HomeMy WebLinkAboutR-2019-025 Mattox Road Design Services CFS Engineers $26,250 RESOLUTION NO. R-2019-025
A RESOLUTION APPROVING PROFESSIONAL SERVICES WITH CFS ENGINEERS,
P.A. FOR MATTOX ROAD DESIGN SERVICES IN THE AMOUNT OF $26,250
WHEREAS, City Code Section 135.180 provides that a procurement recommendation
will be made to the Board of Aldermen when fees for service exceed $10,000; and
WHEREAS, City Staff recommends that the City engage CFS Engineers, P.A. for
Mattox Road Design Services,
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF
THE CITY OF RIVERSIDE, MISSOURI AS FOLLOWS:
THAT the Riverside Board of Aldermen ("Board") hereby approves the proposal letter
with CFS Engineers, P.A. in substantially the form attached hereto as Exhibit "A", and the
Mayor is authorized to execute the proposal letter; and
FURTHER THAT the Mayor, Finance Director and other City officials are hereby
authorized to take any and all actions as may be deemed necessary or convenient to carry out and
comply with the purpose and intent of this Resolution and to execute and deliver for and on
behalf of the City all certificates, instruments, agreements and other documents, as may be
necessary or convenient to perform all matters herein authorized; and
FURTHER THAT this Resolution shall be in full force and effect from and after its
passage.
PASSED ANDA OPTED by the Board of Aldermen of the City of Riverside,
Missouri,the D,0-5� day of 2019.
or Kathleen L. Rose
Robih Kincaid',' City Clerk
1
ENGINEERS
• One Vision.One Team. One Call.
1421 E. 104th Street September 13, 2018
Ste 100
Kansas City,Missouri 64131
(816)333-4477 office Mr. Travis Hoover, P.E.
City Engineer
cfse.com
City Hall, City of Riverside
2950 NW Vivion Road
Other offices: Riverside, MO 64150
Kansas City,Kansas
Lawrence,Kansas
Holton,Kansas Mattox Road Design Services
Topeka,Kansas
Wichita,Kansas
Hollister,Missouri Dear Mr. Hoover,
Springfield,Missouri
Jefferson City,Missouri
Cook, Flatt, and Strobel Engineers (CFS) is pleased to present our proposal for
engineering services to complete a "Mattox Road Design Services". This letter
provides our understanding of your project needs, our scope of services to deliver the
design, our fee and our
schedule for delivering
these services. ---
•
•
Introduction
Intersection Project Start
improvements to the
Missouri Route 9 and
Board of Directors. Mattox Road were
Kenneth M.Blair P.E.
Robert S.chambers P E studied as part of the +10i.ct OIAL M
Kevin K.Holland,P E
2015 Route 9 Corridor ..�.a.�
Daniel W.Holloway,P.E. • "' �y
Charles C.LePage,P.E. Study. The study
Lance W.Scott,P.E. identified traffic signal Possible Sidewalk
Sabin A.Yanez,P.E.
improvements at the
i stet X
intersection and c�
roadway improvements ,
to Mattox Road, south ..
to the railroad crossing.
Associates:
Aaron J.Gaspers,P.E. This scope of services
Michelle L.Mahoney,P.E. will deliver the design
Michael J.Morrissey,P.E. stn
Gene E.Petersen,P.E. and construction .,,, -Iwo'a.
Todd R.Polk,P.E. documents for Mattox
William J.Stafford,P.E. -- ---
Richard A.Walker,P.E. Road from the levee '" Nan•tTM .K. tre+ }
Lucas W.Williams,P.E. access drive, south t0 ��� � E`t �. - r• �K •IRf~�'—
(rdr
the railroad crossing.
ENGINEERS
One Vision.One Team.One Call.
Scope of Services - Mattox Road
1) Survey/Data Collection - Perform field topographic and elevation survey of existing conditions
for base map for design. Locate existing utilities from visible surface features and Missouri
One-Call locations. Determine location of existing right of way lines within the project limits.
2) Pavement Coring - Cores of the existing pavement will be collected to determine the thickness
and composition of the existing pavement structure. The pavement will be cored at
approximately 100' intervals. A total of 5 corings will be collected
3) Coordinate with utility owners that have facilities within the corridor.
a) Send Notification of project and map of surveyed location of the existing utilities to each
utility owner, requesting verification of the location of utilities as mapped.
b) Send notification with preliminary plans, identifying potential utility conflicts.
c) Send notification with final plans alerting Utility Owners of anticipated construction date
and required relocation completion date.
4) Preliminary Design/Preliminary Plans - Preliminary Plans for the project will be developed. The
plan views English scale shall be 1"= 50' horizontal and the profile view English scale shall be
1"=50' horizontal, and 1"=10' vertical. Preliminary cross sections on 25 foot intervals will be
developed to sufficient detail to determine construction limits and potential needs for additional
right of way and construction easements.
5) The Engineer will update the project construction estimate based on the preliminary plans and
will submit the preliminary plans and estimate to the client for review. The preliminary plans
shall include the grading limits, property lines and ownerships, section lilines, township, and
township and ranges.Typical sections will indicate pavement section for the roadway.
6) A Field Check meeting will be arranged with the Client to discuss design features in the project
area.
7) Right of way Plans - The plans will be updated to incorporate the comments form the field
check meeting. We will prepare right of way exhibits and legal descriptions for any permanent
right of way and temporary easement takings. We will attend meetings with each of the two
adjacent property owners to review the project impacts on each of their facilities.
8) Final Plans, Specifications and Estimate - The plans will be updated to add any revisions
necessitated by the right of way acquisition process. Additional details will be added to the
plans including pavement marking and signing, street lighting, erosion control, and traffic
control plans. We will prepare a project manual incorporating City Standard front end
documents for bidding, contracting, general and special conditions, and project technical
specifications. The Engineer will update the project construction estimate based on the final
plans and will submit the final plans, specificaions and estimate to the client for review.
DELIVERABLES -
1. Four (4) sets of prints of plans showing profile grades, geometric data, alignment data,
roadway plans, culvert, and cross sections, etc., and one (1) copy of drainage computations.
2. Four (4) copies of the project manual.
3. One (1) copy of a summary of quantities and estimate of the construction costs.
ENGINEERS
• One Vision.One Team.One Call.
STANDARDS
The Engineer shall use the latest version of the following publications to determine the design criteria
and procedures, which will be followed for development of the project: "APWA Design Criteria and
Specifications", "AASHTO's "Manual on Uniform Traffic Control Devices" (MUTCD), AASHTO's "A
Policy on Geometric Design of Highways and Streets", "Missouri Standard Specifications for Highway
Construction", "Missouri Standard Plans
Schedule
CFS is prepared to begin work upon acceptance of our proposal. We anticipate that we may complete
scope items 1- 8 within 60 calendar days from receipt of our notice to proceed.
Fees
1. Survey/Data Collection............................................................... $3,500.00
2. Pavement Corings .................................................................... $3,750.00
3. Utility Coordination ................................................................... $2,500.00
4. Preliminary Design/Preliminary Plans .......................................... $6,500.00
5. Preliminary Plans Cost Estimate ................................................ $500.00
6. Field Check Meeting ................................................................ $1,500.00
7. Right of Way Plans............................................................... $3,500.00
8. Final P S & E ............................................................... $4,500.00
Total Fee: $26,250.00
Thank You again for the opportunity to submit our proposal. Please let me know if you have any
questions or require additional information.
Cook, Flatt, and Strobel Engineers, PA
Rick Walker, PE
Associate, Project Manager