Loading...
HomeMy WebLinkAboutR-2018-059 CO 2 Metro Asphalt 2017 Street Maintenance RESOLUTION NO. R-2018-059 A RESOLUTION APPROVING CHANGE ORDER 2 TO THE AGREEMENT WITH METRO ASPHALT, INC. FOR 2017 STREET MAINTENANCE PROJECT (316-016) RESULTING IN A REVISED CONTRACT AMOUNT OF $855,480.00 FOR SUCH PURPOSES WHEREAS, the City of Riverside ("City") issued an Invitation to Bid for the 2017 Street Maintenance Project which was awarded to Metro Asphalt, Inc. pursuant to Resolution R- 2017-011;and WHEREAS, the City approved Change Order 1 to the agreement with Metro Asphalt, Inc. pursuant to Resolution R-2017-073;and WHEREAS, the Board of Aldermen finds that it is in the best interest of the City to approve Change Order 2 to the agreement with Metro Asphalt, Inc., resulting in a total revised contract amount not to exceed $855,480.00 to continue the street maintenance program through the 2018-19 budget year. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE,MISSOURI,AS FOLLOWS: THAT Change Order 2 to the Agreement between the City and Metro Asphalt, Inc., a copy of which is attached hereto and incorporated herein, is approved and the Mayor is authorized to execute the same on behalf of the City. The resulting revised total contract amount shall not exceed $855,480.00. FURTHER THAT the Mayor, City Administrator and all other required city officials are authorized to take such other actions and/or execute and deliver for and on behalf of the City all certificates, instruments, agreements and other documents as may be deemed necessary or convenient to carry out and comply with the intent of this Resolution. PASSED AND ADOPTED by the Board of Aldermen of the City of Riverside, Missouri, the 3rd day of July 2018. - , � ,� Ka leen L. Rose, Mayor A47EST: t Robin, ineaid,.Cify Clerk A CITY OF RIVERS MISSOURI UPWWM from ordinory. 2950 NW Vivion Road Riverside, Missouri 64150 MEMO DATE: June 27, 2018 AGENDA DATE: July 3, 2018 TO: Mayor and Board of Aldermen FROM: Travis Hoover RE: Change Order 2: METRO ASPHALT, INC. 2017 Street Maintenance Project (316-016) BACKGROUND: The 2017 Street Maintenance Project was approved on 3-7-17. Change Order I was approved on 09-19-17 to continue work through the 2017-18 budget year. This request is to extend this agreement for the 2018-19 budget year through June 30, 2019 for an additional $300,000. Anticipated street maintenance items for this budget year consist of • Curb and gutter replacement • Sidewalk replacement • ADA ramp replacement • Approach replacement • Curb inlet adjustment BUDGETARY IMPACT: Approximately $300,000.00 will be expended out of the 2018-19 Infrastructure Maintenance budget. Original Contract Amount $455,480.00 Total of Previous Changes $100,000.00 Total this Change Order $300,000.00 Current Contract Total $855,480.00 RECOMMENDATION: Staff recommends approval of the resolution and acceptance of the change order with Metro Asphalt to continue with street maintenance work through the 2018-19 budget year. Cm OF CHANGE ORDER NO. 2 new Preputia 8212018 RIVERS Cofactor Name: Metro Asphalt Inc. Pra}reina: 2017 Street Maintenance Pew Nntrr. +a 1 Prater n.r.r: sa PtwAsamed o catraa ore 7212017 The following 01MVW atlas anginal mnbaa artroutnwere req+trad to cover cog roamed by the PnntaslR.aeseon: Rianids,Nrsoun Contleclor or to savings realized by the CaNectoru a Name of a NNge in the oct+rel ccns4ucW quara8a from she estimated quarrels;shown W the SW Propose. RaQU atUNaaa NPReaENTOONTRM.T Centras Corte or Contractor Maze Dsa"M &Awokn hr CbWW CAW(Paase daaaM Ran below andthen maaw,4m reason for Nowa Nowa Nowa Lim New,No. Praviaa Previous pre�ios Unit AdlusWd Ad MW Adjured Q�U Unit Price Aaw1M ChNas OmsO 1) tLq+naaid by Clip'2)Unmown Sea Condtlorr»Not Neorparaesd n plwapaas Qmpw Use Prior AmaaR 1 1897.5 $8.00 $15180.00 SF rConaele TrNIR 1897.50 8&00 815180.00 2 10852.0 55425 $370978.00 LF Curb and OWN 17005.00 $5425 42125 5 17237.8 $5.75 599,11&00 SF 4'Cor+aeN SWewakR 25005.00 85.75 8143,778.75 4 164.0 $14200 523 00 SF Tru+cNad Darwe 200.00 $142.00 528400.00 5 4 .0 $7.50 MAW= SF WConcrete R 9000.00 87.50 $87500.00 6 5.8 $2800.00 514950.00 EA Top ofCub Inlet 7.00 82,800.00 $18.200.00 W 80.00 5555480.00 Previous Total Admsled Total 8865.480.00 Not Change 5300.050.00 NmmN+eaeatraa Original Contact Amount 8455,460.00 - NNAmpmt of Previous Additions ant Deakfions $100,000.00 Net ContractAmourn Prior to This Request 8655,480.00 Amarnt Of This Request 8300,000.00 Naw CoWactAmounl 8855.480.00 Percent Change in Contact Amount 64.01% DESIGN ENGINEER CITY OF RIVERSIDE,MISSOURI: Ilt ZZ cmwm- NIA City Engeeaer. ryn,Paaea: Travis Hoover slaw: City AdminWbator. ore 8nen Kora) CONTRACTOR: ON-WE PROJECT MANAGER: CONTRACTOR•$0u99eMnn for Charas Ordr. ON-SITE PROJECT UAN*QEIR COW Ttruderelpsd CONTRACTOR ameas mar Waas m.was,w*haw Camas Daamera,fw abowatlaa,ew drvmetl abaa werawtwyn aNrlor ft CONTRACTOR m frdaaanpiya me Wee wdw,awawNpgaanwwowar+I ware* win wew4nnam.maserx eaa.ame<wmr+ne mew Owwmrm+Mbrafta prI mwmoRelmvnee1 orae rateemwere mneawmraapeamarvnh nbmatlm a rd o"as al,we Mera elNm+sas arenwnsmnamerm aritldpme wMwai Wild order. pmuad,Mi dr wneen eon a,nasct eaw.rwi,and yNM vaara eased elbow are comawm raapax m ms wsaaakpree uW Ne el+erae ismer. awaPao: Metro Asphalt, Inc. camnwm: N/A Nwre qyi¢ Nem,Pnre ma: 6/21 /201 4 oac