BILL N0.2006- 84
ORDINANCE N0.200(r84
AN ORDINANCE APPROVING THE FORM OF, AND AUTHORIZING THE CTfY TO
COMPLETE AND EXECUTE, A SUPPLEMENTAL AGREEMENT BY AND BETWEEN
THE CITY OF RIVERSIDE, MISSOURI AND PATTI BANKS ASSOCIATES FOR
ADDITIONAL DESIGN SERVICE6 FOR LINE CREEK TRAIL PROJECT
WHEREAS, the City of Riverside, Missouri (the "City") and Patti Banks Associates executed a
contract for design services for the Line Creek Trail Connector, dated April 20, 2004, and authorized by
Ordinance No. 2004-32, and
WHEREAS, the City has determined that the City requires additional services for certain public
improvement projects, and that such services are for a public purpose, and the City desires to retain Patti
Banks Associates to provide such services; and
WHEREAS, the City has negotiated with Patti Banks Associates and the City and Patti Banks
Associates have reached a supplemental agreement (the "Agreement's concerning the provision of, and
payment for, such services.
NOW, THEREFORE, BE IT ORDAINED, by the Board of Aldermen of Riverside, Missouri, as
follows:
Section 1. The City of Riverside shall enter into the Agreement, to be substantially in the form
attached hereto as Exhibit A, with Patti Banks Associates, whereby Patti Banks Associates will provide
services specified in the Agreement, and as consideration for such services the City shall pay fees described
in the Agreement for an amount not to exceed Four Thousand Five Hundred Dollars and No Cents
($4,500.00).
Section 2. The Mayor and the City Clerk are authorized and directed to execute the Agreement,
execution of such document being conclusive proof of such approval. The Mayor, City Clerk, and City
Administrator are each authorized and directed to perform all acts and execute any other documents
necessary to effectuate the intent of this Ordinance.
Section 3. This Ordinance shall take effect immediately.
Passed this ~ day of June, 2006.
TIES
ity lerk
Mayor Kathleen L. Rose
t° .. 1
..
,.
_.
PATiI BANKS
ASSOfIATES
,
PBA inifiotes and produces cutting edge planning and environmental design that is ecologically driven and
community minded.
I.antlscapP. Architecture ^ Park, Greenway, and frail Planning ^ Natural Resource Planning ^ Community Solutions,
Design antl Planning .
Supplemental Agreement for Professional Services - No. 1
Line Creek Trail
PBA Project No. 03047
This is a SUPPLEMENTAL AGREEMENT between the City of Riverside, Missouri (herein referred
to as "OWNER") and Patti Banks Associates therein referred to as "PBA").
PBA has entered into an agreement with the City of Riverside, Missouri on J1meZ0,2006 to
provide professional services for the Line Creek Trail.
As requested by the Owner, PBA is providing the attached Scope of Services for additional
work for development of the Line Creek Trail plans.
The OWNER hereby authorizes an additional 54.500.00, hourly not-to-exceed, for the
performance of the services specified in the attached Scope of Services. The total
authorized amount under the original agreement plus this supplement is S59,890.00.
This SUPPLEMENTAL AGREEMENT is executed on,71s1e20,2006snd signature below constitutes
a Notice-to-Proceed.
All other terms and conditions agreed upon in the original agreement executed on April
20, 2004 remain the same.
Name~~f~~ ~. ~5~
Title: ~/~
A~O~
City of Riverside, Missouri
By:
Patti Banks Associates
w
gy: l~
Patti Banks
Principal
e16-756-5690 Waterworks Bufiding. 201 Mafn St. Suite 201 Kansas City, Missouri 64105
wVVw. pbassociates.com
r., ..
_.,
'y
Cssc~cGs"'~s
Supplemental Agreement for Professionol Services
Line Creek 7roi1
May 3, 2006
Page 2 of 2
Scope of Services -Addition
Provide professional services as stated below:
$ 4,500.00
PBA/TranSystems shall hire Terracon to provide geotechnical engineering services
in accordance with Attachment 1 dated April 18, 2006 and performed under a
Continuous Services Subcontract Agreement between TranSystems and Terracon
dated December 21, 2005.
A#tachmen# 1
Following pages
..
April 18, 2006
TranSystems Corporation
2400 Pershing Road, Suite 400
Kansas City, MO 64108-2504
ATTN: Mr. John Zimmermann
RE: Geotechnical Scope and Estimated Fee
Line Creek Retaining Wall
Riverside, Missouri
Proposal No. D0206164
Dear Mr. Zimmermann:
13910 West 96th Terrace
Lenexa, Kansas 66215
Phone 913.492.777!
Fax 913.492.7443
www.terracon.com
We are pleased to submit our proposal to provide geotechnical engineering services for the
referenced project. Our understanding of the proposed project and our proposed scope of
services are described herein. Our estimated fee for this project is attached. If we have
misunderstood any aspect of the proposed project, please advise us at once so we can evaluate
the scope of services we have proposed.
PROJECT INFORMATION
We understand that the project involves a new stacked gabion retaining wall. Specific details
regarding the new walls were not provided.
PROPOSED SCOPE OF WORK
Utility Locations
We will contact a utility locate service to have underground public utility lines located and marked.
It normally requires 2 to 3 business days to have utilities located. Sometimes, utility companies
ask us to meet with them on site to show them where we plan to drill. If available, plans showing
the locations of all public and private utilities should be provided.
Boring LocationslElevations
Terracon personnel will locate by estimating distances and right angles from existing site features.
Distances between borings will be estimated based on mapping features shown on the plans
provided to us. If requested, we can interpolate elevations from available topographic
information. If more precise locations and elevations are required, a land surveyor should locate
borings and determine elevations.
Subsurface Exploration
We understand that the site is accessible. We plan to use atruck-mounted drill rig to perform the
borings. TranSystems has requested two (2) boring locations for the retaining wall. We plan to
advance the borings to depths of 20 feet or practical auger refusal, whichever occurs first.
Delivering Success for Clients snd Employees Since 1965
More Than 80 Ofriees Nationwide
l~~rr~con
Consulting Engineers d Scientists
r.. ..
lferra~on
Geotechnical Scope and Estimated Fee
Line Creek Retaining Wall
Proposal No. D0206164
April 18, 2006
Samples of the soils will be obtained using thin-walled tubes and/or a split barrel sampler at 5-foot
intervals. If subsurface conditions are encountered which would merit alteration of the field boring
andlor sampling programs described above, we will contact you.
Laboratory Tests
In the laboratory, unconfined compression, calibrated penetrometer, water content, and dry
density tests will be performed on representative samples extracted from the thin-walled tubes.
Water content tests will be performed on split-barrel samples. Soil samples will be visually
classified in accordance with the Unified Soil Classification System (USCS).
Engineering Services
After completion of exploration and laboratory testing, the data and conditions would be analyzed
and a report will be prepared by or under the supervision of a registered professional engineer.
The, geotechnical report will contain a description of the project, a summary of the drilling,
sampling, and testing procedures and logs of the borings with laboratory test results. The report
will present professional opinions and recommendations concerning the following:
Foundation design parameters (allowable bearing pressure, estimated settlement,
frost depth and minimum sizes).
Lateral earth pressure and friction resistance considerations, as applicable.
Global Stability Analysis, if requested.
This proposal has been prepared in accordance with generally accepted geotechnical engineering
practices. We understand this proposal letter and fee estimate schedule will be attached to a task
order and will be performed under the Continuous Services Subcontract Agreement between
TranSystems and Terracon dated December 21, 2005. We look forward to working with you on
this project. If you have any questions, please contact us.
Sincerely,
-- / ~~ ,
r
i~" ~
~, ,i
Jaryfes M. andrum, P.E.
S nior i~r ject Engineer
2
. ,
GEOTECHNICAL EXPLORATION
LINE CREEK RETAINING WALL
PROPOSAL NO. D0206164
APRIL 18, 2006
ESTIMATE OF FEES
QUANTITY UNIT RATE
ITEM
f Drill Rigs and Crew (Truck)
i 1 L.S. 285.00 /ls
Ih
on o
Mobilizat
dination (Levee District)
C g hours r
89.00
h
oor
Project 1 hours r
125.00 I
Boring Layout
Auger Drilling and Sampling 40 ft 13.00 Ift
0 - 20' ft 14.25 Ift
20 - 40' 41.00 Ift
Rock Coring 90.00 lea
Rock Coring Setup
Laboratory Testing 10 ea 9.00 lea
Moisture Content 10 ea 11.00 lea
Dry Density
fined Compressive Strength -Soil 4 ea 29.00 lea
Uncon 2 ea 55.00 /ea
Atterberg Limits ea .410.00 lea
One-dimensional consolidation
Engineering Analysis/Report Preparation 1 hours 76.00 /hr
Boring Log Preparation g hours 100.00 Ihr
Project Engineer 1 hours 140.00 Ihr
Principal Engineer
Global Stability Analysis 12 hours 100.00 Ihr
Project Engineer
Estimated Project Subtotal
Estimated Project Total wl Contingency
COST
285.00
534.00
125.00
520.00
l~erracon
I- I ...