HomeMy WebLinkAbout2007-001 Amending 2008-2012 Capital Improvement Plan
AMENDED
Passed this ~N day of January 2007.
~/
May Kathleen L. Rose
Resolution No. 2007-O1
Resolution No. 2007-O1
RESOLUTION ADOPTING A CAPTTAL IMPROVEMENT PLAN FOR 2008-2012 FOR
THE CITY OF RIVERSIDE, MISSOURI FOR FUTURE PLANNING PURPOSE.
WHEREAS, The City of Riverside has studied and reviewed future public improvement projects for
the City; and
WHEREAS, the City has compiled these future projects into a Capital Improvement Plan for future
planning processes for 2008-2012; and
WHEREAS, the City Staff has presented the 2008-2012 Capital Improvement Plan and the Board of
Aldermen have reviewed, examined, and deemed appropriate the recommendations of the Plan.
follows:
NOW, THEREFORE, BE TT RESOLVED, by the Board of Aldermen of Riverside, Missouri, as
Section 1. That the Board of Aldermen hereby fmds and determines that the 2008-2012 Capital
Improvement Plan, attached hereto as Exhibit A, is an appropriate document for planning purposes and is
hereby adopted for planning purposes for the City.
Section 2. That this Resolution shall take effect immediately upon this adoption by the Board
of Aldermen of the City of Riverside, Missouri,
2008-2012 Capital Improvement Plan
City of Riverside
2008-2012 Capital Improvement Plan
Table of Contents
Board & Committee Membership ....................................................................................... 2
Goal & Objectives .............................................................................................................. 3
Financial Assumptions ........................................................................................................ 4
Revenue Assumptions ..................................................................................................... 4
Expenditure Assumptions ............................................................................................... 5
Projects Budgeted in Current Fiscal Year ........................................................................... 5
Summary of Projects ........................................................................................................... 6
Fund Balance Projection ................................................................:.................................... 7
5 Yeaz Outlook .................................................................................................................... 9
Streets and Bridges ............................................................................................................. 9
Infrastructure Maintenance ............................................................................................... 11
Community Development Projects ................................................................................... 12
Public Facilities ............................................................................:.................................... 14
Park Projects ..................................................................................................................... 16
Major Equipment .............................................................................................................. 17
Horizons ............................................................................................................................ 18
City of Riverside
Board & Committee Membership
Ray Beard, Alderman
Ward II
David Hurt, Alderman
Wazd III
Board of Aldermen
Kathleen Rose,-Mayor
Bernazd Bruns, Alderman
Ward II
Linda Jones, Alderman
Ward 1
Pamela Darata, Alderman
Ward III
Ron Super, Alderman
Ward 1
Jim Frakes
Jerry Hackenberg
Linda Jones, Alderman
Bazbara Snyder, Chairman
Ray Uhl
Mazk Salyer
Kathleen Rose, Mayor
Park Board
Ron Carlson
Julie Rule
Planning Commission
Harold Snoderley
Al Bowman
Eugene Lively
David Hurt, Alderman
Board of Zoning Adjustment
Marvin Pool Gale Perkins
Dean Lefstad Marvin Layton, alternate
Kathleen Rose, Chairman
June Flaws
Pride & Progress Board
Jean Grogan, Treasurer
Sara Thatcher
Kathleen Rose, Mayor
Aazon Locke
Evelyn Poe
Stephen King
Jerry Hackenberg
Gloria Hickman, Vice
Chairman
2
City of Riverside
2008-2012 Capital Improvement Plan
Capital Improvement Program Goal & Objectives
The goal of Riverside's Capital Improvements Program (CIP) is to forecast future public
improvements and facilities in the City and to provide data concerning need, cost, timing,
funding sources, budget impacts and alternatives. The goal is pursued with the following
objectives.
1. Utilize the objectives of the Master Plan when reviewing and updating the CIP
program.
2. Integrate the CIP budget into the Operating Budget in order to provide a
comprehensive financial plan for accomplishing the goals of Riverside.
3. Execute the C1P budgetary process in a manner that will provide the Governing Body
with an opportunity to respond to community needs.
4. Ensure that all decisions and actions will assist in maintaining a healthy fund balance.
5. Leverage City resources against available federal, state and county funds in such a
manner that the present and future citizens of Riverside will be provided with the
highest level of services and facilities without adverse financial impacts in the fixture.
3
City of Riverside
2008-2012 Capital Improvement Plan
Financial Assumptions Used in Capital Plan Development
Revenue Assumptions
1. Missouri Gaming Revenue is projected to increase by approximately 2.0% each
year. Gaming Commission is generated by a $1 admission tax and a 2% gross
receipts gaming tax from the Argosy Casino located in Riverside.
Missouri Gaming Revenue Receipts
2. Real Estate Income, which is based on gross receipts at the Argosy Casino, is ~
projected to remain level. With the opening of the Hotel at the Argosy, gross
receipts are anticipated to increase. However, the % collected will decrease after
the opening.
3. Sales and Use Tax receipts, which are generated from a 1% levy, are projected to
increase by 2% per year.
4. Revenues from Fees, Fines, Pernuts and Licenses are estimated to increase by 2% j
each year.
5. Investment Income is projected to remain stable. ~
4
City of Riverside
2008-2012 Capital Improvement Plan
Egpenditare Assumptions
1. Operating expenditures including capital outlay is forecasted to grow 2.5% per
yeaz.
2. Assumptions for future debt service are based on an anticipated AA insured credit
rating.
3. Capital Improvement Project estimates are based on the actual contract when
possible. Otherwise, estimates are based upon engineer's estimates, historical
data, and reasonable assessments.
Projects Budgeted in Current Fiscal Year
West Platte Bridge
Northwood Road Phase 1
Vivion Road East
Cliffview Road
Petronella Road
Merrimac West
Vivion Road East
I-635 Interchange
L-385 Construction
Infrastructure Maintenance
City Signage Phase 1
2006-07 Community Development
Community Center Study
City Hall Renovations
City Annex
EH Young Restrooms -Winterization
EH Young Restrooms -Perm. Sewer
Line Creek Trail
Renner Brenner Trail Connector
Subtotal
Horizons
Total
4,185,000
350,000
170,000
760,000
83,200
156,200
150,000
5,750,000
500,000
300,000
500,000
2,500,000
20,000
15,000
50,000
50,000
15,000
523,000
8,500
16,085,900
32,850,000
48,935,900
5
City of Riverside
2008-2012 Capital Improvement Plan
Summary of Projects Included in the 2008-2012 Capital Improvement Plan
Streets and Bridges
Infrastructure
Maintenance
Community
Development Projects
Public Facilities
Park Projects
Major Equipment
Subtotal
Horizons
Total
2007-08 2008-09 2009-10 2010-11 2011-12
2,165,000 4,680,000 3,000,000 3,000,000 -
450,000 450,000 450,000 450,000 450,000
1,100,000 1,100,000 1,100,000 1,100,000 1,100,000
1,905,000 3,500,000 3,000,000 - -
400,000 400,000 400,000 400,000 400,000
200,000 - - 1,980,000 -
6,220,000 10,130,000 7,950,000 6,930,000 1,950,000
3,000,000 7,500,000 - - -
9,220,000 17,630,000 7,950,000 6,930,000 1,950,000
5,000,000
4,500,000
4,000,000
3,500,000
3,000,000
2,500,000
2,000,000
1,500,000
1,000,000
500,000
0
Streets & In&~astructure Community Public Parks Equipment
Bridges Mamt. Develop. Facilities
^ 2007-08 ^ 2008-09 ^ 2009-10 ^ 2010-11 ^ 2011-12
6
City of Riverside
2008-2012 Capital Improvement. Plan
Fund Balance Projection
= While addressing infrastructure and capital improvements needs is a priority to the City,
the Board of Aldermen remains committed to maintaining a healthy fund balance.
During the 5 year plan, fund balance is projected at a level to fund 4 years of operating
expenditures ($24 million) or above.
35,000,000
30,000,000
25,000,000
20,000,000
15,000,000
10,000,000
5,000,000
2007 2008 2009 2010 2011 2012
7
City of Riverside
2008-2012 Capital Improvement Plan
5 Year Outlook
2006-07 2007-08 2008-09 2009-10 2010.11 2011-12
All Fands All Fuuds All Funds All Fuuda All Fonds All Fuuds
Reveuue
Permits & Licenses
Fees Fines & Forfeitures
Taxes
Investmentlncome
Miscellaneous
Subtotal
Assigned Iucome:
Road District
Park Hill Officer Reimbursement
OTF
Annex Lease
Real Estate Income
Missouri Gaming Commission
Tofsl Assigned Income
Total Revenue
Expeuditures
Elected Officials
Adminishation
Municipal Court
Public Safety
Communications
Fire
Public Works
City Annex
Parks
Community Center
Pool
Comm.Dev/Codes
Total Operating & Capital
Equipment Expenditures
66,000 66,660 67,327 68,000 68,680 69,367
191,700 193,617 195,553 197,509 199,484 201,479
1,780,000 1,797,800 1,815,778 1,833,936 1,852,275 1,870,798
1,730,000 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000
5,000 5,000 5,000 5,000 5,000 5,000
3,772,700 3,463,077 3,483,658 3,504,445 3,525,439 3,546,644
45,000 45,000
14,000 14,000
4,500 4,500
8,400 8,400
4;332,000 4,332,000
7.700.000 7.867.500
12,103,900 12,263,000
45,000 45,000 45,000 45,000
14,000 14,000 14,000 14,000
4,500 4,500 4,500 4,500
8,400 8,400 8,400 8,400
4,332,000 4,332,000 4,332,000 4,332,000
8,039,187 8,215,167 8,395,546 8,580,435
12,434,687 12,610,667 12,791,046 12,975,935
15,876,600 15,726,077 15,918,345 16,115,112 16,316,485 16,522,579
47,459 48,645 49,862 51,108 52,386 53,696
1,540,938 1,579,462 1,618,948 1,639,422 1,700,907 1,743,430
135,776 139,171 142,650 146,216 149,871 153,618
1,757,442 1,801,379 1,846,413 1,892,573 1,939,888 1,988,385
346,102 354,755 363,624 372,714 382,032 391,583
431,667 442,459 453,520 464,858 476,480 488,392
919,182 942,162 965,716 989,859 1,014,605 1,039,970
26,500 27,163 27,842 28,538 29,251 29,982
120,874 123,896 126,993 130,168 133,422 136,758
181,797 186,342 191,000 195,775 200,670 205,687
93,700 96,043 98,444 100,905 103,427 106,013
310,284 318,041 325,992 _334,141 342,495 351,057
5,911,722 6,059,515 6,211,003 6,366,278 6,525,435 6,688,570
Levee Debt Service Contribution 500,000 - - - - -
TIFBond Debt Service 800,000 375,000 257,000 125,000 - -
New Debt Service 341,000 1,571,000 2,556,000 2,556,000 2,555,000 2,557,000
Levee Assessment 500,000 500,000 500,000 500,000 445,000 343,000
Total Levee Fund 2,141,000 2,446,000 3,313,000 3,181,000 3,000,000 2,900,000
TotalEzpenditures 8,052,722 8,505,515 9,524,003 9,547,278 9,525,435 9,588,570
Current Revenues Available for
Capital Projects 7,823,878 7,220,562 6,394,342 6,567,834 6,791,051 6,934,009
Estimated Capital Project Expenditures 16,085,900 6,220,000 13,480,000 7,950,000 6,930,000 1,950,000
Change in Fund Balance (8,262,022) 1,000,562 (7,085,658) (1,382,166) (138,949) 4,984,009
Beginning Fund Balance 40,019,424 31,757,402 32,757,965 25,672,307 24,290,141 24,151,192
Ending Fuud Balance 31,757,402 32,757,965 25,672,307 24,290,141 24,151,192 29,135,200
8
City of Riverside
2008-2012 Capital Improvement Plan
Streets and Bridges
West Platte Bridge Project
Replacement of former West Platte Bridge which was taken out during Levee Design 2006-07 110,000
consflvction. Goal of project is to gain access i~o Levee protected areas and Cosst. 2006-07 4,060,000
serve as a second means of ingress/egress. Prof Fees 2006-07 15,000
Total 4,185,000
Vivion Road West
Design and reconstruct Vivion Road west of QuiKTrip to dead-end, including Design 2006-07 70,000
raising Vivion Road in elevation. Const. 2007-08 1,500,000
Prof Fees 2006-07 100,000
Total 1,670,000
Northwood Road Phase I
Curb, gutter and asphalt work to approximately 1,8001ineal feet of street from Design -
north of PHHS entrance to the north. This project will only occur if annexation Const. 2006-07 300,000
is approved. Design of project will paid for by Bartb/Pursell. Prof Fees 2006-07 50,000
Total 350,000
Northwood Road Phase II
From End of Phase I to 52nd Street (approximately 45001inear feet). Design 2007-08 365,000
Two lane section~with 3 lanes where feasible. Const. 2008-09 3,650,000
Prof Fees 2008-09 250,000
Total 4,265,000
Cliffview Road
Rebuild Cliffview Road from The Tax Center driveway to the cul-de-sac north Design 2006-07 13,000
of Alpine. Project will connect with improvements associated with the Contt. 2006-07 732,000
Vivion West project. Frof Fees 2006-07 15,000
Total 760,000
Petronella Road
Project intersects with South Street and is to provide surface to gravel City Desig- 2006-07 5,200
street, as well as drainage improvements necessary to the area. Contt. 2006-07 75,000
Prof Fees 2006-07 3,000
Total 83,200
Merrimac West
Project extends from Northwood to intersection of Strathbury. It includes Design 2006-07
street and storm sewer work. Contt. 2006-07
Prof Fees 2006-07
Total
Vivion Rosd East Study
A study of Vivion Road from bridge at Line Creek to eastern City limits. Costs Design
were broken down by linear foot within each jutisdiction (Riverside, Cosst.
Northmoor, Gladstone and Kansas City.) Riverside committed to pay for Prof Fees 2006-07
Northmoor's portion of study due to financial constraints. Total
1,200
150,000
5,000
156,200
150,000
150,000
9
City of Riverside
2008 2012 Capital Improvement Plan
Streets and Bridges
Vivion Road East
A study of Vivion Road from bridge at Line Creek to eastern City limits. Costs
were bmken down by linear foot within each jurisdiction (Riverside,
Northmoor, Gladstone and Kansas City.) Riverside committed to pay for
Northmooi's portion of study due to fmancial constraints.
L-385 Construction
Scour Hole Repair
I-635 Interchange
Construction of on & off ramps at I-635 and Horizons Parkway
Project is being administered by MODOT. City had previously committed
$6,500,000 to project. This amount represents the city's rema Wing share.
Total For SYree[c & Bridges
10
Design. 2007-08 . 300,000
Desigo 2008-09 300,000
Coast. 2009-10 3,000,000
Consk 2010-11 3,000,000
Pmf Fees 2008-09 480,000
Total 7,080,000
Design 2006-07 50,000
Coast. 2006-07 450,000
Prof Fees -
Total 500,000
Design -
Const. 2006-07 5,600,000
Prof Fees 2006-07 150,000
Total 5,750,000
24,949,400
Current Year Budget 12,104„400
2008-2012 CIP 12,845,000
City of Riverside
2008-2012 Capital Improvement Plan
Infrastructure Maintenance
2006-07 Annual Infrastructure Maintenance Program
The project includes mill and overlay projects at Indian Lane, Lakota Court, Design -
Apache Drive, Apache Court and Pawnee. In addition, curb, gutter, sidewalk and Const. 2006-07 300,000
ADA accessible ramp needs will be addressed. Prof Fees
Total 300,000
2007-08 Annual Infrastructure Maintenance Program
This annual program includes mill and overlay projects, curb, gutter, sidewalk, Design -
ADA accessible ramp improvements, sanitary sewer, and storm sewer Const. 2007-08 450,000
improvements. Prof Fees
Locations for program will be determined during 2007-08 operating budget. Total 450,000
2008-09 Annual Infrastructure Maintenance Program
This annual program includes mill and overlay projects, curb, gutter, sidewalk, Design -
ADA accessible ramp improvements, sanitary sewer, and stone sewer Const. 2008-09 450,000
improvements. Prof Fees
Locations for program will be determined during 2007-08 operating budget. Total 450,000
2009-10 Annual Infrastructure Maintenance Program
This annual program includes mill and overlay projects, curb, gutter, sidewalk, Design -
ADA accessible ramp improvements, sanitary sewer, and storm sewer Const. 2009-10 450,000
improvements. Prof Fees
Locations for program will be determined during 2007-08 operating budget. Total 450,000
2010-11 Annual Infrastructure Maintenance Program
This annual program includes mill and overlay projects, curb, gutter, sidewalk, Design -
ADA accessible ramp improvements, sanitary sewer, and storm sewer Const. 2010-11 450,000
unprovements. Prof Fees
Locations for program will be determined during 2007-08 operating budget. Total 450,000
2011-12 Annual Infrastructure Maintenance Program
This annual program includes mill and overlay projects, curb, gutter, sidewalk, Design -
ADA accessible ramp improvements, sanitary sewer, and storm sewer Const. 2011-12 450,000
improvements. Prof Fees -
Locations for program will be determined during 2007-08 operating budget. Total 450,000
2,550,000
Total For Infrastructure Maintenance Program ~e'~
Current Year Budget 300,000
2008-2012 CIP 2,250,000
11
City of Riverside
2008-2012 Capital l'mprovement Plan
Community Development Projects
2006-07 Annual Streetscape/Landscape Program
Coninuation of landscaping along City streets with both trees and plantings. Design -
Funding of $25,000 was transfen~ed to City Signage Phase 1 Project Coast. -
Prof Fees -
Total -
2007-OS Annual Streetscape/Landscape Program
Continuation of landscaping along City streets with both trees and plantings. Design -
Const. 2007-08 100,000
Prof Fees -
Total 100,000
2008-09 Annual Streetscape/Landscape Program
Continuation of landscaping along City streets with both trees and plantings. Design -
Consk 2008-09 100,000
Prof Fees
Total 100,000
2009-10 Annual Streetscape/Landscape Program
Continuation of landscaping along City streets with both trees and plantings. Design -
Const. 2009-10 100,000
Prof Fees -
Total 100,000
2010-11 Annual Streetscape/Landscape Program
Continuation of landscaping along City streets with both trees and plantings. Design -
Const. 2010-11 100,000
Prof Fees -
Total 100,000
2011-12 Annual Streetscape/i,endscape Program
Continuation of landscaping along City streets with both trees and plantings. Design -
Coast. 2011-12 100,000
Prof Fees -
Total 100,000
City Signsge Plisse 1
City Signage and landscaping at the following locations: Design 2006-07 25,000
West Platte Road from Highway 9 Coast. 2006-07 475,000
Entrance to Indian Hills Prof Fees -
Vivion Road from Northmoor at the Library Total 500,000
City Hall Directional Signage
ltiverway Blvd and West Platte
Gateway and Vivion
2006-07 Community Development
Projects will be approved by Board of Aldermen to accomplish goals identified Design -
inthe Master Plan. Coast. 2006-07 2,500,000
Prof Fees -
Total 2,500,000
12
City of Riverside
2008-2012 Capital Improvemeht Plan
Community Development Projects
2007-08 Community Development
Project will be approved by Board of Aldermen to accomplish goals identified Design -
inthe Master Plan. Coast. 2007-08 1,000,000
Prof Fees -
Total 1,000,000
2008-09 Community Development
Projects will be approved by Board of Aldermen to accomplish goals idenrtified Design -
inthe Master Plan. Coast. 2008-09 1,000,000
Prof Fees -
Total 1,000,000
2009-10 Community Development
Projects will be approved by Board of Aldermen to accomplish goals identified Design -
in the Master Plan. Coast. 2009-10 1,000,000
Prof Fees -
Total 1,000,000
2010.11 Community Development
Projects will be approved by Board of Aldermen to accomplish goals identified Design -
in the Master Plan. Coast. 2010-11 1,000,000
Prof Fees -
Total 1,000,000
2011-12 Community Development
Project will be approved by Board of Aldermen to accomplish goals identified Design -
inthe Master Plan. Coast. 2011-12 1,000,000
Prof Fees -
Total 1,000,000
Total For Community Development' 8,500,000
Current Year Budget 3,000,000
2008-2012 CIP 5,500,000
13
.., ~
City of Riverside
200&2012 Capital Improvement Plan
Public Facilities
Community Center Utilization Study
A study to identify additions to the Community Center and their associated costs. Design
This process is also analyzing the usage of the City Annex and the Old Public Safet Const. 2006-07
g~~& ROW
Prof Fees
Total
Animal Shelter
Project identified in the 2006-07 Operating Budget. Would alleviate need to drive Design
stray animals down to Wayside Waifs. Const. 2006-07
Const. 2007-08
Pmf Fees
Total
City Annez Maintenance
Address maintenance issues at the City Annex. Design
Coast. 2006-07
Prof Fees
Total
Clty Hall Renovations
Renovations to create additional office space. Design
Coast. 2006-07
Prof Fees
Total
Community Center Construction
Implementation of potential recommendations from the Board of Alderman/Park Bt Design
subcommittee that is analyzing usage of the Community Center, City Annex and Coast. 2007-08
Old Public Safety buildings. Consk 2008-09
Prof Fees
Total
Old Public Safety Demolition
Implementation of potential recommendations from the Board of Aldem~an/Park Bc Design
subcommittee that is analyzing usage of the Community Center, City Annex and Coast. 2007-08
Old Public Safety buildings. Prof Fees
Total
Fire Protection Study -Horizons
This study would analyze fire protection services in light of planned
development in Horizons. Provide pms and cons of City fire protection
versus contracted fire protection.
Design
Coast.
Prof Fees
Total
2007-08
Levee Projects
Provides funding for special projects related to the 1,-385 Levee.
Design
Coast.
Prof Fees
Total
2007-08
20,000
20,000
150,000
150,000
50,000
50,000
15,000
15,000
1,000,000
1,000,000
2,000,000
25,000
25,000
25,000
25,000
500,000
500,000
14
City of Riverside
2008-2012 Capital Improvement Plan
Public Facilities
Fire Bay Heating System
Provides funding to replace fire bay heating system with a more efficient system. Design -
Const. 2007-08 125,000
Prof Fees -
Total 125,000
Replace Fire Bay Doors
Provides funding to replace fire bay doors.
Desigo
Const. 2007-08
Prof Fees
Total
80,000
80,000
City Annea Construction/Remodeling
Implementation of potential recommendations from the Board of Alderman/Park Bc Design
subcommittee that is analyzing usage of the Community Center, City Annex and Consk 2008-09
Old Public Safely buildings. Prof Fees
Total
Fire Station -Horizons
Funding would be used to either construct a fire station in Design
Horizons or to outsource the service. Const. 2009-10
Prof Fees
Total
Total For Public Fadlltles
Cun~ent Year Budget
2008-2012 CIP
2,500,000
2,500,000
3,000,000
3,000,000
8,4®
85,000
8,405,000
15
City of Riverside
2008 2012 Capital Improvement' Plan
Park Projects
E.H. Young Restrooms
Winterization offacilities - $50,000
Permanent sewer connection - $15,000
Design
Coast. 2006-07
Prof Fees
Total
65,000
65,000
Renner Brenner 1Yai1 Connector
Connection from Renner Brenner parking lotto Line Creek Trail.
Line Creek Tral! Connector
Design -
Consk 2006-07 8,500
Prof Fees -
Total 8,500
Trail connection E.H. Young Riverfront Park to Renner Brenner Park, which is Design 2006-07 13;000
approximately 1 mile in length. Coast. 2006-07 500,000
Prof Fees 2006-07 10,000
Total 523,000
2007-08 ParklTrail Improvement Annual Program
Specific projects will be identified during the 2007-08 Design -
operating budget. Coast. 2007-08 400,000
Prof Fees -
Total 400,000
2008-09 ParkfTrail Improvement Annual Program
Specific projects will be identified during the 2008-09 Design -
operating budget. Coast. 2008-09 400,000
Prof Fees -
Total 400,000
2009-10 ParldTrail Improvement Annual Program
Specific projects will be identified during the 2009-10 Design -
operating budget. Coast. 2009-10 400,000
Prof Fees -
Total 400,000
2010.11 Park/Trail Improvement Annual Program
Specific projects will be identified during the 2010-11 Design -
operating budget. Coast. 2010-11 400,000
Prof Fees -
Total 400,000
2011-12 Park/Trail ][mprovement Annual Program
Specific projects will be identified during the 2011-12 Design -
operating budget. Coast. 2011-12 400,000
Prof Fees -
Total 400,000
Totol For Park Projects 2 5
Current Year Budget 596,500
16 2008-2012 C1P 2,000,000
b ~ . ~
City of Riverside
2008-2012 Capital Improvement Plan
Major Equipment
City Park Technology & City-wide WiFY _
Provide Cameras in the Parks as well as City-wide WIFI for Police Activities ~~ 2007-08 200,000
Prof Fees -
Total 200,000
Aerial Fire Trnck -Horizons _
Funding would be used to purchase an Aerial Fire Truck for a station in Design
Horizons or to outsowroe the service. Const. 2010-11 1,200,000
Prof Fees -
Total 1,200,000
Pumper Fire Truck -Horizons _
Funding would be used to purchase a Pump' Fire Truck for a station in Design
Horizons or to outsource the service. Const. 2010-11 780,000
Prof Fees -
Total 780,000
2;180,000
Total For Major Equipment °~
Current Year Budget -
2008-2012 C1P 2,180,000
17
City of Riverside
2008-2012 Capital-Improvement Plan
Horizons
Horizons Parkway
Four lane north-south access street from the I-635 Interchange to 9 Highway. Design 2006-07 500,000
The project includes a bridge over the railroad tracks, stormwater, utility Coast. 2006-07 20,000,000
improvements ,relocations and property acquisition. Prof Fees 2006-07 500,000
Total 21,000,000
9 Highway Improvements
Project includes intersection improvements at 9 Highway and Northwood, new Design 2008-09 500,000
intersection at 9 Highway and Horizons Parkway, acceleration, deceleration, Coast. 2008-09 6,500,000
and tum lanes.. MODOT will wntribute $3,000,000 for these improvements. Prof Fees 2008-09 500,000
Total 7,500,000
East/R'est Connecflons
Project includes construction of east-west connector roads with utility Design 2007-08 500,000
improvements/relocations and property acquisition. Coast. 2007-08 2,000,000
Prof Fees 2007-08 500,000
Total 3,000,000
Sanitary Forcemain & Lift Station
Lift Station to be located at comer of Schoenbeck and I-635 to service Design 2006-07 100,000
Horizons Project; forcemain connection from new Lift Station to connect Coast. 2006-07 3,190,000
into KCMG at Line Creek Both projects being designed by Continental Prof Fees 2006-07 10,000
Engineers. Total 3,300,000
Water Connection
Connection of water facilities into MAWC system to provide water for Design 2006-07 50,000
Horizons Project Coast. 2006-07 140,000
Prof Fees 2006-07 10,000
Total 200,000
Wetlands
Corps of Engineers requirement for wetland delineation and mitigation of Design 2006-07 50,000
area inside the L-385 Levee System. Necessary before development can Coast. 2006-07 280,000
occur in the Horizions Project Prof Fees 2006-07 20,000
Total 350,000
Professional Fees/Contingency
Design 2006-07 -
Const. 2006-07 3,000,000
Prof Fees 2006-07 5,000,000
Total 8,000,000
2006-07 32,850,000
2007-08 3,000,000
2008-09 7,500,000
2009-10 -
2010-11 _
2011-12 -
Total jorSorizons Development ~ 3
18