Loading...
HomeMy WebLinkAboutR-2021-016 Approving Task Order Number 3 with McClure RESOLUTION NO. R-2021-016 A RESOLUTION APPROVING TASK ORDER NUMBER 3 WITH MCCLURE BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE, MISSOURI AS FOLLOWS: THAT the Riverside Board of Aldermen hereby approves Task Order Number 3 by and between the City of Riverside and McClure, in substantially the form attached hereto, and the Mayor is authorized to execute the Task Order Number 3 on behalf of the City; and FURTHER THAT the Mayor, the City Administrator and other appropriate City officials are hereby authorized to take any and all actions as may be deemed necessary or convenient to carry out and comply with the intent of this Resolution and to execute and deliver for and on behalf of the City all certificates, instruments, agreements and other documents, as may be necessary or convenient to perform all matters herein authorized, and FURTHER THAT this Resolution shall be in full force and effect from and after its passage and approval. ADOPTED AND PASSED this a" day of 2021. M or Kathleen L. Ro e AT EST: Robin Kincaid, Ci y Clerk I Task Order Number 3 For Engineering Services This Task Order is entered into as of the 2"d day of February, 2021 (the "Effective Date"), by and between McClure, an Iowa corporation having an office at 1700 Swift St, Suite 100, North Kansas City, Missouri 64116 ("McClure") and the City of Riverside, Missouri, a Missouri municipal corporation (the"City"). WHEREAS, the City has engaged McClure to provide engineering services pursuant to the Agreement for Engineering Services dated October 6, 2020 pursuant to which the City may task McClure to provide additional professional engineering services on a project-specific basis by acknowledging a separate Task Order. NOW, THEREFORE, in consideration of the promises and mutual covenants between the parties and for other good and valuable consideration the receipt of which is acknowledged by the parties,they agree as follows: 1. Incorporation of Base Agreement. This Task Order is subject to all terms and conditions contained in the Agreement for Engineering Services dated October 6, 2020, that are not inconsistent with the specific terms contained herein, and the Agreement for Engineering Services dated October 6, 2020, between the parties is incorporated herein as if set forth in full by this reference. 2. Scope of Services. The Scope of Services pursuant to this Task Order are as contained in Exhibit A. 3. Term. McClure shall begin work pursuant to this Task Order No. 3 upon its Effective Date and shall continue until the Structural Base and Footing for the Recycle Art Sculpture ("Project") is completed as evidenced by final acceptance of the Project by the City. 4. Compensation. Unless compensation is set forth in this Task Order, compensation shall be as provided in the Agreement for Engineering Services dated October 6, 2020, between the parties. 5. Project Schedule. See project schedule in Exhibit A. 1 IN WITNESS WHEREOF, the McClure and the City have executed this Agreement as of the Effective Date. MCCLURE: CITY OF RIVERSIDE, MISSOURI: A06Wx- By: By: ' Name: Matt Eblen Name: Kathleen L. Rose Title: Project Manager Title: Mayor Dated: January 25, 2021 Dated: o � ATTES Robin Kincaid, Lity Clerk By: Nam Brian Ko al Title: Administrator Dated: '�� k' � 2 Exhibit A to Task Order 3 Scope of Services for Structural Base and Footing for the Tremont Trafficway Sculpture PROJECT DESCRIPTION The City of Riverside desires a structural base and footing for the Tremont Trafficway& Argosy Parkway Round-About Sculpture. This project will consist of shovel ready details for construction. SCOPE OF SERVICES 1. Project Management–McClure will prepare monthly progress reports. 2.Design–McClure will perform the following tasks within this phase: Determining loads to baseplate & foundation, Foundation Design, Anchor bolt design, Detail drawings as needed for construction, Construction specifications included on the drawings, Review of shop drawings and answering contractor questions, Two (2)meetings at the City of Riverside (assumed meeting duration approximately 1 hr). 3. Project Schedule— 10 business days are needed to deliver final foundation construction documents after receipt of: • Final sculpture information from the artist • Final foundation configuration/aesthetics information from the City 4. Exclusions • Any work outside of the scope mentioned above 3 Exhibit B McClure Engineering Company PROJECT: Riverside On-Call Task Order3 PROJECT NO.: MEC 201553-030 LOCATION: Structural Base d Footing for Tremont Tran—ay&Argosy Parkway Round-About Sculpture DATE:1/1912020 Roadway Agreement for Engineering Services Assumptions TIME Admin Project ENO I PMI PM 11 ET 1 ETN TOTAL Expenses SUB-TOTAL Coordinator Task 80.00 90.00 110.00 170.00 195.00 85.00 125.00 HOURS (f) 1A7 Pro ect Man.ement Detailed in task order,assumed 1 month Bom N.T.P. 2 2 2A1 Design Detailed in task order 8 B 4 20 f 2,70 PROJECT TOTAL s 0 f 10 0 0 4 22 f 0080