HomeMy WebLinkAboutR-2020-017 Application for Platte County Stormwater Grant Program RESOLUTION NO. R-2020-017
A RESOLUTION APPROVING AND ENDORSING APPLICATION TO THE PLATTE COUNTY
COMMISSION FOR FUNDING UNDER THE PLATTE COUNTY STORMWATER GRANT
PROGRAM, FUNDED BY THE COUNTY-WIDE DEDICATED PARKS AND RECREATION
AND STORMWATER HALF-CENT SALES TAX
WHEREAS,the County of Platte and the City of Riverside deem it a high priority to improve quality of
life for all citizens through maintaining stormwater infrastructure, and
WHEREAS, the County Commission of the County of Platte seeks to support local efforts, create
effective partnerships, and increase the level of cooperation between County government and cities,
schools, and non-profit community service organizations within the county, and
WHEREAS,the citizens of Platte County on August 4,2009 approved a renewal of the dedicated half-
cent sales tax for parks, recreation, and stormwater control for a period of ten(10)years, and
WHEREAS,the County Commission of the County of Platte has developed the Stormwater Grant
Program,funded by the citizen approved half-cent county-wide sales tax, and
WHEREAS,the City of Riverside wishes to make application to the County for consideration of the
attached and completed Stormwater Grant Program Application, and
WHEREAS,the Board of Aldermen of the City of Riverside agree to comply with all program guidelines
and requirements of said Stormwater Grant Program, including providing matching funds if such
application shall be funded by the County Commission,
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE
CITY OF RIVERSIDE,MISSOURI,AS FOLLOWS:
THAT the attached application is respectfully submitted for consideration by the County
Commission.
FURTHER THAT the Mayor, the City Administrator, and other appropriate City officials are
hereby authorized to take any and all actions as may be deemed necessary or convenient to carry out and
comply with the intent of this Resolution and to execute and deliver for and on behalf of the City all
certificates, instruments, agreements and other documents, as may be necessary or convenient to perform
all matters herein authorized.
PASSED AND ADOPTED by the Board of Aldermen of the City of Riverside, Missouri, the
, Q%day of March 2020.
eaw
_ Mayor Kathleen L. kose
Robin l:iiiLi', City Clerk
Platte County Stormwater Management Grant Program -
2020 Application
I City of Riverside
Name of Applicant Agency or Organization
2. 2950 NW Vivion Rd Riverside MO 64150
Mailing Address City State Zip
3. Travis Hoover City Engineer
Contact Person Title
816-741-3993 thoover@riversidemo.com
Phone Email Address
4. PROJECT APPLICANT: (Check One)
❑X Local Government, School District, or other political subdivision
❑ Homeowner's association
❑ Other(Explain)
5. NAME OF PROJECT:
Indian Hills Cured in Place Pipe
6. LOCATION OF PROJECT:
Riverside NW Apache Dr and NW Apache Ct
City Street Address/Intersection
7. Who owns the lands upon which the project will take place?:
City of Riverside
Page 1 of 12
8. At this time, does the applicant have the legal authority(right-of-way, easement,
property ownership, etc.)to complete the project?
®Yes ❑ No
If no, please explain how you will obtain legal authority:
9. SIGNATURE OF RESPONSIBLE AGENT
"I hereby certify that the information contained in this application is true and correct to the best of
my knowledge. I understand that this application will be rated on the basis of the information
submitted and that the submission of incorrect data can result in this application being withdrawn
from consideration for funding. If the organization I represent is awarded a grant,we hereby agree
to use t e funds for the purposes stated and abide by all terms and conditions"
03-03-2020
Signature Date
Mayor/City of Riverside
Title/Organization
Page 2 of 12
Stormwater Grant Program
Using the space provided or additional sheets if necessary, describe the essential
components of your project. Describe the need for the project, and the proposed
improvement to the existing condition.
1. PROJECT DESCRIPTION: Describe your proposed project including
a detail sheet(s) or engineering plans if applicable. Include a statement identifying
the needs to be addressed by your project and how your project will satisfy those
needs. Identify the parties responsible for project completion.
The Indian Hills subdivision within the City of Riverside contains corrugated metal
pipe (CMP) for storm sewers which was installed in the 1950s and 1960s. The
CMP is rusting but still maintains its shape to allow for the installation of Cured
In Place Pipe (CIPP). CIPP is like rebuilding a pipe from the inside. A liner with an
outside layer of epoxy is carried inside the pipe and then expands to seal along the
interior of the older pipe, preventing deterioration and leaks.
CIPP is generally warranted to last 50 years. New studies have shown that CIPP
will last beyond its advertised 50 years. CIPP is also a less invasive alternative to
open cutting streets and lawns for replacement.
Attached is a map of the area that we would like to retrofit with CIPP. We will CIPP
line 500' of stormwater pipe along and under NW Apache Dr and NW Apache Ct. The
City of Riverside will be responsible for bidding this project and hiring a contractor
to complete this work.
Page 3 of 12
2. PROJECT SITE: Provide a map identifying the project location and
photographs of the proposed project site.
See attached map and photographs.
Page 4 of 12
3. TIMELINE: Describe the time frame in which you plan to implement and
complete your project.
July 2020: Bid Project
August 2020: Bid Award and Construction Start
September- October 2020: Project Complete
4. PARTNERSHIP INVOLVEMENT: Describe the partnerships
established between local government, private citizens,community organizations,
and/or homeowner associations to plan and complete the proposed project and the
role of each entity.
The City of Riverside will be entirely responsible for this project.
Page 5 of 12
5. INSURANCE: List the name, address and phone number of your
insurance carrier and the amount of your general public liability coverage. (upon
request, copies of insurance certificates may be required)
MOPERM
3425 Constitution Court
3rd floor
PO Box 7110
Jefferson City, MO 65102-7110
1-888-566-7376
Coverage Amounts:
$2,400,000 per Incident
$360,000 per person
6. MATCHING CONTRIBUTIONS:Identify the matching contributions for
the proposed project. Describe the contributions in terms of type,quantity and/or
value, and source.
The City of Riverside will provide all matching funds for this project. The funds
will be from the infrastructure maintenance budget.
Page 6 of 12
7. OPERATION AND MAINTENANCE: Identify the responsible agency
and source of funding that will support the maintenance of the project once it is
complete.
The City of Riverside is responsible for maintaining the stormwater system in
the City. We annually check all visible stormwater utility structures and clean
them as needed.
We budget annually in our infrastructure maintenance program to maintain
the stormwater system. This will be the source of funds used to maintain the
project once it is complete. By using CIPP, we have selected a very low
maintenance option that will require minimal future expenditures.
Page 7 of 12
Platte County Stormwater Grant Program
Definitions:
1. Project Expense Items: List all items necessary to complete the proposed project
including items to be purchased as well as donated. List all materials,labor,
equipment and professional services. Do not include or list items not required
for the proposed project. Do not include items from sponsors general budget not
associated with the proposed project.
2. Grant Money Request: The amount requested from the County for the purpose of
reimbursing project costs.
3. Dollar Value of Applicant Match: Sponsor contributions to the project.
a) Budgeted Money The amount of cash the sponsor is committing to the
project per item.
b) Donated Money: Donations of money directly related to the project from
individuals or entities other than the Primary Proiect sponsor.
c) Miscellaneous Donations : Monetary value related to the donation of labor,
materials, equipment, or any other donation other than cash. Estimates
should be reasonable and consistent with costs the sponsor would be
willing to pay if the item were not donated.
4. Total Cost: The entire cost of the project including grant request, matching
funds,and donations.
List All Project Grant Dollar Value of Applicant Match Total
Expense Items Money Budgeted Donated Misc. Cost
Requested Money Money Donations
1. CIPP Lining & Installation $25,000.00 $25,000.00
$50,000.00
2.
3.
4.
5.
6.
7.
8.
9.
10.
Totals $25,000.00 $25,000.00 $50,000.00
Page 8 of 12
D. CHECKOFF PAGE
SUBMISSION REQUIREMENTS
® 1. Complete the 2019 application form
® 2. Only ONE project per Application
® 3. Application is typewritten
® 4. Complete the Project Description section
® 5. Sign and date the application
® 6. Number ALL pages of the application and attachments
® 7. Include a Development Plan or Diagram with all new construction or renovation projects
® 8. Include a letter from the sponsoring organization's governing body(City Board of Alderman or
Trustees, Board of Directors, etc.) supporting the application and committing matching funds or
resources
® 9. Non-Profit Organization applicants MUST INCLUDE a letter from the State of Missouri
establishing non-profit organization status, or a letter from a political subdivision or local
government stating their willingness to sponsor the project.
® 10. Complete the Itemized Budget page including a bid from a contractor or an estimate from a
licensed engineer or Director of Public Works.
® 11. Include a map of the site and photographs.
® 12. Make 12 copies of your Grant Application.
® 13. Mail or hand deliver the Original and 12 copies (13 copies total)to:
Planning and Zoning Department
Attn: Hobie Crane
415 Third Street
Room 016
Platte City, MO 64079
Must be received by 5:00 p.m., March 13, 2020.
Page 9 of 12
'44
y f
i
<' �p
oc
el" r
Y
� W
e .
CIPP Lining - Stormwater Grant 1 0 .5 1 2
Area of Focus
NW Apache Dr & NW Apache Court
(500' of pipe lined in this area) N 125 0 62.5 125 250
SCALE 1" = 125' Page 10 of 12