HomeMy WebLinkAboutR-2021-047 Task Order Number 5 with McClure RESOLUTION NO. R-2021-047 A RESOLUTION APPROVING TASK ORDER NUMBER 5 WITH MCCLURE BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE, MISSOURI AS FOLLOWS: THAT the Riverside Board of Aldermen hereby approves Task Order Number 5 by and between the City of Riverside and McClure, in substantially the form attached hereto, and the Mayor is authorized to execute the Task Order Number 5 on behalf of the City, and FURTHER THAT the Mayor, the City Administrator and other appropriate City officials are hereby authorized to take any and all actions as may be deemed necessary or convenient to carry out and comply with the intent of this Resolution and to execute and deliver for and on behalf of the City all certificates, instruments, agreements and other documents, as may be necessary or convenient to perform all matters herein authorized, and FURTHER THAT this Resolution shall be in full force and effect from and after its passage and approval. ADOPTED AND PASSED this / day of A 2021. A-W MAyor Kathleen L. Rose ATTEST Robin Kincaid,.Ci#y Clerk 1 IN WITNESS WHEREOF, the McClure and the City have executed this Agreement as of the Effective Date. MCCLURE: CITY OF RIVERSIDE,MISSOURI: By: A�cW& By: Name: Matt Eblen, P.E. Name: Kathleen L. Rose Title: Project Manager Title: Mayor Dated: May 27, 2021 Dated: ATTEST: Robin Kincaid, City Clerk By: Na : BrianLoral., NT ' Administrator Dated: C—A A 2 Task Order Number 5 For Engineering Services This Task Order is entered into as of the 1 st day of June, 2021 (the "Effective Date"), by and between McClure, an Iowa corporation having an office at 1700 Swift St, Suite 100, North Kansas City, Missouri 64116 ("McClure") and the City of Riverside, Missouri, a Missouri municipal corporation (the"City"). WHEREAS, the City has engaged McClure to provide engineering services pursuant to the Agreement for Engineering Services dated October 6, 2020 pursuant to which the City may task McClure to provide additional professional engineering services on a project-specific basis by acknowledging a separate Task Order. NOW, THEREFORE, in consideration of the promises and mutual covenants between the parties and for other good and valuable consideration the receipt of which is acknowledged by the parties, they agree as follows: 1. Incorporation of Base Agreement. This Task Order is subject to all terms and conditions contained in the Agreement for Engineering Services dated October 6, 2020, that are not inconsistent with the specific terms contained herein, and the Agreement for Engineering Services dated October 6, 2020, between the parties is incorporated herein as if set forth in full by this reference. 2. Scope of Services. The Scope of Services pursuant to this Task Order are as contained in Exhibit A. 3. Term. McClure shall begin work pursuant to this Task Order No. 4 upon its Effective Date and shall continue until the Riverway Boulevard Improvements- Survey ("Project") is completed as evidenced by final acceptance of the Project by the City. 4. Compensation. Unless compensation is set forth in this Task Order Exhibit B, compensation shall be as provided..in the Agreement for Engineering Services dated October 6, 2020, between the parties. 5. Project Schedule. See project schedule in Exhibit A. 1 Exhibit A Scope of Services Riverway Boulevard Improvements—Survey From Tullison Road to West Platte Road PROJECT DESCRIPTION The City of Riverside desires a survey to be conducted along Riverway Boulevard from Tullison Road to West Platte Road. This survey will be utilized for design of modifications to Riverway Boulevard in the future. SCOPE OF SERVICES Survey and Data Collection The Consultant shall perform field and office tasks required to collect topographic information deemed necessary to complete the Project. The City shall provide aerial photographic information and other available mapping of the Project area. The specific supplemental tasks to be performed include the following: Task 1.01 — Project Management McClure will prepare monthly progress reports to the City and coordinate with internal staff during the duration of the survey (45-60 days). Task 1 .02 — Project Control and Topographic Survey Survey Control—McClure will provide the following survey control for services under this Agreement: 1) Horizontal Control — Missouri State Plane Coordinate System (NAD 83 / Missouri West) 2) Vertical Control — NAVD 88 3) U.S. Survey Feet 4) Establish benchmarks on-site with descriptions and elevations to the nearest 0.01 foot so horizontal and vertical control can be established throughout the design and construction of the proposed project. Task 1.03 —Topographic Survey Topographic Survey— McClure will provide topographic surveys required for developing the design plans based on the attached survey schematic. Topographic survey is defined as providing contours at 0.5' intervals and includes surveying edge of pavement, edge of building (and adjacent grade), ditches (top, toe, and flowline), storm and sanitary sewer structures (rim elevation, flowlines, pipe size, and pipe type), embankments (top and toe), along Highway 9 and the levee, tree limits (individual trees are not necessary, but all slope related items are still required if they change the canopy), area under Highway 9 bridges (downslope, bridge columns, low chord, edge of pavement, ditch limits, riprap limits), stop log headwalls, signs, soil boring locations, water valves, hydrants, etc. and other visible features the Consultant determines to meet project objectives. Non-visible below grade structures will be shown from data provided by the City and utility providers. Task 1 .04 — Utility Survey Utility Survey—McClure will reach out to Missouri One-Call to identify owners of record, obtain existing utility mapping information, and request the buried utilities be marked in the field. Field survey marked utilities, incorporate into project base map, and document utility name and contact information on the utility legend. Excavating to expose buried utilities is not part of this agreement. Any private utility locates that are not included in the Missouri One-Call service will be shown as map location, if known. Task 1.05 — Right-of-Way Survey Perform right-of-way survey required for the development of the project. The right-of-way survey shall be in-depth legal surveys for which acquisition plats are to be developed. This task includes a thorough search of City, County, and State records to review all surveys of record pertaining to the survey corridor, including County Auditor's Subdivision Plats, original government surveys, all irregular land survey, and road establishment records. Copies of such records are to be included in the project file for future reference. This task includes obtaining sufficient field data to locate or establish property lines affected by the project to enable the preparation of the improvement plans. This includes location section corners, property pins, and visible lines of occupation such as fences, field divisions, or any other lines, indicating possession. A diligent effort must be made to recover existing land corner monuments necessary to describe the right-of-way along the project corridor. The task includes incorporation of property lines, right-of-way lines, and ownership of properties affected by the project into the base mapping for the project. The base mapping will identify the owners and approximate boundaries of all appropriate parcels within the survey limits. Deliverable—Prodect Base Map Incorporate field surveys and utility information into on electronic base map to be used for the design of the project. Incorporate topographic survey, utility survey, property lines, right-of-way lines, and property ownership for parcels located within the project limits into the base map. I. Timeline The following is the estimated time frame for this project. All calendar days are estimated, subject to acceptance day with the Owner. If notice to proceed is given at a later date, time of completion may need to be extended accordingly. Generally, the schedule for the Project is described as follows: A. General Schedule a. Notice to Proceed—received from City by June 4, 2021 b. Topographic Survey and Mapping—provide Final Deliverable to City by August 6, 2021 B. Schedule Delays The Consultant shall not be responsible for delays in the schedule that are beyond the Consultant's control. II. Additional Services Not Included in this Agreement The following services are excluded from the basic services, but may be performed by the Consultant upon written amendment to this agreement. 1. Legal Description or Exhibits for easement or right-of-way acquisition. 2. Right-of-Way or Easement Staking. 3. Boundary retracement of existing lots to set missing monuments. 4. Other services not specifically outlined in this Agreement. III. City's Responsibilities The City shall provide the following: 1. Provide title reports for all adjacent properties within the project area. 2. Arrange for safe access to and make all provisions for McClure to enter upon public and private property as required to perform services under this agreement. 3. Provide a designated authorized project representative. SURVEY NEEDED FOR RIVERWAY BLVD MODIFICATIONS ITEMS NEEDED: 2 ` 4# 1.TOPO WITHIN SHADED AREAS 21 * 2.PROPERTY CORNERS(AS SHOWN) 3.PLAT INFORMATION TIED TO PROPERTY CORNERS 4.TITLE WORK FOR ALL ADJACENT PROPERTIES provided by City): ` ----Lots 10, 11,19&26 of Renner Plaza No.5 -_ ----Lots 1,3-6&28-29 of Riverside Business Park(including parcels 008-006.000, 008-009.000,008-009.001,008-010-000, ►s' �' �� '" ' ! �+ 008-011.000,008-013.000 J4 Cief 14% � � —The following parcels within the Red-X ' i:A.l. . � � ���� Plaza:000-004.000,000-003.005, ` 000-003.001,000-003.002,000-003.004, i! _ • t �� i r r r r r a II T� 000-003.007 e � . `'' 1 11y '�` +~ � ' f• ---Parcel 007-007.000 "� �'��; v TOPO IS DEFINED AS: A.GRADE SHOTS TO PROVIDE a 1 • ' ' ' II ,�,, � � �� i .� ' CONTOURS AT 0.5'INTERVALS(The area is '' - fl';1r r c j - �,i, very Flat) 1 E'r • .,,7.,, I B.VISIBLE FEATURES r ` e + ' ----Edge of pavement,Edge of building(and ! - r adjacent grade),ditches(top,toe&flowline), • r ,_ storm structures(rim elevation,Flowlines,pipe • 1 i�c' 1` I •- + size&pipe type),embankments(top&toe) along Highway 9 and the levee,tree limits (individual trees are not necessary...but all slope-related items are still required if they change within the canopy),area under Highway 9 bidges(downslope,bridge columns,low chord,edge of pavement,ditch limits,riprap limits),stop log headwalls dam .■ a 13► " �1 ���' _'' �rr C.UTILITIES ---Location of Water,Sewer,Storm,Power, . FJ (►� �, ; Fiber&Gas lines within all shaded areas as �♦�1� i!„ �..� - -_ required from Missouri One-Call(Public ROW) ---Power lines need to show poles and horizontal location of all lines running to&from each of the poles LEGEND: Topo area on Public Right-of-Way Topo area on Private Property PHOTO FROM PLATTE COUNTY,MISSOURI'BEACON'WEB SITE Property Corners to be Located Exhibit B for Task Order Number 5 Compensation(Hourly Not to Exceed) Fee and Hour Summary by Task : NO. TASK HOURS FEE 1.01 Project Management 10 $1,700.00 2.01 Horizontal & 16 $3,200.00 Vertical Control 3.01 To o Survey 160 $24,800.00 4.01 Utility Survey 24 $4,080.00 5.01 Right-of-Way 32 $4,960.00 Survey Reference attached spreadsheet. FEE The scope of services shall be completed under this authorization for an hourly-not-to-exceed fee of$38,220.00. RIVERSIDE shall compensate McClure for these services, based upon hourly rates. 4 Exhibit B McClure Engineering Company PROJECT: Riverside On-Call Task Order 5 LOCATION: Rivemay Boulevard improvements-Survey DATE:5/27/2021 Roadway Agreement for Engineering Services Assumptions TIME Admin Protest ENO PM PLS Survey Survey TOTAL Expenses SUB-TOTAL Task or Codinator Crew Technicun 80.00 50.00 110.00 170.00 170.00 200.00_ 105.00 HOURS (f) 1.01 Prof t Man m eent Detailed M task order,assumed J months from N.T.P. 6 4 10 f 1,700 1A2 l Vertical Control Based on Surve Limits Schematic as noted in Exhibit B 16 16 f 3,200 1.03 Tapp Survey Based on Survey Limits Schematic as noted in Exhibit B s0 80 160 f 24,400 1.04 Utility survey Based on Survey Limits Schematic as noted in Exhibit B 16 6 24 f 4,040 1A6 Right-of-Way 5—y Based on Survey Limits Schemabc as noted in Exhibit B 16 16 12 f 4,880 PROJECT TOTAL o 0 0 6 4 128 i 104 242 f 20,220