | Fax: 913-239-1111 |
Toll-free: 1-877-527-5468
This email and any files transmitted with it are confidential and are
solely intended for the individual or entity to whom they are addressed.
If you are not the intended recipient or the person responsible for
delivering the email to the recipient, be advised that you have received
this email in error and that any use, dissemination, forwarding,
printing, or copying of this email is strictly prohibited. If you have
received this email in error, please reply to sender
and take the steps necessary to delete this message completely from your
computer system.
Thank you.
From: Michael.McMillion@amwater.com
[mailto:Michael.McMillion@amwater.com]
Sent: Tuesday, July 30, 2013 2:18 PM
To: Jason Davis
Subject: Updated Plan Sheets for Water Main Removal in RQBLD Levee
Jason,
We had the RQBLD levee at Intercon Dr. surveyed to help determine the
limits of excavation for the removal of the abandoned 12" water main
crossing the levee structure.
I updated the plan sheets that were previously reviewed & approved by
you & added plan sheet 6 to include the recent survey. These plan
sheets are attached below. Please review these & let me know if these
plans will be acceptable for use in removing the main in the levee. I
have been preparing a bid packet which will describe the logistics for
the proposed excavation. I will follow up with this document in a
future email.
I tried to keep the previously reviewed plan sheets as close to the same
as the last reviewed plans as possible. I left the specification text
the same but I did change a few things based on the info from the
survey.
Some notes on what had been changed on the previously reviewed plan
sheets:
- Removed the scale on plan sheets 3 & 4
- Updated the location of the levee toe on plan sheets 3 & 4 based on
the survey information on plan sheet 6
- Updated the appx. excavation limits on plan sheets 3 & 4 based on the
survey information on plan sheet 6
Notes for the levee survey, plan sheet 6:
- Previous water main depth investigations found the main appx. 6' deep
to top of pipe. In some locaitons it was found to be shallower but 6'
deep was near the average depth.
- I am expecting the exvation to be appx. 8' deep. With the excavation
slopes being 1V:1.5H I expect the width to be 12' on either side of the
main
- The location of the 10" area drain was surveyed. The drain pipe runs
parallel with Intercon Dr. I took a look at this drain, it looks to be
PVC, appx. 8" in diameter, appx. 1' deep. I am not certain of the
extent of the drain pipe but I assume it runs from the railroad to
Burlington Creek. I was not able to find either end of the pipe.
- Please let me know if you would like any language added to the plan
sheet for the replacement of this drain.
Sincerely,
Mike McMillion, PE
Project Engineer
Missouri American Water
mcmillion@amwater.com <mailto:mcmillion@amwater.com>
314-996-2335
________________________________
Scanned by MailMarshal - Marshal's comprehensive email content security
solution. Download a free evaluation of MailMarshal at www.marshal.com
<http://www.marshal.com>
________________________________