AN ORDINANCE APPROVING A MUNICIPAL AND COST APPORTIONMENT
SUPPLMENTAL AGREEMENT #1 WITH THE MISSOURI HIGHWAYS AND
TRANSPORTATION COMMISSION
BE IT ORDAINED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE,
MISSOURI AS FOLLOWS:
Section 1. That the Riverside Board of Aldermen ('Board") hereby approves the Municipal
and Cost Apportionment Supplemental Agreement #1, in substantially the form
attached hereto, by and between the City of Riverside and the Missouri Highways
and Transportation Commission. The Mayor is authorized to execute the Agreement
on the City's behalf.
Section 2. The Mayor, the City Administrator, and other appropriate City officials are hereby
authorized to take any and all actions as may be deemed necessary or convenient to
carry out and comply with the intent of this Ordinance and to execute and deliver for
and on behalf of the City all certificates, instruments, agreements and other
documents, as may be necessary or convenient to perform all matters herein
authorized.
Section 3. This Ordinance shall be in full force and effect from and after its passage and
approval.
BE IT REMBERED that the above was read two times by heading only, PASSED AND
APPROVED by a majority of the Board of Aldermen and APPROVED by the Mayor of the
City of Riverside this day of , 2019.
V�i
Mayor Kathleen L. Ro e
ATTEST: 4
Robin-Kinp d;dity_C-lerk
CCO Form: DE07 Municipal and Cost Apportionment .
Approved: 07/97 (DPP) Agreement
Revised: 04/18 (BDG) Route: 9
Modified. 01/19 (BDG) County: Platte
Job No.: J4S3202
MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION
MUNICIPAL AND COST APPORTIONMENT
SUPPLEMENTAL AGREEMENT#1
THIS MUNICIPAL AND COST APPORTIONMENT SUPPLEMENTAL
AGREEMENT #1 is entered into by the Missouri Highways and Transportation
Commission (hereinafter, "Commission") and the City of Riverside (hereinafter, "Entity").
WITNESSETH:
WHEREAS, on April 10, 2017, the Commission and the Entity entered into a
Municipal and Cost Apportionment Agreement (hereinafter, "Original Agreement") as to
coordinate public improvements designated as Commision Job No. J3S3202, for the
improvement of Route 9 at the intersection of Mattox Road;
WHEREAS, on September 26, 2018, the Commission and the Entity entered into
a Relinquishment Agreement to coordinate public improvements on the north outer road
NW Platte Drive and portions Mattox Road prior to the conveyance of these roadways.
WHEREAS, the parties now desire to revise the Original Agreement as provided
in this Supplemental Agreement#1.
NOW, THEREFORE, in consideration of the mutual covenants, promises and
representations in this Agreement, the parties agree as follows:
(1) REVISION: Paragraph (2) LOCATION of the Original Agreement is hereby
removed in its entirely and replaced with the following.:
(2) LOCATION: The transportation improvement that is the subject of this
Agreement is contemplated at the following location:
At the intersection of Missouri Highway 9 and Mattox Road including the
north and south approaches of the intersection and the north outer road
NW Platte Drive.
The general location of the public improvement is shown on attachment marked
"Exhibit A" and incorporated herein by reference.
(2) REVISION: Exhibt A of the Original Agreement is hereby removed in its entirely
and replaced by the Exhibit A to Supplemental Agreement #1, attached hereto and
made part herein.
(3) REVISION: Paragraph (6) RIGHT-OF-WAY .ACQUISITION of the Original
Agreement is hereby removed in its entirely and replaced with the following:
(A) Upon approval of all agreements, plans and specifications by the
Commission and the Federal Highway Administration (FHWA), the Commission will file
copies of the plans with the city clerk of the City and the county clerk of the county and
proceed to acquire at its expense, at no cost or expense to the City, any necessary
right-of-way required for the construction of the improvement.
(B) The portion of state highway Missouri 9 covered by this Agreement
shall be a limited access highway and rights of access between the highway and
abutting property shall be procured and the cost classified as right-of-way cost and paid
for by the Commission in the same manner as other right-of-way costs. Only such
rights of ingress and egress shall be allowed as indicated on the plans approved by the
Commission and FHWA.
(4) REVISION: Paragraph (12) PAYMENT RESPONSIBILITES of the Original
Agreement is hereby removed in its entirely and replaced with the following:
(12) PAYMENT.RESPONSIBILITIES: With regard to payment responsibilities
under this Agreement, the parties agree to as follows:
(A) The currently estimated construction contract cost is one million three
hundred forty two thousand dollars ($1,342,000). The payment responsibilities are
shown on attachment marked "Exhibit B" and incorporated herein by reference.
(B) The Entity has authorized the Commission to use seven hundred eleven
thousand five hundred and sixty-one dollars ($711,561.00) in Surface Transportation
Program (STP) funding from the Mid-America Regional Council towards the
construction of the project in State Fiscal Year 2020. The Commission will provide the
matching funds for the STP funds.
(C) The Commission will be responsible for the balance of the construction
contract costs in excess of seven hundred eleven thousand five hundred and sixty-one
dollars ($711,561.00). The underruns will be shared between the Commission and
Entity on-a pro-rata basis.
(D) The Commission will be responsible for all costs associated with the
preliminary engineering, right of way acquisition and incidentals, utility relocation
coordination, administration of the contract, and inspection at no cost or expense to the
Entity..
(5) REVISION: Exhibt B of the Original Agreement is hereby removed in its entirely
and replaced by the Exhibit B to Supplemental Agreement #1, attached hereto and
made part herein.
(6) REVISION: Paragraph (13) COMMINGLING OF FUNDS of the Original
Agreement is hereby removed in its entirely.
(7) ORIGINAL AGREEMENT: Except as otherwise modified, amended, or
supplemented by this Supplemental Agreement#1, the Original Agreement between the
parties shall remain in full force and effect and shall extend and apply to this
Supplemental Agreement#1 as if fully written in this Supplemental Agreement#1.
[Remainder of Page Intentionally Left Blank; Signatures and Execution Appear on
Following Page]
IN WITNESS WHEREOF, the parties have entered into this Agreement on the
date last written below.
Executed by the Entity this day of 2019.
Executed by the Commission this 4Z—day of r 12019.
MISSOURI HIGHWAYS AND
TRANSPORTATION COMMISSION CITY OF RIVERSIDE
By
Title Assistant Chief Engineer Title C)
ATTEST:
. r.
.40
7, e
B
Secretary to the Commission
Title
Approved as to Form: Approved as to Forir,;'
Commi ion Counsel
Title:
Ordinance No 1( �
EXHIBIT A
EY.N IDiT 11
LEOE?+D C[NiRACT 9ETIIEEN
KOSSONRE HIGHWAYS AND TROdSPCRTATIDN
LCR:hT]ae C'.W]55E DN
-ANO-
CITY OE RIVERSIDE, PLATTE COONT'Y,MISSOOR7
LCNVflT. w,A1D Oee1FAfH[41 TD CITY OF RIVERSIDE
(WAN
4 p.38LµllF3lr
�G e
r
6-57-33 s t
r f
A Yei E e eE— +T tOp,ee
STA i+W O<'R ROUTE 9 AN
1
STA 2?Uee. M e1W.00 9TA td Tp 5TA la—e0
9T leya re ]lFs NErS�
� t Kynl ed➢
5
rd,R
:—W..Tp eE—9Te1.CTm
TM'Px9ii[ON ttp CGIYEYEp TM
CXAp16T0:epVTE 6TATLGePEPpti[s
N[7T 70 SCALE
EXHIBIT B
Project Name: Route 9 and Mattox Road Intersection
MoDOTJob Number: J4S3202
Local Entity: City of Riverside
Total Construction Cost:
Phase Current Estimate
Construction $ 1,342,000.00
TOTAL $ 1,342,000.00
Project Responsibilities:(MoDOT/City/Shared)
Design MoDOT
Right of Way Acquisition MoDOT
Utilities MoDOT
Letting MoDOT
Inspection MoDOT
Construction MoDOT
Financial Responsibility(Construction):
Dollars
MoDOT 630,439.00
City STP Funds 711,561.00
TOTAL 1,342,000.00
How will overrun/underruns be handled?
MoDOT will be responsible for all costs above the Entity's STP funds of$711,561. The
underruns will be shared between the Commission and Entity on a pro-rata basis.