THAT the Riverside Board of Aldermen hereby approves Task Order Number 5 by and
between the City of Riverside and McClure, in substantially the form attached hereto, and the
Mayor is authorized to execute the Task Order Number 5 on behalf of the City, and
FURTHER THAT the Mayor, the City Administrator and other appropriate City officials
are hereby authorized to take any and all actions as may be deemed necessary or convenient
to carry out and comply with the intent of this Resolution and to execute and deliver for and on
behalf of the City all certificates, instruments, agreements and other documents, as may be
necessary or convenient to perform all matters herein authorized, and
FURTHER THAT this Resolution shall be in full force and effect from and after its
passage and approval.
ADOPTED AND PASSED this / day of A 2021.
A-W
MAyor Kathleen L. Rose
ATTEST
Robin Kincaid,.Ci#y Clerk
1
IN WITNESS WHEREOF, the McClure and the City have executed this Agreement as of the
Effective Date.
MCCLURE: CITY OF RIVERSIDE,MISSOURI:
By: A�cW& By:
Name: Matt Eblen, P.E. Name: Kathleen L. Rose
Title: Project Manager Title: Mayor
Dated: May 27, 2021 Dated:
ATTEST:
Robin Kincaid, City Clerk
By:
Na : BrianLoral.,
NT
' Administrator
Dated: C—A A
2
Task Order Number 5
For Engineering Services
This Task Order is entered into as of the 1 st day of June, 2021 (the "Effective Date"), by
and between McClure, an Iowa corporation having an office at 1700 Swift St, Suite 100, North
Kansas City, Missouri 64116 ("McClure") and the City of Riverside, Missouri, a Missouri
municipal corporation (the"City").
WHEREAS, the City has engaged McClure to provide engineering services pursuant to
the Agreement for Engineering Services dated October 6, 2020 pursuant to which the City may
task McClure to provide additional professional engineering services on a project-specific basis
by acknowledging a separate Task Order.
NOW, THEREFORE, in consideration of the promises and mutual covenants between the
parties and for other good and valuable consideration the receipt of which is acknowledged by
the parties, they agree as follows:
1. Incorporation of Base Agreement. This Task Order is subject to all terms and conditions
contained in the Agreement for Engineering Services dated October 6, 2020, that are not
inconsistent with the specific terms contained herein, and the Agreement for Engineering
Services dated October 6, 2020, between the parties is incorporated herein as if set forth in full
by this reference.
2. Scope of Services. The Scope of Services pursuant to this Task Order are as contained in
Exhibit A.
3. Term. McClure shall begin work pursuant to this Task Order No. 4 upon its Effective
Date and shall continue until the Riverway Boulevard Improvements- Survey ("Project") is
completed as evidenced by final acceptance of the Project by the City.
4. Compensation. Unless compensation is set forth in this Task Order Exhibit B,
compensation shall be as provided..in the Agreement for Engineering Services dated October 6,
2020, between the parties.
5. Project Schedule. See project schedule in Exhibit A.
1
Exhibit A
Scope of Services
Riverway Boulevard Improvements—Survey
From Tullison Road to West Platte Road
PROJECT DESCRIPTION
The City of Riverside desires a survey to be conducted along Riverway Boulevard from Tullison
Road to West Platte Road. This survey will be utilized for design of modifications to Riverway
Boulevard in the future.
SCOPE OF SERVICES
Survey and Data Collection
The Consultant shall perform field and office tasks required to collect topographic information
deemed necessary to complete the Project. The City shall provide aerial photographic information
and other available mapping of the Project area. The specific supplemental tasks to be performed
include the following:
Task 1.01 — Project Management
McClure will prepare monthly progress reports to the City and coordinate with internal staff during
the duration of the survey (45-60 days).
Task 1 .02 — Project Control and Topographic Survey
Survey Control—McClure will provide the following survey control for services under this
Agreement:
1) Horizontal Control — Missouri State Plane Coordinate System (NAD 83 / Missouri West)
2) Vertical Control — NAVD 88
3) U.S. Survey Feet
4) Establish benchmarks on-site with descriptions and elevations to the nearest 0.01 foot so
horizontal and vertical control can be established throughout the design and construction
of the proposed project.
Task 1.03 —Topographic Survey
Topographic Survey— McClure will provide topographic surveys required for developing the
design plans based on the attached survey schematic. Topographic survey is defined as providing
contours at 0.5' intervals and includes surveying edge of pavement, edge of building (and
adjacent grade), ditches (top, toe, and flowline), storm and sanitary sewer structures (rim
elevation, flowlines, pipe size, and pipe type), embankments (top and toe), along Highway 9 and
the levee, tree limits (individual trees are not necessary, but all slope related items are still required
if they change the canopy), area under Highway 9 bridges (downslope, bridge columns, low
chord, edge of pavement, ditch limits, riprap limits), stop log headwalls, signs, soil boring
locations, water valves, hydrants, etc. and other visible features the Consultant determines to meet
project objectives. Non-visible below grade structures will be shown from data provided by the
City and utility providers.
Task 1 .04 — Utility Survey
Utility Survey—McClure will reach out to Missouri One-Call to identify owners of record, obtain
existing utility mapping information, and request the buried utilities be marked in the field. Field
survey marked utilities, incorporate into project base map, and document utility name and contact
information on the utility legend. Excavating to expose buried utilities is not part of this
agreement. Any private utility locates that are not included in the Missouri One-Call service will
be shown as map location, if known.
Task 1.05 — Right-of-Way Survey
Perform right-of-way survey required for the development of the project. The right-of-way survey
shall be in-depth legal surveys for which acquisition plats are to be developed.
This task includes a thorough search of City, County, and State records to review all surveys of
record pertaining to the survey corridor, including County Auditor's Subdivision Plats, original
government surveys, all irregular land survey, and road establishment records. Copies of such
records are to be included in the project file for future reference.
This task includes obtaining sufficient field data to locate or establish property lines affected by the
project to enable the preparation of the improvement plans. This includes location section
corners, property pins, and visible lines of occupation such as fences, field divisions, or any other
lines, indicating possession. A diligent effort must be made to recover existing land corner
monuments necessary to describe the right-of-way along the project corridor.
The task includes incorporation of property lines, right-of-way lines, and ownership of properties
affected by the project into the base mapping for the project. The base mapping will identify the
owners and approximate boundaries of all appropriate parcels within the survey limits.
Deliverable—Prodect Base Map
Incorporate field surveys and utility information into on electronic base map to be used for the design
of the project. Incorporate topographic survey, utility survey, property lines, right-of-way lines, and
property ownership for parcels located within the project limits into the base map.
I. Timeline
The following is the estimated time frame for this project. All calendar days are estimated, subject
to acceptance day with the Owner. If notice to proceed is given at a later date, time of
completion may need to be extended accordingly. Generally, the schedule for the Project is
described as follows:
A. General Schedule
a. Notice to Proceed—received from City by June 4, 2021
b. Topographic Survey and Mapping—provide Final Deliverable to City by August 6, 2021
B. Schedule Delays
The Consultant shall not be responsible for delays in the schedule that are beyond the
Consultant's control.
II. Additional Services Not Included in this Agreement
The following services are excluded from the basic services, but may be performed by the
Consultant upon written amendment to this agreement.
1. Legal Description or Exhibits for easement or right-of-way acquisition.
2. Right-of-Way or Easement Staking.
3. Boundary retracement of existing lots to set missing monuments.
4. Other services not specifically outlined in this Agreement.
III. City's Responsibilities
The City shall provide the following:
1. Provide title reports for all adjacent properties within the project area.
2. Arrange for safe access to and make all provisions for McClure to enter upon public and
private property as required to perform services under this agreement.
3. Provide a designated authorized project representative.
SURVEY NEEDED FOR RIVERWAY BLVD MODIFICATIONS ITEMS NEEDED:
2
` 4# 1.TOPO WITHIN SHADED AREAS
21 * 2.PROPERTY CORNERS(AS SHOWN)
3.PLAT INFORMATION TIED TO
PROPERTY CORNERS
4.TITLE WORK FOR ALL ADJACENT
PROPERTIES provided by City):
` ----Lots 10, 11,19&26 of Renner Plaza No.5
-_ ----Lots 1,3-6&28-29 of Riverside Business
Park(including parcels 008-006.000,
008-009.000,008-009.001,008-010-000,
►s' �' �� '" ' ! �+ 008-011.000,008-013.000
J4
Cief 14% � � —The following parcels within the Red-X
' i:A.l. . � � ���� Plaza:000-004.000,000-003.005,
` 000-003.001,000-003.002,000-003.004,
i! _ • t �� i r r r r r a II T� 000-003.007
e � . `'' 1 11y '�` +~ � ' f• ---Parcel 007-007.000
"� �'��; v TOPO IS DEFINED AS:
A.GRADE SHOTS TO PROVIDE
a 1
• ' ' ' II ,�,, � � �� i .� '
CONTOURS AT 0.5'INTERVALS(The area is
'' -
fl';1r r c j - �,i, very Flat)
1 E'r • .,,7.,, I B.VISIBLE FEATURES
r ` e + ' ----Edge of pavement,Edge of building(and
! - r adjacent grade),ditches(top,toe&flowline),
• r ,_ storm structures(rim elevation,Flowlines,pipe
•
1 i�c' 1` I •- + size&pipe type),embankments(top&toe)
along Highway 9 and the levee,tree limits
(individual trees are not necessary...but all
slope-related items are still required if they
change within the canopy),area under
Highway 9 bidges(downslope,bridge
columns,low chord,edge of pavement,ditch
limits,riprap limits),stop log headwalls
dam .■ a 13► " �1 ���' _'' �rr C.UTILITIES
---Location of Water,Sewer,Storm,Power,
. FJ (►� �, ; Fiber&Gas lines within all shaded areas as
�♦�1� i!„ �..� - -_ required from Missouri One-Call(Public ROW)
---Power lines need to show poles and
horizontal location of all lines running to&from
each of the poles
LEGEND:
Topo area on Public Right-of-Way
Topo area on Private Property
PHOTO FROM PLATTE COUNTY,MISSOURI'BEACON'WEB SITE Property Corners to be Located
Exhibit B for Task Order Number 5
Compensation(Hourly Not to Exceed)
Fee and Hour Summary by Task :
NO. TASK HOURS FEE
1.01 Project Management 10 $1,700.00
2.01 Horizontal & 16 $3,200.00
Vertical Control
3.01 To o Survey 160 $24,800.00
4.01 Utility Survey 24 $4,080.00
5.01 Right-of-Way 32 $4,960.00
Survey
Reference attached spreadsheet.
FEE
The scope of services shall be completed under this authorization for an hourly-not-to-exceed fee
of$38,220.00. RIVERSIDE shall compensate McClure for these services, based upon hourly
rates.
4
Exhibit B
McClure Engineering Company
PROJECT: Riverside On-Call Task Order 5
LOCATION: Rivemay Boulevard improvements-Survey
DATE:5/27/2021
Roadway Agreement for Engineering Services Assumptions TIME
Admin Protest ENO PM PLS Survey Survey TOTAL Expenses SUB-TOTAL
Task or
Codinator Crew Technicun
80.00 50.00 110.00 170.00 170.00 200.00_ 105.00 HOURS (f)
1.01 Prof t Man m
eent Detailed M task order,assumed J months from N.T.P. 6 4 10 f 1,700
1A2 l Vertical Control Based on Surve Limits Schematic as noted in Exhibit B 16 16 f 3,200
1.03 Tapp
Survey Based on Survey Limits Schematic as noted in Exhibit B s0 80 160 f 24,400
1.04 Utility survey Based on Survey Limits Schematic as noted in Exhibit B 16 6 24 f 4,040
1A6 Right-of-Way 5—y Based on Survey Limits Schemabc as noted in Exhibit B 16 16 12 f 4,880
PROJECT TOTAL o 0 0 6 4 128 i 104 242 f 20,220