HomeMy WebLinkAbout2008-01 - CIP 2009-2013Resolution No. 2008-O1
Resolution No. 2008-O1
RESOLUTION ADOPTING A CAPITAL IMPROVEMENT PLAN FOR 2009-2013 FOR
THE CITY OF RIVERSIDE, MISSOURI FOR FUTURE PLANNING PURPOSE.
WHEREAS, The City of Riverside has studied and reviewed future public improvement projects for
the City; and
WHEREAS, the City has compiled these future projects into a Capital Improvement Plan for future
planning processes for 2009-2013; and
WHEREAS, the City Staff has presented the 2009-2013 Capital Improvement Plan and the Board of
Aldermen have reviewed, examined, and deemed recommendations appropriate of the Plan.
NOW, THEREFORE, BE IT RESOLVED, by the Board of Aldermen of Riverside, Missouri, as
follows:
Section 1. That the Board of Aldermen hereby finds and determines that the 2009-2013 Capital
Improvement Plan is for planning purposes for the City.
Section 2. That the document has been reviewed by the Board of Aldermen and the Board of
Aldermen deem it as an appropriate document for planning purposes.
Section 3. That this Resolution shall take effect immediately upon this adoption by the Board
of Aldermen of the City of Riverside, Missouri.
Passed this ~~ ~ day of January 2008.
A ES"f: ~
~i ~ N ~ ~ lC-^a
C' y Clerk
Mayor Kathleen L. Rose
2009-2013
Capital Improvement
Plan
City of Riverside, Missouri
City of Riverside
2009-2013 Capital Improvement Plan
Table of Contents
Board & Committee Membership ..................... ................................................................. 2
Goal & Objectives ............................................ .................................................................. 3
Financial Assumptions ..................................... .................................................................. 4
Revenue Assumptions .................................. .................................................................. 4
Expenditure Assumptions ............................ .................................................................. 5
Projects Budgeted in Current Fiscal Year ......... ................................................................. 5
Summary of Projects ........................................ .................................................................. 6
Fund Balance Projection .................................. .................................................................. 7
5 Year Outlook ................................................. .................................................................. 8
Streets and Bridges .......................................... .................................................................. 9
Infrastructure Maintenance .............................. ................................................................ 11
Community Development Projects .................. ................................................................ 12
Public Facilities ................................................ ................................................................ 13
Park Projects .................................................... ................................................................ 14
Major Equipment ............................................................................................................. 15
Horizons ........................................................................................................................... 16
City of Riverside
Board & Committee Membership
Bernard Bruns, Alderman
Ward II
David Hurt, Alderman
Ward III
Board of Aldermen
Kathleen Rose, Mayor
Pamela Darata, Alderman
Ward III
Mark Salyer, Alderman
Ward II
Mike Fuller, Alderman
Ward I
Ron Super, Alderman
Ward 1
Jim Frakes
Norma Parrot
Mike Fuller, Alderman
Barbara Snyder, Chairman
Ray Uhl
Raye Sanders
Kathleen Rose, Mayor
Park Board
Ron Carlson
Julie Rule
Planning Commission
Harold Snoderley
Al Bowman
Cheryl Melton
Mark Salyer, Alderman
Board of Zoning Adjustment
Marvin Pool Gale Perkins
Dean Lefstad Marvin Layton, alternate
Kathleen Rose, Chairman
June Flaws
Pride & Progress Board
Jean Grogan, Treasurer
Catherine Mousel
Kathleen Rose, Mayor
Aaron Locke
Evelyn Poe
Stephen King
Jerry Hackenberg
Gloria Hickman, Vice
Chairman
2
City of Riverside
2009-2013 Capital Improvement Plan
Capital Improvement Program Goal & Objectives
The goal of Riverside's Capital Improvements Program (CIP) is to forecast future public
improvements and facilities in the City and to provide data concerning need, cost, timing,
funding sources, budget impacts and alternatives. The goal is pursued with the following
objectives.
1. Utilize the objectives of the Master Plan when reviewing and updating the CIP
program.
2. Integrate the CIP budget into the Operating Budget in order to provide a
comprehensive financial plan for accomplishing the goals of Riverside.
3. Execute the CIP budgetary process in a manner that will provide the Governing Body
with an opportunity to respond to community needs.
4. Ensure that all decisions and actions will assist in maintaining a healthy fund balance.
5. Leverage City resources against available federal, state and county funds in such a
manner that the present and future citizens of Riverside will be provided with the
highest level of services and facilities without adverse financial impacts in the future.
3
.. ~ .. , ,.
City of Riverside
2009-2013 Capital Improvement Plan
Financial Assumptions Used in Capital Plan Development
Revenue Assumptions
I. Missouri Gaming Revenue is projected to increase by approximately 2.5% each
year. Gaming Commission is generated by a $1 admission tax and a 2% gross
receipts gaming tax from the Argosy Casino located in Riverside.
Gaming Revenue
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0
1.0
2. Real Estate Income, which is based on gross receipts at the Argosy Casino, is
projected to remain level. With the opening of the Hotel at the Argosy, gross
receipts have increased. However, the % the City captures in lease revenue has
decreased.
3. Sales and Use Tax receipts, which are generated from a 1% levy, are projected to
increase by 1 % per year.
4. Revenues from Fees, Fines, Permits and Licenses are estimated to increase by 1
each year.
5. Investment Income is projected to remain stable.
4
2007 2006 2005 2004 2003 2002
City of Riverside
2009-2013 Capital Improvement Plan
Expenditure Assumptions
1. Operating expenditures including capital outlay is forecasted to grow 4% per year.
2. Capital Improvement Project estimates are based on the actual contract when
possible. Otherwise, estimates are based upon engineer's estimates, historical
data, and reasonable assessments.
Projects Budgeted in Current Fiscal fear
West Platte Bridge
Northwood Road Phase 1
Park Hill South Gate
Vivion Road East
I-635 Interchange
L-385 Construction
Infrastructure Maintenance
Streetscape/Landscape Program
2007-08 Community Development
Animal Shelter
City Hall Renovations
Graffiti Removal
EH Young Restrooms
Children's Water Feature
Park/Trail Improvement Program
Park Teclulology
GIS System
Wayside Horns
Outside Warning Siren
Horizons
Total
$ 2,000,000
350,000
5,000
150,000
2,000,000
100,000
2,000,000
650,000
3,000,000
150,000
25,000
50,000
150,000
35,000
400,000
200,000
40,000
300,000
16,000
28.400,000
$40.021.000
5
City of Riverside
2009-2013 Capital Improvement Plan
Summary of Projects Included in the 2009-2013 Capital Improvement Plan
Streets and Bridges
Infrastructure
Maintenance
Community
Development Projects
Public Facilities
Park Projects
Major Equipment
Subtotal
Horizons
Total
2008-09 2009-10 2010-11 2011-12 2012-13
5,145,000 6,000,000 4,500,000 3,000,000 500,000
2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
3,700,000 6,000,000 2,000,000 2,000,000 2,000,000
700,000 700,000 200,000 200,000 2,200,000
580,000 1,010,000 500,000 2,000,000 2,000,000
40,000 40,000 - - -
12,165,000 15,750,000 9,200,000 9,200,000 8,700,000
10,500,000 - - - -
22,665,000 15,750,000 9,200,000 9,200,000 8,700,000
7,000,000 ~-
6,000,000
5,000,000 j-
4,000,000 ~
3,000,000 j~--
2,000,000 - - --
1,000,000
0
Streets and Infrastructure Conurnuiity Public Facilities Park Projects Major
Bridges Maintenance Devebpment Equq~ment
Projects
^ 2008-09 ^ 2009-10 ^ 2010-I1 ^ 2011-12 O 2012-13
6
City of Riverside
2009-2013 Capital Improvement Plan
Fund Balance Projection
While addressing infrastructure and capital improvements needs is a priority to the City,
the Board of Aldermen remains committed to maintaining a healthy fund balance.
During the 5 year plan, fund balance is projected at a level to fund 4 years of operating
expenditures ($24 million) or above.
In fiscal year 2007, the City issued $40,265,000 in Tax Increment Financing Bonds to
finance the Riverside Horizons Infrastructure. The spending down of the proceeds is
reflected in the decrease in fund balance from 2008 to 2009.
50,000,000 l _ ------ _- _______ ___. _ __---_--..- _ __ __ -.
45,000,000 --
40,000,000
35,000,000 ~ -
30,000,000 -~
25,000,000 - -
20,000,000 - - -
15,000,000 ~
10,000,000 - ~,
5,000,000 --
I
2008 2009 2010 2011 2012 2013
7
City of Riverside
2009-2013 Capital Improvement Plan
5 Year Outlook
2007-08 2008-09 2009-]0 2010-11 2011-12 2012-13
All Funds All Funds All Funds .411 Funds All Funds All Funds
Revenue
Permits & Licenses
Fees Fines & Forfeitures
Taxes
Investment Income
Miscellaneous
Subtotal
Assigned Income:
Road District
Park Hill Officer Reimbursement
Annex Lcasc
Real Estate Income
TIF/NID Revenue Com Dev Fund
Reimb. From Other Governments
Missouri Gaming Commission
7btal Assigned Income
Total Revenue
Expenditures
Administration
Municipal Court
Public Safety
Communications
Fire
Public Works
Building/Codes
City Annex
Parks
Community Center
Pool
Planning & Econ. Development
Neighborhood Services Fund
Future Expenditure for Cap Equip.
Total Operating & Capital
Equipment 6xpcnditures
281,000 282,010 283,030 284,060 285,101 106,152
230,200 232,502 234,827 237,175 239,547 241,943
1,965,000 1,984,650 2,004,497 2,024,541 2,044,787 2,065,235
2,075,000 1,975,000 I ,975,000 I ,975,000 1,975,000 1,975,000
5,000 5,000 5,000 5,000 5,000 5,000
4,556,200 4,479,162 4,502,354 4,525,777 4,549,435 4,393,329
5,000 5,000 5,000 5,000 5,000 5,000
14,000 14, 000 14, 000 14, 000 14,000 14, 000
8,400 8,400 8,400 8,400 8,400 8,400
4,730,000 4,730,000 4,730,000 4,730,000 4,730,000 4,730,000
2,590,000 2,667,888 2,818,690 3,024,103 3,212,705 3;293,154
- 3,000,000 1,000,000 - - 1,125,000
8,906.225 9.128,881 9,357,103 9,591,030 9,830,806 IQ,076,576
] 6,253,625 19,554,169 17,933,192 17,372,533 17,800,911 19,252,130
20,809,825 24,033,331 22,435,546 21,898,3]0 22,350,346 23,645,460
1,620,138 1,551,876 ],613,951 1,678,509 1,745,649 1,815,475
165,590 170,653 177,479 184,578 191,962 199,640
2,392,295 2,199,504 2,287,485 2,378,984 2,474,143 2,573,109
416,86! 369,056 383,818 399,170 415,137 431,743
500,875 518,674 539,421 56Q,998 SR3,437 606,775
723,846 700,332 728,345 757,479 787,778 819,290
139,013 143,949 149,707 ]55,696 161,923 168,400
26,500 27,560 28,662 29,809 31.001 32,241
79,160 82,326 85,619 89,044 92,606 96,310
603,676 626,887 651,962 678,041 705,162 733,369
73,700 76,648 79,714 82,902 86,219 89,667
243,049 247,571 257,474 267,773 278,484 289,623
225,000 225,000 225,000 225,000 225,000 225,000
750,000 750,000 750,000 750,000 750,000
7,209,702 7,690,036 7,958,637 8,237,983 8,528,502 8,R30,(,42
"f IF Bond Dcbt Service 1,904,000 1,910,063 1,937,563 1,950,863 1,976,413 1,986,562
TIF Revenue Payment ofLDS - - - 257,284 882,462 943,785
New Debt Sertice 2,750,000 2;747,000 2,747,000 2,747,000 2,747,000 2,747,000
Levee Assessment 730,000 730,000 730,000 644,300 436,000 415,000
Total Levee Fund 5,384,000 5,387,063 5,414,563 5,599,447 6,041,875 6,092,347
TMaI Expenditures 12,593,702 13,077,099 13,373,200 13,837,430 14,570,378 14,922,990
Current Revenues Available for
Capital Projects 8,216,123 10,956,232 9,062,346 8,060,880 7,779,969 8,722,470
Estimated Capital Project Expenditures 40,021,000 22,565,000 15,650,000 9,600,000 9,100,000 8,600,000
Change in Fund Balance (31,804,877) (11,608,768) (6,587,654) (1,539,120) (1,320,031) 122,470
Beginning Fund Balance 76,700,953 44,896,076 33,287,307 26,699,653 2>,16Q,533 23,840,502
Ending Fund Balance 44,896,076 33,287,307 26,699,653 25,160,533 23,840,502 23,962,972
g
City of Riverside
2009-2013 Capital Improvement Plan
Streets and Bridges
West Platte Bridge Project
Replacement of former West Platte Bridge which was taken out during Levee Design 2007-08 30,000
construction. Goal of project is to gain access into Levee protected areas and Coast. 2007-08 1,690,000
serve as a second means of ingress/egress. Coast. 2008-09 2,310,000
Note: Prior Year Expenditures totaling $264,000 are not included in totals. Prof Fees 2007-08 280,000
Total 4,310,000
Vivion Road West
Design and reconstruct Vivion Road west of QuikTrip to dead-end, including Design 2008-09 70,000
raising Vivion Road in elevation. Coast. 2008-09 1,500,000
Prof Fees 2008-09 100,000
Total 1,670,000
Northwood Road Phase I
Curb, gutter and asphalt work to approximately 1,800 lineal feet of street from Coast. 2007-08 300,000
north of PHHS entrance to the north. This project will only occur if annexation Prof Fees 2007-08 50,000
Design of project will paid for by Barth/Pursell,
is approved Total 350,000
.
Northwood Road Phasc II
From End of Phase I to 52nd Street (approximately 4500 linear feet). Design 2008-09 365,000
Two lane section with 3 lanes where feasible. Coast. 2008-09 100,000
Prof Fees 2008-09 250,000
Total 7 15,000
Vivion Road East
Vivion Road from bridge at Line Creek to eastern City limits. Prof Fees 2007-08 150,000
$1,125,000 in MARL funding Design 2008-09 450,000
$1,000,000 in MODOT funding Coast. 2009-10 3,000,000
coast. 2010-11 2, 000,000
Total 5,600,000
Park Hill South High School Gate
Coast. 2007-08 5,000
Total 5,000
L-385 Construction
Scour Hole Repair Coast. 2007-08 100,000
Note: Prior Year Expenditures totaling $255,000 are not included in totals. Total 100,000
9
_, .. , ~.
City of Riverside
2009-2013 Capital Improvement Plan
Streets and Bridges
I-635 Interchange
Construction of on & off ramps at I-635 and Horizons Parkway Const. 2007-08 2,000,000
Project is being administered by MODOT. City had previously committed Total 2,000,000
$7,500,000 ~to project. This amount represents the city's remaining share.
Note: Prior Year Expenditures totaling $5,632,054 are not included in totals.
9 Hwy Improvements -West of Mattox
The Horizons development combined with existing traffic wit] require Design 2012-13 500,000
upgrade of Highway 9 west of Mattox. The project will include reconfiguration Total 500,000
of Green Hills Road and Mattox Intersection.
2009-10 Annual Street & Bridge Project
This annual program allocates funds for a major street bridge project. Const. 2009-10 3,000,000
Locations for program will be determined future budget. Total 3,000,000
2010-11 Annual Street & Bridge Project
This annual program allocates funds for a major street/bridge project. Const. 2010-11 3,000,000
Locations for program will be determined future budget. Total 3,000,000
2011-12 Annual Street & Bridge Project
This annual program allocates funds for a major streeUbridge project. Const. 2011-12 3,000,000
Locations for program will be determined future budget. Total 3,000,000
Total For Streets & Bridges 24,250,000
Current Year Budget 4,605,000
2009-2013 CIP 19,645,000
10
City of Riverside
2009-2013 Capital Improvement Plan
Infrastructure Maintenance
2007-08 Annual Infrastructure Maintenance Program
This annual program includes mill and overlay projects, curb, gutter, sidewalk, Const. 2007-08 2,000,000
ADA accessible ramp improvements, sanitary sewer, and storm sewer Total 2,000,000
improvements.
Locations for program will be determined during 2007-08 operating budget.
2008-09 Annual Infrastructure Maintenance Program
This annual program includes mill and overlay projects, curb, gutter, sidewalk, Const. 2008-09 2,000,000
ADA accessible ramp improvements, sanitary sewer, and storni sewer Total 2,000,000
improvements.
Locations for program will be determined during 2008-09 operating budget.
2009-10 Annuallnfrastructure Maintenance Program
This annual program includes mill and overlay projects, curb, gutter, sidewalk, Const. 2009-10 2,000,000
ADA accessible ramp improvements, sanitary sewer, and storm sewer Total 2,000,000
improvements.
Locations for program will be determined during 2009-10 operating budget.
2010-11 Annual Infrastructure Maintenance Program
This annual program includes mill and overlay projects, curb, gutter, sidewalk, Const. 2010-11 2,000,000
ADA accessible ramp improvements, sanitary sewer, and storm sewer Total 2,000,000
improvements.
Locations for program will be determined during 2010-1 l operating budget.
2011-12 Annual Infrastructure Maintenance Program
This annual program includes mill and overlay projects, curb, gutter, sidewalk, Const. 2011-12 2,000,000
ADA accessible ratnp improvements, sanitary sewer, and storm sewer Total 2,000,000
improvements.
Locations for program will be determined during 2011-12 operating budget.
2012-13 Annual Infrastructure Maintenance Program
This annual program includes mill and overlay projects, curb, gutter, sidewalk, Const. 2012-13 2,000,000
ADA accessible ramp improvements, sanitary sewer, and storm sewer Total 2,000,000
improvements.
Locations for program will be dctermined during 2012-13 operating budget.
Total For 6rfrastructrrre Mnirrtenmue Progrmn
12,000,000
Current Year Budget 2,000,000
2009-2013 CIP 10,000,000
11
Citv of Riverside
2009-2013 Capital Improvement Plan
Community Development Projects
2007-08 Annual Streetscape/Landscape Program
Continuation of landscaping along City streets with both trees and plantings. Design 2007-08 100,000
Const. 2007-08 550,000
Total 650,000
2008-09 Annual Streetscape/Landscape Program
Continuation of landscaping along City streets with both trees and plantings. Const. 2008-09 700,000
Total 700,000
2009-10 Annual Streetscape/Landscape Program
Continuation of landscaping along City streets with both trees and plantings. Const. 2009-10 3,000,000
Total 3,000,000
2007-08 Community Development
Projects will be approved by Board of Aldermen to accomplish goals identified Const. 2007-08 3,000,000
in the Master Plan Total 3,000,000
.
2008-09 Community Development
Projects will be approved by Board of Aldermen to accomplish goals identified Const. 2008-09 3,000,000
in the Master Plan Total 3,000,000
.
2009-10 Community Development
Projects will be approved by Board of Aldermen to accomplish goals identified Const. 2009-10 3,000,000
in the Master Plan Total 3,000,000
.
2010-11 Community Development
Projects will be approved by Board of Aldermen to accomplish goals identified Const. 2010-11 2,000,000
in the Master Plan Total 2,000,000
.
2011-12 Community Development
Projects will be approved by Board of Aldermen to accomplish goals identified Const. 2011-12 2,000,000
in the Master Plan. Total 2,000,000
2012-13 Community Development
Projects will be approved by Board of Aldermen to accomplish goals identified Const. 2012-13 2,000,000
in the Master Plan Total 2,000,000
.
Total For Conununity Development 19,350,000
Current Year Budget 3,650,000
2009-201 3 CIP 15,700,000
12
City of Riverside
2009-2013 Capital Improvement Plan
Public Facilities
Animal Shelter
City Hall Renovations
Renovations to create additional office space.
Graffiti Removal
Provides funding for graffitti on the L-385 Levee.
City Annex Maintenance
Renovations to the City Annex Building
Const. 2007-08 150, 000
Total 150,000
Const. 2007-08 25,000
Total 25,000
Const. 2007-08 50,000
Total 50,000
Const. 2008-09 500,000
Const. 2009-10 500,000
Total 1,000,000
2008-09 Public Facility Upgrades
Renovations or upgrades to City buildings -including, City Hall, Public Safety, Const. 2008-09 200,000
Community Center, City Annex and Old Public Safety. Total 200,000
Projects will be identified during the 2008-09 Operating Budget.
2009-10 Public Facility Upgrades
Renovations or upgrades to City buildings -including, City Hall, Public Safety, Const. 2009-10 200,000
Community Center, City Annex and Old Public Safety. Total 200,000
Projects will be identified during the 2009-]0 Operating Budget.
2010-11 Public Facility Upgrades
Renovations or upgrades to City buildings -including, City Hall, Public Safety, Const. 2010-1 1 200,000
Community Center, City Annex and Old Public Safety. Total 200,000
Projects will be identified during the 2010-11 Operating Budget.
2011-12 Public Facility Upgrades
Renovations or upgrades to City buildings -including, City Hall, Public Safety, Const. 2011-12 200,000
Community Center, City Annex and Old Public Safety. Total 200,000
Projects will. be identified during the 2011-12 Operating Budget.
2012-13 Public Facility Upgrades
Renovations or upgrades to City buildings -including, City Hall, Public Safety, Const. 2012-13 200,000
Community Center, City Annex and Old Public Safety. Total 200,000
Projects will be identified during the 2012-13 Operating Budget.
PW Facility Const. 2012-13 2,000,000
Increasing Public Works functions and ultimate redevelopment of Total 2,000,000
industrial area will warrant new facility.
Tota[ For Public Facilities
4,450,000
Current Year Budget
2009-2013 CIP
225,000
4,225,000
13
City of Riverside
2009-2013 Capital Improvement Plan
Park Projects
E.H. Young Restrooms
Winterization of facilities -- $50,000 Const. 2007-08 150,000
Flood Damage Repair -- $100
000 Total 150,000
,
Line Creek Trail Connector
Trail connection E.H. Young Riverfront Park to Renner Brenner Park, which is Const. 2009-10 500,000
approximately 1 mile in length. Prof Fees 2009-10 10,000
Note: Prior Year Expenditures totaling $]3,000 are not included in totals. Total 510,000
Children's Water Feature
Water Feature at the Riverside Pool. Const. 2007-08 35,000
Total 35,000
2007-08 ParklTrail Improvement Annual Program
$200,000 for Briarcliff Trails, $146,000 for projects recommended by the Park Const. 2007-08 400,000
Board. Total 400,000
2008-09 Park/Trail Improvement Annual Program
Specific projects will be identified during the 2008-09 Const. 2008-09 400,000
operating budget. Total 400,000
2009-10 Park/Trail Improvement Annual Program
Specific projects will be identified during the 2009-10 Const. 2009-10 400,000
operating budget. Total 400,000
2010-11 Park/Trail Improvement Annual Program
Specific projects will be identified during the 2010-11 Const. 2010-11 400,000
operating budget. Total 400,000
2011-12 ParWTrail Improvement Annual Program
Specific projects will be identified during the 2011-12 Const. 2011-12 400,000
operating budget. Total 400,000
2012-13 Park/'I'rail Improvement Annual Program
Specific projects will be identified during the 2012-13 Const. 2012-13 400,000
operating budget. Total 400,000
Community Center Flooring
Addition of recreation flooring to Community Center. Const. 2008-09 80,000
Total 80,000
Horizons Soccer Fields
Recreation complex located south of I-635 Const. 2011-12 1,500,000
Const. 2012-13 1, 500,000
Total 3,000,000
Total For Park Projects 2,695,000
Current Year Budget 585,000
14 2008-2012 CIP 2,110,000
City of Riverside
2009-2013 Capital Improvement Plan
Major Equipment
City Park Technology
Provide Cameras in the Parks
GIS System
GIS Master Plan proposal to be finalized by Board of Aldermen
and staff in December
Wayside Horns
CFS scheduling diagnostic review with BNSF Railroad for January 2008.
Outside Warning Siren
Relocate siren from Old Public Safety to Water Tower; New Siren
in 52nd & Greenhills in cooperation with Platte County
To/al For Major Egaipment
15
Const. 2007-08 200,000
Total 200,000
Const. 2007-08 40,000
Const. 2008-09 40,000
Const. 2009-10 40,000
Total 120,000
Const. 2007-08 300,000
Total 300,000
Const. 2007-08 16,000
Total 16,000
636,000
Current Year Budget 556,000
2008-2012 CIP 80,000
..,
City of Riverside
2009-2013 Capital Improvement Plan
Horizons
Horizons Parkway
Four lane north-south access street from the I-635 Interchange to 9 Highway.
Const.
2007-08
13,000,000
utility
stormwater
ad tracks
il
h Prof Fees 2007-08 500,000
,
,
ro
e ra
The project includes a bridge over t
uisition
rt
d Total 13,500,000
.
y acq
prope
improvements ,relocations an
Note: Prior Year Expenditures totaling $7,744,132.65 are not included in totals.
9 Highway Improvements
Project includes intersection improvements at 9 Highway and Northwood, new
Design
2008-09
500,000
intersection at 9 Highway and Horizons Parkway, acceleration, deceleration, Const. 2008-09 6,500,000
MODOT will contribute $3,000,000 for these improvements.
and turn lanes Prof Fees 2008-09 500,000
. Total 7,500,000
East/West Connections
Project includes construction of east-west connector roads with utility
Design
2007-08
1,000,000
improvements/relocations and property acquisition. Const. 2007-08 2,000,000
Const. 2008-09 2,000,000
Prof Fees 2007-08 500,000
Prof Fees 2008-09 500,000
Total 6,000,000
Sanitary Forcemain & Litt Station
i
5
Design
2007-08
100,000
ce
to serv
Lift Station to be located at corner of Schoenbeck and I-63
Horizons Project, forcemain connection from new Lift Station to connect Const. 2007-08 4,390,000
into KCMG at Line Creek. Both projects being designed by Continental Const. 2008-09 500,000
Prof Fees 2007-08 10,000
Engineers.
Total 5,000,000
Water Connection
Connection of water facilities into MAWC system to provide water for
Design
2007-08
50,000
Horizons Project Const. 2007-08 340,000
Prof Fees 2007-08 10,000
Total 400,000
Wetlands
Corps of Engineers requirement for wetland delineation and mitigation of
Design
2007-08
50,000
area inside the L-385 Levee System. Necessary before development can Const. 2007-08 430,000
Prof Fees 2007-08 20,000
occur in the Horizions Project 000
500
Total ,
Professional Fees/Contingency
Const.
2007-08
3,000,000
Prof Fees 2007-08 3,000,000
Total 6,000,000
Total for Horizons Development
2007-08 28,400,000
2008-09 10,500,000 .
38,900,000
16