HomeMy WebLinkAboutR-2019-124 CO1 Mega Industries Corporation 2019 Jumping Branch Trail Project RESOLUTION NO. R-2019-124 A RESOLUTION APPROVING CHANGE ORDER 1 TO THE AGREEMENT WITH MEGA INDUSTRIES CORPORATION FOR THE 2019 JUMPING BRANCH TRAIL PROJECT (205-047) RESULTING IN A REVISED CONTRACT AMOUNT OF $868,431.76 FOR SUCH PURPOSES WHEREAS, the City of Riverside ("City") issued an Invitation to Bid for the 2019 Jumping Branch Trail Project which was awarded to MEGA Industries Corporation pursuant to Resolution R-2019-096; and WHEREAS, the Board of Aldermen finds that it is in the best interest of the City to approve Change Order 1 to the agreement with MEGA Industries Corporation, resulting in a total revised contract amount not to exceed $868,431.76 for the Jumping Branch Trail Project in the 2019-20 budget year. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE,MISSOURI,AS FOLLOWS: THAT Change Order 1 to the Agreement between the City and MEGA Industries Corporation, a copy of which is attached hereto and incorporated herein, is approved and the Mayor is authorized to execute the same on behalf of the City. The resulting revised total contract-amount shall not exceed $868,431.76. FURTHER THAT the Mayor, City Administrator and all other required city officials are authorized to take such other actions.and/or execute and deliver for and on behalf of the City all certificates, instruments, agreements and other documents as may be deemed necessary or convenient to carry out and comply with the intent of this Resolution. PASSED AND ADOPTED by the Board of Aldermen of the City of Riverside, Missouri,.the,17th day of December 2019. atleen L. Rose, Mayor Robin,I incdY&, City.Clerk .4 CITY OF RIVE R1 MISSOURI Upstream from ordinary. 2950 NW Vivion Road Riverside, Missouri 64150 MEMO DATE: December 9, 2019 AGENDA DATE: December 17, 2019 TO: Mayor and Board of Aldermen FROM: Travis Hoover RE: Change Order I: MEGA Industries Corporation 2019 Jumping Branch Trail (205-047) BACKGROUND: This change order is for an additional $1 1,649.76. Several items are reflected in this amount. The most significant change was to increase the seeding, fertilization and mulching to allow for better erosion control. Additional costs for this line item were partially offset by reductions in other areas. The amount of rip-rap and filter fabric installed were also slightly increased to protect from stream erosion. BUDGETARY IMPACT: $11,649.76 would be authorized for budget year 2019-2020. Original Contract Amount $ 856,782.00 Total of Previous Changes $ 0.00 Total this Change Order $ 11,649.76 Current Contract Total $ 868,431.76 RECOMMENDATION: Staff recommends approval of the ordinance and acceptance of the change order with MEGA Industries Corporation. CITY OF CHANGE ORDER NO. 1 Data Prepared: 12/9/2019 RIVERS MISSOURI Contractor Name: MEGA Industries Corporation Project Name: 2019 Jumping Branch Trail Page Number: 1 of 1 Project Number: 205-047 x of Pgs Attached: Contract Date: 8/26/2019 The following changes to the original contract amount were required to cover cost incurred by the Project Location: Riverside,Missouri Contractor or to reflect savings realized by the Contractor as a result of a change in the actual constructed quantities from the estimated quantities shown on the Bid Proposal. REQUIRED CHANGES IN PRESENT CONTRACT Contract or Contract or Contract or Item Description &Reason for Change Order(Please describe item below and then follow with reason for New or New or New or Line Item No, Previous Previous Previous Unit Change Order) 1) Requested by City 2)Unknown Site Condtions 3)Not incorporated in plans/specs Adjusted Adjusted Adjusted Quantity Unit Price Amount Quantity Unit Price Amount 4 2.640.0 $42.50 $120,700.00 SY 6 I Concrete Trail 2,838.00 S42.50 5120,615.00 5 2,998.0 $14.00 $41,972.00 SY MODOT Type 1 Base(6 IN) 2.995.00 $14.00 $41,930.00 6 870.0 $3.50 $3,045.00 SY Filter Fabric 919.00 $3.50 53,216.50 7 1,400.0 $49.40 $69,160.00 TON ITvoe 2 Riprap(24 IN Thick) 1,497.00 $49.40 $73,951.80 9 1.6 $2,222.00 $2,222-00 EA Existing Manhole Adjustment 0,00 $2,222.00 $0.00 101 2,550.0 $1.40 $3,570.00 LF ISediment Fence 1,500.00 $1.401 $2,100.00 12L 7.600.01 $0.42 $3,192.00 SY ISeeding,Fertilize&Mulch 32,613.00 $0.42 $13,697.46 Previous Total $243,861.00 Adjusted Total $255,510.76 Net Change S11.649.76 Statement of Contract Original Contract Amount S856,782.00 Net Amount of Previous Additions and Deductions $0.00 Net Contract Amount Prior to This Request $856,782.00 Amount of This Request $11,649.76 New Contract Amount 5868,431.76 Percent Change in Contract Amount 1.336% DESIGN ENGINEER: CITY OF RIVERSIDE,MISSOURI: lChhan Company: City Engineer: Name Printed: Travis Hooverd Dale Signed: City Administrator: DEC 2 201� Date: Brian Koral Date City Administrator CONTRACTOR: ON-SITE PROJECT MANAGER: CONTRACTOR'S Certification for Change Order: ON-SITE PROJECT MANAGER Certificatiorder. The undersigned CONTRACTOR certifies that all changes In accordance with the Contract Documents,the on-site observations,and described above are necessary in order for the CONTRACTOR to the data comprising this change order,the on-site project manager certifies proceed with execution of the contract documents,and that the to the Owner that to the best of the on-site project managers knowledge, values stated above are carred with respect to the work information and belief the above referenced changes are necessary in order to anticipated under this change order proceed with the execution of the contract documents,and that the values stated above are correct with respect to the work anticipated under this change order. co,,,_,:Mega Industries Corporation Company: Namevrmled: Bfelt•Kreikernai8r Name Printed: `a9^.d _ —, ' Signed: Daae Date: