HomeMy WebLinkAbout1479 Seeding Plans & Specifications Phase 1 Infrastructure Improvements Horizons East BILL NO. 2016-038 ORDINANCE NO. AW AN ORDINANCE APPROVING SEEDING PLANS AND SPECIFICATIONS FOR THE PHASE I INFRASTRUCTURE IMPROVEMENTS WITHIN THE HORIZONS EAST SITE WHEREAS, Briarcliff Realty, LLC, a Missouri limited liability company, and the City of Riverside, Missouri (the "City") entered into that certain Master Development Agreement dated as of May 10, 2011 (the "MDA") which provides for, among other items, the construction of Infrastructure Improvements on the Briarcliff Horizons Site (as such terms are defined in the MDA); and WHEREAS, Briarcliff Realty, LLC assigned its rights and obligations under the MDA, but not its rights and obligations under the MDA First Amendment, to Briarcliff Horizons, LLC, an affiliated entity of Briarcliff Realty, LLC, pursuant to Section 12.5(b) of the MDA; and WHEREAS, on or about February 13, 2012, Briarcliff Horizons, LLC filed articles of amendment with the Missouri Secretary of State changing its name to Riverside Horizons, LLC; and WHEREAS, on or around August 2012, Riverside Horizons, LLC, assigned all of its duties and obligations under the MDA to construct and complete the public infrastructure and other public improvements as set forth in the MDA, to Northpoint Development, LLC ("Developer"), pursuant to Section 12.5(b) of the MDA; and WHEREAS, MDA Section 5.2 requires the Developer to provide the City with Construction Plans for the Infrastructure Improvements for each Infrastructure Phase and provides that such Construction Plans are subject to approval by the City and appropriate Governmental Authorities; and WHEREAS, the City wishes to approve the detailed seeding plans and specifications for the Phase I Infrastructure Improvements attached hereto as Exhibit A and incorporated herein (the "Seeding Plans and Specifications"); and WHEREAS, the Board of Aldermen find it to be in the best interests of the City in order to further the objectives of industrial and economic development of the City, and the terms and conditions of the MDA, as well as in furtherance of the objective to protect the health, safety, and welfare of the businesses and citizens of the City, to approve the Seeding Plans and Specifications. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE, MISSOURI, AS FOLLOWS: Section 1. SEEDING PLANS AND SPECIFICATIONS APPROVED. In order to further the objectives of industrial and economic development of the City, and the terms and conditions of the MDA, as well as in furtherance of the objective to protect the health, safety, and welfare of the businesses and citizens of the City, the Seeding Plans and Specifications attached hereto as Exhibit A and incorporated herein are hereby approved. Section 2. AUTHORITY GRANTED. The Mayor, the City Administrator, Special Counsel to the City and other appropriate City officials are hereby authorized to take any and all actions as may be deemed necessary or convenient to carry out and comply with the intent of WA 8613771.1 this Ordinance and to execute and deliver for and on behalf of the City all certificates, instruments, agreements and other documents, as may be necessary or convenient to perform all matters herein authorized. Section 3. EFFECTIVE DATE. This Ordinance shall be in full force and effect from and after its passage and approval. BE IT REMEMBERED that the above was read two times by heading only, PASSED AND APPROVED by a majority of the Board of Aldermen and APPROVED by the Mayor of the City of Riverside, Missouri, this 6th day of September, 2016. Ka ileen L. Rose, Mayor ATTEST: R'obfn Kincaid„ ify Perk P Approved as to form: Sperylk Pkne LLP Spial C sel to the City by Joe ednar 2 WA 8613771.1 EXHIBIT A SEEDING PLANS AND SPECIFICATIONS 3 WA 8613771.1 I ` HORIZONS EAST SEEDING PLAN SHEET BASE BIDSOUAREPEET A ERIN EI,SOUARE EET --- N I \ I.IN 26056 LEGEND \ 29.637 $3.867 �PROPERTY UNE Z H \ ` 659W 24010 WM Q I 21 900 25675 ALL UTNTIES SHOWN ARE FOR REFERENCE ONLY. \ \i Mao 59 2 61 MFOIWON S NE RDHGMG CE ST CTION DOCUMENTS FOR WERE 145 ,�AI� V I M287 UNDERfRW POWER CONWIT V I 0 _! OvERNEAD POKER ToW aT 9155F -- -- CABLE TELE`nSWYI UNE a 'A O T AT TOMI 244 953 5F — 1 NiDNE UNE NATUR&GAS PIPE O !�} – --- _ - BR / WATER MAINqt/fq SANITARY SEWER STORM SEWER ]G. 61 \ KEYNOTE LEGEND .,^ – - \ nd STRE \ \ \ \ NTHESE PLANS CAUER MATERIALS WLY. REF.HORIZONS PERWITTC°DOCIINENTS FOR RETAINING WALL INSTAJ.ATCN INFORMATION O. \ \ � .. z C RREETTAINRAININC W�C E RE=MG WALL E W` idYp/�0yi F RETAINING WALL F Ig pE G RETAINING WALL G I / A i LpwOURMaFl9 STACKING STONE SPECIFICATION PEW®,IPM STALT(RG STOVE SHOJLD CIXi95T OF A HARD STONES (ILL UIESTCNE. ,E OUARITE.BASALT AND GRANITE) STONE MUST BE FREE OF ORGANIC MA T SEAMS AND BE UNIFORM IN APPEARANCE TTA SRACRR SM%LD H AW THE MMICR SUBMITTALS FOR TO STOCK MUNGG MATERIAL AT APPROVALCF THE STONEE JOBSITE. E FCLLOMNG ARE E OUALTY TESTS REOUIREMENiS FORE STACKING EAL 4 \ ASTM C-97 ABSO TIT 6%MAX ASTM 0-5312 WRA9UTY_ ICS MAX LOSS(20 CY(1FS) I 1 ' J , i• V A / MN.CpIRtES9AE STRENGTH—! (11'a Go PS / AVG HEIGHT t4' SNDWN IN PLANS) TO F I / V /i//� r \`= •� - / L?IGTH c TO s'(6'.HORN IM FLAILS) • O ST I •i �/� S'/ / i I _ B - t `�` / i^ l / \ „ l �f�%/ 1, / r / STACKING STONE WALL AREAS y w 65 AREAS SHCMO'N BELOW ARE THE FACE OF WALL AND ASSUME A 6'-0.914' 1�p l FACE FM EAd STdON E CONTRACTORS AID PP SULERS ARE RESPoNSIBLE FOR //- \ / / /� p fl l // / DETERMINING THEIR OWN TIO INFORMAN FOR BIOOMO PURPOSES / t ILII MNL A _ 7.005 IF. WNL B— 1..468 IF F. n ICL - — — - - _ WNL C _ 532 IF. �u { ,� _ �5 / / 2 W E 10. SE d �� WNL E 10.225 U.0 I wql - /y.. \ ;s/� �.\ %/ i// I ) 'AAL G_8:6715s o I N SAS X w 2t 900 IF `\ // /e t / / WALL H(MR(MR) - 259 S.F.60 FT(L). 3.5 FT(N)J 4 q i ,' i / /// WALL I(WEIR) - 131 V.(W FT(L)i l5 FT(H)) K 1 O � ,i_ _l� /' MNL J(WEIR) — 151 S.F. ((8 FT(L). 3.5 FT(H)F29 FT(L).15 FI(H)) t0 '} _ : / p ` I / ( WALL N(WEIR) -- 291 IF. (8.3 FT(L) i 5.5 R(X)) N a 'ou 1/ pp J / d 2 0 ON NK nib y _ x O m9 E 1 _ �z =x u / LU _ 28726 "-i `� / / 1 W Q 25 ° / A e 40' back from fop of Well 0'x 3640'= 4 .< TC7q�pCL&TREET- w 9 o J It v� 0'back from top of wall �I I N ,�W gn _ 40'x1,270'=50,800sf D' l6D' zae' wo' scNc w FEET SHEET Y< - RW2.11 KANSAS CITY METROPOLITAN CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION CONSTRUCTION AND MATERIAL SPECIFICATIONS Section 2400 Seeding and Sodding VIII , DIVISION H CONSTRUCTION AND MATERIAL SPECIFICATIONS SEWERS SECTION 2400 SEEDING AND SODDING APPROVED AND ADOPTED THIS 21st DAY OF OCTOBER 1981 KANSAS CITY METROPOLITAN CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION TABLE OF CONTENTS SECTION2401 SEEDING........................................................................................................................................1 2401.1 Scope.......................................................................................................................................................1 2401.2 Materials, Definitions and Equipment:................................................................................................ .....1 2401.3 Construction Details.................................................................................................................................1 2401.4 Protection and Repair...............................................................................................................................3 SECTION 2402 SODDING........................................................................................................................................3 2402.1 Scope.......................................................................................................................................................3 2402.2 Materials and Definitions:.........................................................................................................................3 2402.3 Construction Details........................................................'.......................................................................4 SECTION 2403 MEASUREMENTS AND PAYMENTS............................................................................................4 2403.1 Scope.......................................................................................................................................................4 2403.2 General....................................................................................................................................................4 2403.3 Items not listed in the Proposal................................................................................................................4 2403.4 Methods of Measurement.........................................................................................................................5 2403.5 Basis of Payment.....................................................................................................................................5 !i American Public Works Association Kansas City Metropolitan Chapter i October,1981 'i SECTION 2401 SEEDING 2401.1 Scope This section governs the furnishing of all labor,equipment,tools, materials,and the performance of all work for seeding. 2401.2 Materials,Definitions and Equipment: A. Seeds: Seeds for cover crops shall comply with the requirements of the applicable state seed laws and shall be the mixture of seeds specified in the Special Provisions. Seeds shall be free of prohibited weed seeds and shall not have more than 1 percent of noxious weed seeds.Seeds shall be delivered to the site in convenient containers,each fully labeled, bearing the name,trade name,or trade mark,and a warranty of the producer and a certificate of the percentage of the purity and germination of each kind o- seed specified. B. Pure Live Seed: The following formula shall be used to determine the amount of commercial seed required to provide each kind of seed for the specified quantities of pure live seeds: Pounds of Commercial 10,000 x Pure Live Seed(lbs per acre) Seed Required= Purity(Percent)x Germination(percent) C. Fertilizer:Fertilizer shall be inorganic 12-12-12 or 13-13-13 grade,uniform in composition free flowing and suitable for application with approved equipment,delivered to the site in convenient containers,each fully labeled,conforming to the applicable state fertilizer laws, bearing the name,trade mark,or trade name,and a warranty of the producer. D. Mulch: Mulch shall be the vegetative type,wood cellulose fiber type,asphaltic emulsion type,or asphalt emulsion over mulch,whichever is specified in the Special Provisions,or as approved by the Engineer. 1. Vegetative Type:The vegetative type shall be the cereal straw from stalks of oats,rye,wheat or barley and shall be free of prohibited and noxious weed seeds. 2. Asphalt Emulsion Type:The asphalt shall be SS-Ih conforming to the requirements of ASTM D-977,or cut-back grade MC-2 conforming to ASTM D-598,whichever is specified in the Special Provisions. 3. Asphalt Emulsion over Mulch:The asphalt shall conform to the requirements of Section 24012D2 above and applied over vegetative mulch conforming to the requirements of Section 2401.2 D1 above. 4. Wood Cellulose Fiber Mulch:Wood cellulose fiber shall contain no germination or growth inhibiting ingredients,and shall be dyed an appropriate color to aid in visual metering in its application. It shall be easily and evenly dispersed and suspended when agitated in water,and when sprayed uniformly on the soil surface,shall form a blotter-like cover,which readily absorbs the water and allows infiltration to the underlying soil.The mulch material shall be supplied in packages of not more than 100 pounds(45.36 kg)gross weight,and shall be marked by the manufacturer to show the air dry weight content.(Air dry weight shall contain no more than 10 per cent moisture). E. Equipment:The seeding operation shall.be accomplished with equipment suitable for preparing the seed bed,sowing the seed,fertilizing,spreading the vegetative type mulch,spreading the emulsion type mulch, or spreading the wood cellulose fiber mulch in accordance with the applicable requirements of the following sub-section entitled"Construction Details:" 2401.3 Construction Details All equipment used in the project and all workmanship shall meet the approval of the Engineer. A. Application of Fertilizer: Before tilling the soil the fertilizer shall be distributed uniformly at the rate of 600 pounds per acre(672.5 kg per hectare),and incorporated into the soil to a depth of at least 2 inches(5.08 American Public Works Association Kansas City Metropolitan Chapter 1 October,1981 cm)by discing or harrowing methods.Fertilizing rate is equivalent to 7 pounds per 500 square feet(6.72 kg per square hectometer). B. Tilling the Seed Bed:Areas shown on the plans or specified to be seeded shall be cleared and graded as required preparatory to tilling the surface for seeding.The surface shall be tilled to a depth of at least 2 inches(5.08 cm)by discing or other approved methods until the soil is suitable for seeding.Areas tilled shall be maintained until seeding and mulching is complete to insure a smooth area with no gullies or depressions. C. Planting Seeds:The kinds of seeds and the rate of sowing pure live seed shall be as specked on the Plans or in the Special Provisions,but shall be one of the following mixtures: 1. Type"A"Seed:This seeding mixture will normally be used where seeding is required in areas of established yards,shoulders and slopes in street right of way,and any other areas where a high-type seeding is deemed necessary.The seed mixture will be as follows: Type"A"Seed Rate of Pure Live Minim Pure Seed(lbs Kind of Seed Live Seed(%) /acre) Alta Fescue or Kentucky 31 Fescue(Festuca 75 25 Elatior) Var.Arundinces Rye Grass 80 25 (Lolium Perenne or L.Multi-florum) Kentucky Blue Grass 75 20 (Pac.Pratensis) Creeping Red Fescue 85 10 (Festuca Rubra) TOTAL 80 Type"B"Seed:This seeding mixture will normally be used to seed areas off street rights-of-way that are not maintained. Type"B"Seed Rate of Pure Live Minim Pure Seed(lbs Kind of Seed Live Seed(%) 1 acre) Alta Fescue or Kentucky 31 Fescue 75 90 (Festuca Elatior) Var.Arundinces Rye Grass 80 50 (Lolium Perenne or L.Multi-florum) TOTAL 140 American Public Works Association Kansas City Metropolitan Chapter 2 October,1981 All seeding work shall be done between the dates of February land April 15 for spring planting or August 15 and October 15 for fall planting.Sowing shall be accomplished by use of an approved mechanical seeder or drill(hand spreader can be used in small areas),making sure that successive seed strips overlap to provide uniform coverage.Seed should be drilled to a depth of 1/2 inch(1.27 cm). D. Compaction: Immediately following the completion of seeding operations,the entire area shall be compacted by means of a roller weighing at least 60 but not more than 90 pounds per linear foot(89.29 to 133.93 kg per meter)of roller. E. Mulching:Mulching shall be done within 24 hours following the seeding operation except in the case of wood cellulose fiber type mulch. 1. Vegetative Type Mulch:After compacting the surface,mulch shall be uniformly spread at the rate of 11/2 tons per acre(3.36 metric ton per hectare)by means of a mechanical spreader or other approved means. As soon as the mulch is spread it shall be anchored to the soil a minimum depth of 3 inches(7.62 cm) by use of a heavy disc harrow,set nearly straight,or a similar approved tool. Discs of the anchoring tool shall be set approximately 9 inches(22.86 cm)apart. Anchoring shall be accomplished by not more than two passes of the tool. 2. Asphalt Emulsion Type:After compacting the surface,mulch shall be uniformly spread at the rate of 0.2 gallons per square yard(0.906 liters per square meter)by means of an approved sprayer.The temperature of the mulch at time of application shall be in the range of 125°to 175° F(51.60 to 79.4° C). 3. Asphalt over Mulch:After compacting the surface,vegetative type mulch shall be applied as specified in Section 2401.3 Cl above.This shall then be covered with asphalt emulsion as specified in Section 2401.1 C2 above. 4. Wood Cellulose Fiber Type:Wood cellulose fiber mulch shall be added to the hydraulic seeder after the proportionate amounts of seed,fertilizer and water,and other approved materials are added.These ingredients shall be mixed to form a slurry which shall be applied at the rate of 1,000 pounds per acre (1.12 metric tons per hectare).The mulch shall make a uniform coverage of the soil surface that will be satisfactory to the Engineer. 2401.4 Protection and Repair The seeded area shall be kept free of traffic until accepted. If at any time before acceptance of the completed contract,any portion of the seeded surface becomes gullied or otherwise damaged,or the seeding has been damaged or destroyed,the affected portion shall be repaired to re-establish the specified condition prior to the acceptance of the work. SECTION 2402 SODDING 2402.1 Scope This Section governs the furnishing of all labor,equipment,tools and materials, and the performance of all work for sodding. 2402.2 Materials and Definitions: A. Sod:The sod shall be densely rooted nursery grown Kentucky Blue Grass.The sod shall contain a growth of not more than 10 percent of other grasses and clovers,shall be free from all prohibited and noxious weeds,and shall be cut in strips of uniform thickness,the range of acceptable thickness shall be%to 1'/4 American Public Works Association Kansas City Metropolitan Chapter 3 October,1981 inch(1.91 to 3.18 cm);each strip containing at least one(1)square yard.Sod shall be cut in strips not less than 12 inches wide(30.5 cm). B. Fertilizer:Fertilizer shall be inorganic 12-12-12 or 13-13-13 grade,uniform in composition,free flowing and suitable for application with approved equipment,delivered to the site in convenient containers,each fully labeled,conforming to applicable state fertilizer laws,bearing the name,trade name,or trademark and warranty of the producer. 2402.3 Construction Details A. Fertilizing:Before tilling operations,fertilizer shall be spread uniformly at the rate of 300 pounds per acre (336.25 kg per hectare). Fertilizing rate is equivalent to 3.5 pounds per 500 square feet(3.36 kg per square hectometer). B. Tilling the Sod Bed:The sod bed shall have a uniform surface free from washes and depressions;and shall conform to the finished grade profile and cross-section shown on the plans.The soil,except where fresh top soil has just been applied and compacted,shall be thoroughly tilled to a depth of 2 inches(5.0 cm). Freshly graded areas,which have set long enough to become dry and crusted over,shall be tilled as specked above,preparatory to placing the sod. C. Placing Sod:Sod shall not be placed during a drought or during the period from June 1 to September 1, unless authorized by the Engineer,and shall not be placed on frozen ground. Sod shall be moist when it is placed.Sod strips shall be laid along contour lines,commencing at the lowest point of the area and working upward.The transverse joints of sod strips shall be staggered and the sod carefully placed to produce tight joints.The sod shall be firmed and watered immediately after it is placed. The"firming'shall be accomplished by application of a roller weighing not less than 60 nor more than 90 pounds per lineal foot(89.29 to 133.9 kg per meter)of roller. 1. Anchoring Sod: On 2:1 slopes,or steeper,the sod shall be anchored with%inch(1.27 cm)square by 8 inch(20.32 cm)long wooden pegs driven into the ground 3 pegs to the square yard(square meter)or other approved methods.Pegging shall be done immediately after sod is firmed.The area shall then be cleared of loose sod,excess or broken anchors,excessive soil,or other foreign materials. 2. Maintenance:The sodded area shall be thoroughly watered daily for a period of fifteen days after placing except when thoroughly wetted by rain.Any portion of the sod that is not in good growing condition following the first full growing season(spring to fall)shall be replaced with fresh live sod. SECTION 2403 MEASUREMENTS AND PAYMENTS 2403.1 Scope This section governs the method of measurement and basis of payment for furnishing all labor,equipment,tools and materials and for the performance of all related work necessary to complete any construction covered in Section 2400. 2403.2 General Unless specifically altered by the Contract Special Provisions,the methods of measurement and payment shall be as specked herein and as listed in the Proposal. 2403.3 Items not listed in the Proposal There shall be no measurement or separate payment for any item of work not specifically identified and listed in the Proposal and all costs pertaining thereto shall be included in the contract unit prices for other items in the Proposal. American Public Works Association Kansas City Metropolitan Chapter 4 October,1981 2403.4 Methods of Measurement The quantities of accepted work shall be measured or determined as follows: A. Seeding: 1. Street Construction: Seeding will be measured per acre(hectare)or hundredth part thereof. 2. Sanitary Sewer Construction:Seeding will be measured horizontally in linear feet(decimeter)along the centerline of sewer,regardless of the width of disturbed areas or type of seed used.Seeding will be measured only when centedine of sewer lies in grassed areas to be seeded as shown on the plans. When centerline of sewer lies in areas that are not grassed,such as street paving,driveways,parking areas,gardens,etc.,no measurement will be made.Areas that are disturbed which lie outside the Contractors normal trenching operation areas will not be measured for payment,but shall be restored to a condition equal to or better than that existing prior to construction. Each area measured will be measured either as seeding or sodding,but not as both.When sewer ends in grassed area, measurement will be made only to centerline of manhole. B. Sodding: 1. Street Construction:Sodding will be measured per square yard(square meter)or tenth part thereof. 2. Sanitary Sewer Construction:Sodding will be measured horizontally in linear feet(decimeter)along the centerline of sewer.Regardless of width of disturbed areas or type sod used. Sodding will be measured only when centerline of sewer lies in grassed areas to be seeded as shown on the plans. When centerline of sewer lies in areas that are not grassed(such as street paving,driveways,parking areas, gardens.etc.)no measurement will be made.Areas that are disturbed which lie outside the Contractors normal trenching operation areas will not be measured for payment,but shall be restored to a condition equal to or better than that existing prior to construction. Each area measured will be measured as either seeding or sodding, but not as both.When sewer ends in grassed area, measurement will be made only to centerline of manhole. 2403.5 Basis of Payment Payment for the accepted work will be made as follows: A. Seeding: 1. Street Construction: Payment for seeding will be made by one of the following: a. Contract unit bid price. b. Contract lump sum bid price. 2. Sanitary Sewer Construction:Payment will be made at the contract unit bid price. B. Sodding: 1. Street Construction: Payment for sodding will be made by one of the following: a. Contract unit bid price. b. Contract lump sum price. 2. Sanitary Sewer Construction:Payment will be made at the unit bid price. American Public Works Association Kansas City Metropolitan Chapter 5 October,1981