HomeMy WebLinkAboutR-2021-022 Task Order Number 4 with McClure RESOLUTION NO. R-2021-022
A RESOLUTION APPROVING TASK ORDER NUMBER 4 WITH MCCLURE
BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE,
MISSOURI AS FOLLOWS:
THAT the Riverside Board of Aldermen hereby approves Task Order Number 4 by and
between the City of Riverside and McClure, in substantially the form attached hereto, and the
Mayor is authorized to execute the Task Order Number 4 on behalf of the City, and
FURTHER THAT the Mayor, the City Administrator and other appropriate City officials
are hereby authorized to take any and all actions as may be deemed necessary or convenient
to carry out and comply with the intent of this Resolution and to execute and deliver for and on
behalf of the City all certificates, instruments, agreements and other documents, as may be
necessary or convenient to perform all matters herein authorized-, and
FURTHER THAT this Resolution shall be in full force and effect from and after its
passage and approval.
ADOPTED AND PASSED thisN� day of 2021.
, i
Ma or Kathleen L. Rose
ATTEST.,..
Robin Kincaid, City Clerk
1
Task Order Number 4
For Engineering Services
This Task Order is entered into as of the March 2, 2021 (the "Effective Date"), by and
between McClure, an Iowa corporation having an office at 1700 Swift St, Suite 100, North
Kansas City, Missouri 64116 ("McClure") and the City of Riverside, Missouri, a Missouri
municipal corporation(the"City").
WHEREAS, the City has engaged McClure to provide engineering services pursuant to
the Agreement for Engineering Services dated October 6, 2020 pursuant to which the City may
task McClure to provide additional professional engineering services on a project-specific basis
by acknowledging a separate Task Order.
NOW, THEREFORE, in consideration of the promises and mutual covenants between the
parties and for other good and valuable consideration the receipt of which is acknowledged by
the parties,they agree as follows:
1. Incorporation of Base Agreement. This Task Order is subject to all terms and conditions
contained in the Agreement for Engineering Services dated October 6, 2020, that are not
inconsistent with the specific terms contained herein, and the Agreement for Engineering
Services dated October 6. 2020, between the parties is incorporated herein as if set forth in
full by this reference.
2. Scope of Services. The Scope of Services pursuant to this Task Order are as contained in
Exhibit A.
3. Term. McClure shall begin work pursuant to this Task Order No. 4 upon its Effective Date
and shall continue until the Vivion Rd Trail Segment 1 [TAP-3454(401)] - 222-072
("Project") is completed as evidenced by final acceptance of the Project by the City.
4. Compensation. Unless compensation is set forth in this Task Order, compensation shall
be as provided in the Agreement for Engineering Services dated October 6, 2020, between the
parties.
5. Project Schedule. See project schedule in Exhibit A.
1
IN VMNESS WAEREOF, the McClure and the City have executed this Agreement as of the
Effective Date.
MCCLURE: CITY OF RIVERSIDE,MISSOURI:
By: �s�� By:
Name: At LI„cw l x+11• Name:Kathleen L.Rose
Title: y mg- %.,yjs A- Title:Mayor
Dated 2-2 S--21 Dated: ALA c a, J�
ATTEST: ,
Robin Kincaid,City Clerk
By:
N :Brian K
Title: ity Administrator
Dated:
2
Exhibit A to Task Order 4
Scope of Services for
Vivion Rd Trail Segment 1 [TAP-3454(401)] -220-072
PROJECT DESCRIPTION
The City of Riverside desires to connect the Vivion Road Trail from the current terminus at the
Interurban Trail to Mulberry Drive in Kansas City, MO. This initial task is to study the various
options for this trail route and prepare cost estimates for Riverside to consider. The trail is
assumed to be a 10 foot wide concrete trail.
SCOPE OF SERVICES
1. Study the followinst trail route options and provide cost estimates for each option:
A. From the intersection of the Vivion Rd Trail with the Interurban Trail through
Riverside property, crossing over the Line Creek tributary and staying south of the Line
Creek tributary until reaching the Briarcliff West Community. From there, crossing the
Line Creek tributary again and the traveling north to the Vivion Rd right-of-way. From
there staying within Vivion Rd right-of-way until terminating on the east side of
Mulberry Drive. See attached Exhibit C.
B. From the intersection of the Vivion Rd Trail with the Interurban Trail, following the
Interurban Trail northeast to the St. Joe Blvd. right-of-way. Staying within the St Joe
Blvd. right-of-way until the Vivion Rd. right-of-way. From there staying within Vivion
Rd right-of-way until terminating on the east side of Mulberry Drive. See attached
Exhibit D.
2.Provide Cost Estimates—Cost estimates to be provided in excel format with anticipated
quantities and labor for all construction costs. Include as separate line items anticipated costs for
any necessary engineering services including, but not limited to: site survey, engineering services
(project management, hydrologic& hydraulic analysis, site drainage, environmental permitting,
plans, specifications, estimate, construction administration, meetings, etc.)and geotechnical
investigation.
3.Proiect Schedule
• Complete all cost estimates by March 10, 2021.
3
Exhibit B
McClure Engineering Company
PROJECT: Riverside On-Call Task Order_Vivion Trail
PROJECT NO.: MEC 201553
LOCATION: Line Creek Trail Bridge and Alignment
DATE:2/24/2021
Roadway Agreement for Engineering Services TIME
Admin Project ENG 1 PMI PM If ETI ET III TOTAL Expenses SUB-TOTAL
Coordinator
Task 80.00 90.00 110.00 170.00 195.00 85.00 125.00 HOURS ($)
1.01 Project Management 11 E 170
2.01 Site Survey $
3.01 Hydrologic and Hydraulic H&H Analysis $
4.01 Site Drainage $
5.01 Geotechnical Investigation $
6.01 Environmental Permitting $ -
7.01 Plans,Specifications,and Estimate 8 $ 1,560
8.01 Construction Administration and Construction Services $
9.01 Meetings/Conference Calls 2 $ 390
PROJECT TOTAL 1 1 1 0 0 10 0 0 1 0 $ 2,120
•. )� (ems � s fi - f�'' +
-�" e'� �, 'M'' }, . 'r .t' •t a � iY_ jam. :
IM
AAA
w ,
Al:�Vivion Rd
„y
w1 1 f
+k r ; C:.
Trail �.
Proposed Vivion Rd Trail 1 0 .5 1 2
N 250 0 125 250 500
SCALE 1" = 250'
4 -r� i � ' a+t'sa"" y.-r . �;i � -D' ' f7^s�"J � .� 1� /I�C�^ 1. �!v' •� ,'�'°C� I v
14
jIL
4154
° r
.+tii`.'f �Y j ,�' 1• i 1.;' 1 t"'4.�'r /� ..F t •.
• �� " " s .y � :7 t y �yr �� 'ri'-" !#e'�ti a�0�� �- '' � �N t' - ai 'AA
on
A ��;� ��f ,��.- a� K •� 5 �.'p,'•"+� ���
- 1c; �p p. J Fye � 7.+}4, "FI•�'P � � i r�• ��e Ma �,�� � ��LL y Ar
. a W 4 M rr 1j it;
Proposed Vivion Rd Trail (alt route along Vivon & St. Joe) 1 0 .5 1 2
N 250 0 125 250 500
SCALE 1" = 250'