HomeMy WebLinkAbout1594 Final Development Plan 4120 NW Mattox Road BILL NO. 2018-021 ORDINANCE NO. t594
AN ORDINANCE APPROVING A FINAL DEVELOPMENT PLAN FOR LAND
LOCATED AT 4120 NW MATTOX ROAD, RIVERSIDE, MISSOURI, IN
ACCORDANCE WITH THE UNIFIED DEVELOPMENT ORDINANCE OF THE CITY OF
RIVERSIDE
WHEREAS, Application No. PC18-03 was submitted to the City by North Point
Development for approval of a Final Development Plan for construction of an
approximately 213,000 square foot industrial facility ("Development Plan") located on an
approximately 14-acre tract of land at 4120 NW Mattox., Riverside, Missouri;
WHEREAS, the Planning Commission held a meeting on May 10, 2018 to consider said
application and recommended that the Development Plan be approved; and
WHEREAS, the Board of Aldermen find it to be in the best interests of the City in order
to further the objectives of industrial and economic development of the City, as well as
in furtherance of the objective to protect the health, safety, and welfare of the
businesses and citizens of the City, to approve the Development Plan as set forth
herein.
NOW THEREFORE, BE IT ORDAINED BY THE BOARD OF ALDERMEN OF THE
CITY OF RIVERSIDE, MISSOURI, AS FOLLOWS:
SECTION 1 — BEST INTEREST OF THE CITY TO APPROVE DEVELOPMENT PLAN.
It is in the best interests of the City in order to further the objectives of industrial and
economic development of the City, as well as in furtherance of the objective to protect
the health, safety, and welfare of the businesses and citizens of the City, to approve the
Development Plan, attached hereto as Exhibit A and incorporated herein, for
development of property located at 4055 NW Mattox Road, Riverside, Missouri, and
legally described as Lot 1 of Riverside Horizons West Third Plat, and such Development
Plan is hereby approved, subject to the conditions provided herein, to allow for the
construction of an industrial facility according to such plan.
SECTION 2 — CONDITIONS OF APPROVAL. The following conditions of approval
shall apply with regard to the Development Plan approved for development of the
property:
1.The approval of the Development Plan does not relieve the developer
from compliance with all other applicable local, state and federal laws,
codes, ordinances, and regulations. The developer is required to request
and obtain approval for all necessary permits to begin constructing the
development.
SECTION 3 — AUTHORITY GRANTED. The Mayor, the City Administrator, Special
Counsel to the City, and other appropriate City officials are hereby authorized to take
WA 6324022.1
any and all actions as may be deemed necessary or convenient to carry out and comply
with the intent of this ordinance to execute and deliver for and on behalf of the City all
certificates, instruments, agreements and other documents, as may be necessary or
convenient to perform all matters herein authorized.
SECTION 4 — EFFECTIVE DATE. This ordinance shall be in full force and effect from
and after the date of its passage and approval.
BE IT REMEMBERED that the above was read two times by heading only, PASSED
AND APPROVED by a majority of the Board of Aldermen and APPROVED by the
Mayor of the City of Riverside, Missouri, this 15th day of May, 2018.
Q�
Kathleen L. Rose, Mayor
ATT ST:,
ftQbin , iheaid, City Clerk
z WA 6324022.1
EXHIBIT A
FINAL DEVELOPMENT PLAN
HORIZONS INDUSTRIAL IX
,5 FINAL DEVELOPMENT PLAN
CITY OF RIVERSIDE,PLATTE COUNTY,MISSOURI
s
ti J,
, a
lk
i
d
3 WA 6324022.1
EXHIBIT B
LEGAL DESCRIPTION
Lot 1 Riverside Horizons West Third Plat
4 WA 6374022.1
CrrY OF City of Riverside
RIVE Staff Analysis Report
MISSOURI
r��, Case Number PC 18-03, Final Development Plan
upsv� 4120 NW Mattox—Horizons Industrial Spec IX
General Information
Applicant: NorthPoint Development, Horizons Industrial D{, LLC
Location: 4120 NW Mattox Road
Application: Final Development Plan
Zoning: PD-Planned Development
Existing Land Use: Undeveloped
Proposed Land Use: Light Industrial
Final Development Plan: Final Development Plan will be reviewed by the Planning
Commission and the Board of Aldermen for approval.
Site Area: 807,730 sq.ft. (13.95 acres)
Building Size: 213,016 sq. ft.
Building to Area Ratio: Approximately 26%
Analysis
Site Layout: The proposed site is undeveloped. The property is bound on the north by 43`d
Street,to the east by NW Mattox Road,the south by 41' Street and the west by NW Helena
Road. The property has four access points. Two access points are from NW 41$' Street and there
is one access from NW Helena and NW Mattox Road.
The building will run east-west with the main entrances being located on the south side of the
building on NW 41'Street. Standard car parking is provided to south and truck parking will be
double stacked on the north side of the property along 43`d Street.
Parking: The plan proposes 147 parking spaces designated for customers and employees on the
south side of the building. There are 92 truck/trailer parking spaces to the north of the building
double stacked.
Infrastructure:
Sanitary Sewer: Sanitary sewer is a located along the north side of the property.
Water: Water is available along the north side of 41'Street.
Gas: Gas is available along the north side of 41'Street.
Electric: Underground electric is located along the north side of 41'Street
Telecommunication: Telecommunication/fiber optics is available on the north side of NW 41�'
Street.
Page 1 of 2
Stormwater: Stormwater from this site will be conveyed by swales along the north, east and
south sides of property to the regional dentition basin located south of Riverside Logistics.
Building Design: The building will be constructed of insulated precast concrete wall panels.
The applicant will be applying for Leadership in Energy and Environmental Design (LEED)
Certification. The building matches the theme throughout Horizons East and will be carried to
this building on the west side of Horizons Parkway. The building will include elements of glass
similar to other industrial buildings in this park. These glass elements will be on the north,
south and west sides of the building to increase natural light into the office areas. The
warehouse portion of the building will also include glass for clear story windows to allow
natural daylighting in warehouse operations.
Outdoor Storage: Horizons Spec IX does not have any current outdoor storage needs. The
building is designed to be an industrial type use so the parking of truck trailers is anticipated.
The truck trailer parking will be on the east of the building facing the back of another industrial
building.
Landscaping: The approved PD regulations for all property east of Horizons Parkway address
landscaping for industrial sites. The four components of landscaping required includes:
building frontage at the street(right-of-way), common areas(not applicable to this site),parking
lots, and building foundation. The applicant has provided parking lot and foundation plantings
exceeding the adopted PD standards which require 1 tree per 40 feet and the applicant is
providing I tree per 30 feet of space. These plantings consist of trees located within the interior
yards and parking islands and shrubs at the building entrances
Signage: Site signage is regulated by the adopted PD regulations for the Riverside Horizons
Development. At this time the applicant has not submitted any sign plans.
Comprehensive Master Plan: Throughout the development of the Comprehensive Master Plan
it was articulated by participants that improving community image/character and the quality and
design of buildings was a key concern.Additionally, the Comprehensive Master Plan identifies
the site as part of the `Horizons Development',which is ultimately envisioned to include a mix
of innovation and industry, mixed use,destination office,destination retail and recreation.
Recommendation
Staff finds the application in conformance with the standards set forth in the UDO and the goals
established in the Comprehensive Master Plan and therefore recommends approval of the
application with the condition that additional landscaping is added to the south side of the
building for screening.
Attachments
• Final Development Plan: Site Plan
• Landscaping Plan
• Location Map
Page 2 of 2