HomeMy WebLinkAbout1672 Final Development Plan 4151 NW 41st Street BILL NO. 2019-035 ORDINANCE NO. �
AN ORDINANCE APPROVING A FINAL DEVELOPMENT PLAN FOR LAND
LOCATED AT 4151 NW 41St STREET, RIVERSIDE, MISSOURI, IN ACCORDANCE
WITH THE UNIFIED DEVELOPMENT ORDINANCE OF THE CITY OF RIVERSIDE
WHEREAS, Application No. PC19-03 was submitted to the City by North Point
Development for approval of a Final Development Plan for construction of an
approximately 205,098 square foot industrial facility ("Development Plan") located on an
approximately 11-acre tract of land at 4151 NW 41St Street., Riverside, Missouri;
WHEREAS, the Planning Commission held a meeting on June 13, 2019 to consider
said application and recommended that the Development Plan be approved; and
WHEREAS, the Board of Aldermen find it to be in the best interests of the City in order
to further the objectives of industrial and economic development of the City, as well as
in furtherance of the objective to protect the health, safety, and welfare of the
businesses and citizens of the City, to approve the Development Plan as set forth
herein.
NOW THEREFORE, BE IT ORDAINED BY THE BOARD OF ALDERMEN OF THE
CITY OF RIVERSIDE, MISSOURI, AS FOLLOWS:
SECTION 1 — BEST INTEREST OF THE CITY TO APPROVE DEVELOPMENT PLAN.
It is in the best interests of the City in order to further the objectives of industrial and
economic development of the City, as well as in furtherance of the objective to protect
the health, safety, and welfare of the businesses and citizens of the City, to approve the.
Development Plan, attached hereto as Exhibit A and incorporated herein, for
development of property located at 4151 NW 41St Street, Riverside, Missouri, and
legally described as Lot 8 of Riverside Horizons'East First Plat, and such Development
Plan is hereby approved, subject to the conditions provided herein, to allow for the
construction of an industrial facility according to such plan.
SECTION 2 — CONDITIONS OF APPROVAL. The following conditions of approval
shall apply with regard to the Development Plan approved for development of the
property:
1.The approval of the Development Plan does not relieve the developer
from compliance with all other applicable local, state and federal laws,
codes, ordinances, and regulations. The developer is required to request
and obtain approval for all necessary permits to begin constructing the
development.
SECTION 3 — AUTHORITY GRANTED. The Mayor, the City Administrator, Special
Counsel to the City, and other appropriate City officials are hereby authorized to take
any and all actions as may be deemed necessary or convenient to carry out and comply
WA 6324022.1
with the intent of this ordinance to execute and deliver for and on behalf of the City all
certificates, instruments, agreements and other documents, as may be necessary or
convenient to perform all matters herein authorized.
SECTION 4 — EFFECTIVE DATE. This ordinance shall be in full force and effect from
and after the date of its passage and approval.
BE IT REMEMBERED that the above was(read .two times by heading only, PASSED
AND APPROVED by a majority;;of.;the:,Board;.of Aldermen and APPROVED by the
Mayor of the City of Riverside,,Missoun, this 16th day of July, 2019.
6
+, Kathleen L. Rose, Mayor
ATTEST:
v
4111-'�,tt�
Robin Ki .
" - t i Clerk
....
2 WA 6324022.1
EXHIBIT A
FINAL DEVELOPMENT PLAN
HORIZONS INDUSTRIAL X
FINAL DEVELOPMENT PLAN
CITY OF RIVERSIDE,PLATTE COUNTY,MISSOURI
f7p
6-7)
WA 6324022.1
EXHIBIT B
LEGAL DESCRIPTION
Lot 8 Riverside Horizons East First Plat
4 WA 6324022.1
Site Location
4k
. y NW plRr�e
2
LAW h!
arks
�Wnt t Sb$I
1 �• i
i
1
I 1 I
Cmr OF City of Riverside
RIVERSI-W
Staff Analysis Report
MISSOURI y P
Upstream from ordinary. Case Number PC 1-03, Final Development Plan
4151 NW 41 st Street
Horizons Industrial Spec X
General Information
Applicant: NorthPoint Development, Horizons Industrial X, LLC
Location: 4151 NW 41St Street
Application: Final Development Plan
Zoning: PD- Planned Development
Existing Land Use: Undeveloped
Proposed Land Use: Light Industrial
Final Development Plan: Final Development Plan will be reviewed by the Planning
Commission and the Board of Aldermen for approval.
Site Area: 471,158 sq.ft. (10.82 acres)
Building Size: 202,142 sq. ft.
Building to Area Ratio: Approximately 43%
Analysis
Site Layout: The proposed site is undeveloped. The property is bound on the north by the left
station and BNSF Rail Road Tracks. To the east is Interstate 635. South of the property is the
swale and undeveloped land, and to the west are Horizons V and Horizons VI.
The building will run north-south with the main entrances being located on the east side of the
building on NW 41St Street. Standard car parking is provided to east and truck parking will be
on the west side of the property along 41 st Street.
Parking: The plan proposes 185 parking spaces designated for customers and employees on the
north, east and south sides of the building. There are 26 building docks with the ability to add
another 20 docks. Trucks can park at these docks for loading and unloading, however there is
not addition truck parking.
Infrastructure:
Sanitary Sewer: Sanitary sewer will be located along the south side of 41 st Street.
Water: Water will be available along the north side of 41 St Street.
Gas: Gas will be available along the north side of 41St Street.
Electric: Underground electric will be located along the north side of 41' Street
Telecommunication: Telecommunication/fiber optics will be available on the north side of NW
41s' Street.
Pagel of 2
Stormwater: Stormwater from this site will be conveyed lots and drives by storm sewer and
routed to open channels along the roads to drain into the canals and lakes. The drainage onsite
will help with water quality as all of the swales will act as infiltration swales.
Building Design: The building will be constructed of insulated precast concrete wall panels.
The applicant will be applying for Leadership in Energy and Environmental Design (LEED)
Certification. The building matches the theme throughout Horizons East. The building will
include elements of glass similar to other industrial buildings in this park. These glass elements
will be on the north, south and west sides of the building to increase natural light into the office
areas. The warehouse portion of the building will also include glass for clear story windows to
allow natural daylighting in warehouse operations.
Outdoor Storage: Horizons Spec X does not have any current outdoor storage needs. The
building is designed to be an industrial type use so the parking of truck trailers is anticipated at
the docks only.
Landscaping: The approved PD regulations for all property east of Horizons Parkway address
landscaping for industrial sites. The four components of landscaping required includes:
building frontage at the street(right-of-way), common areas (not applicable to this site),parking
lots, and building foundation. The applicant has provided parking lot and foundation plantings
exceeding the adopted PD standards which require 1 tree per 40 feet and the applicant is
providing 1 tree per 30 feet of space. These plantings consist of trees located within the interior
yards and parking islands and shrubs at the building entrances
Signage: Site signage is regulated by the adopted PD regulations for the Riverside Horizons
Development. At this time the applicant has not submitted any sign plans.
Comprehensive Master Plan: Throughout the development of the Comprehensive Master Plan
it was articulated by participants that improving community image/character and the quality and
design of buildings was a key concern. Additionally, the Comprehensive Master Plan identifies
the site as part of the `Horizons Development', which is ultimately envisioned to include a mix
of innovation and industry, mixed use, destination office, destination retail and recreation.
Recommendation
Staff finds the application in conformance with the standards set forth in the UDO and the goals
established in the Comprehensive Master Plan and therefore recommends approval of the
application with the condition that additional landscaping is added to the south side of the
building for screening.
Attachments
• Final Development Plan: Site Plan
• Location Map
Page 2 of 2