Loading...
HomeMy WebLinkAboutR-2018-078 CO1 Larrison Construction, Inc. RESOLUTION NO. R-2018-078 A RESOLUTION APPROVING CHANGE ORDER 1 TO THE AGREEMENT WITH LARRISON CONSTRUCTION, INC. FOR THE FITNESS COURT PROJECT (218-018) RESULTING IN A REVISED CONTRACT AMOUNT OF $55,590.75 FOR SUCH PURPOSES WHEREAS, the City of Riverside ("City") issued an Invitation to Bid for the Fitness Court Project which was awarded to Lamson Construction, Inc. pursuant to Resolution R-2018- 057; and WHEREAS, the Board of Aldermen finds that it is in the best interest of the City to approve Change Order 1 to the agreement with Larrison Construction, Inc., resulting in a total revised contract amount not to exceed $55,590.75 to include Alternate B, the shade structure, in the contract. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE, MISSOURI,AS FOLLOWS: THAT Change Order 1 to the Agreement between the City and Larrison Construction, Inc., a copy of which is attached hereto and incorporated herein, is approved and the Mayor is authorized to execute the same on behalf of the City. The resulting revised total contract amount shall not exceed$55,590.75. FURTHER THAT the Mayor, City Administrator and all other required city officials are authorized to take such other actions and/or execute and deliver for and on behalf of the City all certificates, instruments, agreements and other documents as may be deemed necessary or convenient to carry out and comply with the intent of this Resolution. PASSED AND ADOPTED by the Board of Aldermen of the City of Riverside, Missouri,the 17th day of July 2018. A athleen L. Rose, Mayor ATTEST:; ,... 0 U ' Robin:Kincaid,' ity Clerk a ' @ a CITY Of CHANGE ORDER NO. 1 DnaP.,'ed7/5/2018 RIVEPSIDE mo col Contractor Name: Lamson Construction, Inc. ProiedNama: Fitness Court Project Page Numller t W 1 Prdi.t Nu ntioi 218-01f A of Pgs Aft. asc 0 Contract Dm: 7/6/2018 The folbwing changes to the onglnal contract amount were required to cover cost Incurred by the Pripet Location: Riverside,Missouri Contractor or to reflect savings realized try the Contractor as a result of a change in the actual constructed quantities from the estimated quantities shown on the Bid Proposal. REWIRED gNAMGEe IN PRESEIR CONTMCT Coraad or Cons or Clxarad or New or New or New or Mem Dge Order) )Mason for Change Order(Please describe nem below and than idlow cola reason far Line Item tib Pravbua Pravlpid P nnount Una Change Order) 1) Requested by City 2)Unknown Site COMtbre 3)Not Incorporated In pbrrs/spert Adjusted Adjusted Adjusted Quirillty Una Pride Amlot Civan#ty Una Puce Amount 2 1.428 $17.99 $25.689.72 SF Concrete Pad for Fitness Court-deduct for rock donation from Martin Marietta 1,428 $17.43 $24,889.72 10 0 $6.150.92 $0.00 LS Footings for Shade Structure 1 $6,150.92 $6,150.92 11 0 $5,165.91 $0.00 EA Install Shade Structure 1 $5,165.91 $5,165.91 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 Previous Tolall $25.689.72 Adjusted Total $36.206.55 Net Change $100516.83 stt.mant orceatrad Original Contract Amount $46,073.92 Net Amount of Previous Additions and Deductions $0.00 Net Contract Amount Prior to This Request $45,073.92 Amount of This Request $10,516.83 New Contract Amount $55,590.75 Percent Change in Contract Amount 23.33% DESIGN ENGINEER: CITY OF RIVERSIDE,MISSOURI: r,�„pany N/A Capital Projects and Parks Manager: h,mn vrmwd Noel Challis R' sd,.w City Administrator: ow.. Brian Koral se, CONTRACTOR: ON-SITE PROJECT MANAGER: CONTRACTOR'S Certification for Chance Order: ONSITE PROJECT MANAGER Certification for Chandie Order: The undersigned WNr CTM certifies Mat all changes In am.ordance with Me Cordeet Documents.Me on-site oeservaG«a,and des«,bed above are necessary M order for Me 00Wr TOR to the data comprising Mrs change meat.Me on-site prejact menagm des proceed with a,ecvOm of Me centrad documents,and MM em b the Owner Mat to the bast of Me ondhe project managers knowledge. vawes stated above are tenth wtM rasped 1g Me w«k IMmmation and belief he above rerererwed Manges era n..,in order to anticipated under flys Mange odar proceed with Me eaecuaon or the contract doodrents,and Mat the values abbe above are torted vnM respect to eco wmk ankoipatad under this change«der. cnmpay Qrt^IYtC_ cempah, WA Nam PrNd. W I fi,psi 5. Nun.Parttl. _ slg,wd: sw.d. Dee Deb: CITY OF RIVERSIDE MISSOURI Upstream from ordinary. 2950 NW Vivion Road Riverside, Missouri 64150 MEMO DATE: July 10, 2018 AGENDA DATE: July 17, 2018 TO: Mayor and Board of Aldermen FROM: Noel Challis RE: Change Order I: LARRISON CONSTRUCTION, INC. Fitness Court Project (218-018) BACKGROUND: The Fitness Court Project was approved on 7-3-17. In addition, during the Engineering Department discussion, the Board confirmed their preference to add the shade structure to the project. This Change Order authorizes Larrison Construction, Inc. to include Alternate B, the shade structure, in the project This Change Order also reflects an $800 material credit for a gravel donation from Martin Marietta. BUDGETARY IMPACT: Approximately $55,590.75 will be expended out of the Fitness Court Project budget. Original Contract Amount $45,073.92 Total of Previous Changes $0.00 Total this Change Order $10,516.83 Current Contract Total $55,590.75 RECOMMENDATION: Staff recommends approval of the resolution and acceptance of the change order with Larrison Construction, Inc. to include Alternate B, the shade structure, in the Fitness Court Project