HomeMy WebLinkAboutR-2022-117 CO 5 Crossland Construction Company, Inc. for Additions & Renovations Riverside Public SafetyRESOLUTION NO. R-2022-117
A RESOLUTION APPROVING CHANGE ORDER 5 TO THE AGREEMENT WITH
CROSSLAND CONSTRUCTION COMPANY, INC. FOR ADDITIONS &
RENOVATIONS RIVERSIDE PUBLIC SAFETY RESULTING IN A REVISED
CONTRACT AMOUNT OF $4,443,454.26 FOR SUCH PURPOSES
WHEREAS, the City of Riverside ("City") issued an Invitation to Bid for the Additions
& Renovations Riverside Public Safety (Project No. 537-086) ("Project') which was awarded to
Crossland Construction Company, Inc. ("Crossland") pursuant to Resolution R-2022-038; and
WHEREAS, the Board of Aldermen finds that it is in the best interest of the City to
approve Change Order 5 to the agreement with Crossland, resulting in a total revised contract
amount not to exceed $4,443,454.26.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF
THE CITY OF RIVERSIDE, MISSOURI, AS FOLLOWS:
THAT Change Order 5 to the Agreement between the City and Crossland, a copy of
which is attached hereto and incorporated herein, is approved and the Mayor is authorized to
execute the same on behalf of the City. The resulting revised total contract amount shall not
exceed $4,443,454.26.
FURTHER THAT the Mayor, City Administrator and all other required city officials
are authorized to take such other actions and/or execute and deliver for and on behalf of the City
all certificates, instruments, agreements and other documents as may be deemed necessary or
convenient to carry out and comply with the intent of this Resolution.
PASSED AND ADOPTED by the Board of Aldermen of the City of Riverside,
Missouri, the I8th day of October 2022.
ATCbSr:. I _ ..
RobM KincaiQ City Clerk
V111
s! AIA Document G701- - 2017
Change Order
PROJECT: (Name and address)
Addition; & Renovation
Riverside Public Safety
2990 NW Vision Rd
Riverside, MO 64150
OWNER: (Name and address)
City of Rive vide
2950 NW Vivian Read
CONTRACT INFORMATION:
Contract For: General Con;mu:tioo
Date: May 16, 2022
Notice to Proceed: July 11, 2022
ARCHITECT: (Name;Madd eta)
wSKF, Inc.
110 Armour Road
North Raman City, MO 64116
CHANGE ORDER INFORMATION:
Change Order Number: 005
Data: October 5, 20M
CONTRACTOR: (Name and address)
Crossland Construction Company, Im.
833 S. Fast Aveand,
Columbus, KS 66725
THE CONDUCT B CHANGED AS FOLLOWS:
(/mart a derailed dermiptlon ofthe change and, iftwhcable, aaach wre%rnrce specific exhibies. Ahe include agreed upon ad)asmmnn
atal6urable be executed Cameroonian Change Ornateness)
1. Per Potential Change Order 0007 from Crossland dated 8/192022 in response to Proposal Request 006, the cost to remove
the CIO light fixtures from the Lobby ceiling and keep existing fixtures.
S3,492.90 - Decreased Cast
2. Per Potential Change Order 0008 from Crossland dated 9/14202.2 in response to Proposal Request 007, the to repair vapor
barrier in the exterior walls and ceilings uncovered during demolition:
$4,947.60 - Increased Cost
3. Per Potential Change Order 0012 from Crossland dated 9/192022 in response to Proposal Request 0012, the cost to install
access panels in Rooms A131B and Al34:
S971.25 - Increased Cast
$2,425.95 - Total Increased Cost for Change Order No. Five,
The original Contract Sur wan I 4,404 000.00
The net change by previously sentenced Change Ordaa I 37028.31
The Contract Senn prior to this Change Order wan I 4,441,028.31
The Contact Sum will be increased by this Change Order in the amount of I 2,425.95
The cew Context Sum including this Change Order will he I 4,443 454.26
The Contract Time will be immossed by Tao (0) days.
The new data of Subnantial Completion will be March 8, 2023
NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, on the Contract
Time,,, that have been authorized by ConsWction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
WSKF Inc. Crossland Construction Compeny, ins. Ci o£Rivenide
ARCHITECT (Firm ram) CONTRACTOR (Firm bane) (Firm name)
AIA ne[ument G]at'-set]. (:ogrgM 019]9, 1987.2000.1W1 aM 2pt] ay Tna Nnerl®n IntlWb of NMaeM. NI M1aMe memE. TM1e'Ame,vxn
Institute o(A,Ailttb.''AIA'am AIALse.and-ALA(nvmca Do,mern' amrefstered eadarteMa and may not be Used wimWt omrndahmn TaN aaaarem .�
wee pmlucen by AlAwbwwe et 111313 ETon t0aWN22 u,cw Oran No311424M32whic6 aspen on 1w1aR022, w roibr rout;. N Walnwdtmonaare
Ira only, and meryonly be uud in accwdenoe wire me AU Donhar3 Dommenbe Temw oC Swat®. Tanned a]pyliant ablations. a -mall mpydgai@axo,.
Later NWa: (31100002))
Rick Kuhl, RA � ��,';"_,'"�9y=
Ryan Wacker�,��m—^
SIGNATURE
SIGNATURE
sick Kuhl, Principal
Ryan Wacker, Project Manager
PRINTED NAME AND TITLE
PRINTED NAME AND TITLE
October 5, 2022
10/6/2022
DATE
DATE
u.e.
CROSSLAND Potential Change Order
CONSTRUCTION COMPANY. INC.
Riverside Public Safety Additions and Renovation - 221A017RWZD
22MO17RWZD
2Yb. Nwvrnan Rme
Subject PRO06 Lobby LgMing Revisions Soured of Fondled: Owner Conned CNn9e ONer
Coatto llbrl
Coat to remove iM1e CIO light OaWres from the Lobby reillnB and keep esia4n8 M1Mum.
Dm ueeW:0 choose TOW: Abl
eMn Nunbeloseessate Agmbunr
01_ _._ Cost to renove the C101i9MAdonis in the lobby $(332657)
02 P&O $(IN 33)
Fpprovdd By BY'1IEEN
Signature V V
Wt. .20 Dia.
0 PROJECT CHANGE REQUEST & AUTHORIZATION FORM
wa c hte r 0owaand Cwmmctlon
Scope -Deduct the material and labor per PKRM PR# 006.
I:a:1If( IRe']
CHANGE APPROVAL
By signing below, both parties agree to the content and total charges o)this project change request Materials and equipment will not be
ordered, or labor expended until this request is approved by both parties.
Potential Change Order
Riverside Public Safety Additions and Renovation - 22MO17RWZD
22MO17RWZD
2990 nwvlmon Road
16—osma. Mo .15o
subject PRO0]-Vapor Banner Repair soumaalishol : owrerConyadchanaeoNer
oa Vitipa
Comm repair vapv tamer in the eMehor walla am muings onmvened daang demolition.
gave Repeated: 0 CM Tebl: $4,941
Ibmeurrbr I baseHaves, 1jearesser,
01 _ _ Cost to tape am adhere vapor banner that isfaling on egenor walls _ _ _ 14,712.00
02 P&O _. _. $23560 _.
Approved ey BY L
&,hature waxial
Date 3 0
Riverside
Kevin Kimbrough < aaabuildei,sgmailcom. eJ R=ply 4) Reply all > F—a,d pi
Ta ORyan Wacke, 1ue9 GdC3E d9 pM
QI Ypureplledle Numeaaegeontil V20224i6PM.
IXIEMaL91Y:ThIsem Oa�gnNetlhwnauti tle NfMarpnlollort Uorwk6h6ntr pr ppen emchmenttuJesyo remanhetliessnJerW kno�tM1e mnhM ork.
Ryan,
ID NknHng a rethnprlCeSassodatetl WIMthe Rlve,lf public Safelyp�:
VRN2: TorepalrkllanJlnsulatlmabanecOling: s4,712M
RFI0.V'3 Tw layersaldrywall on bottomof IVerellingsand around Ighb: $C,BIq.OJ
Potential Change Order
Riverside Public Safety Additions and Renovation - 22MO17RWZD
22MO17RWZD
i.9 R. canon Rose
SuEleo PR0012.A131ak A13a Ac ss Panel Soume of Fundlnd: Omer CoMmd Chance ONw
eeeur".
usw: o Tdfal: 71.M
Xmewoe iee lore R m
01 Cmlto nlal t*a sspandsip Room5A131Band AIM $92500
MME91WAMMI
W%9MiM
mar
Riverside Public Safety
Kevin Kimbmugh <aaabuildera@gmaikcom>
To O Ryan Wacker
e] RePN %) aeplynn � rornare 1 I$
Mon 9A912012 Yi AM
FIf19YMkBW:Thbemal OrVoided from outstle afMe organization. 0o red, dick WI¢a spear etb[M1menh uNes Wu rt[apibc the sender and know Me canteoR is safe.
Ryan,
The folkwving Is the cost breakdown on extra's on Me Riverside protect.
PR 007: Matonal$107MM
tabor: $3,0a2.00
Total: $4,212.00
RFI W03: Material: $820.00
labor: $3,9 .M
TMI: $6,800.00
AccessPanels: Material: $425.00
lab0c $500.00
Total: $925.W0
CITY OF
RIVERS
MISSOURI
UpnR 5p..,din.l.
29SO NW Vivion Road
Riverside, Missouri 64150
MEMO DATE:
October 13, 2022
AGENDA DATE:
October 18, 2022
TO:
Mayor and Board of Aldermen
FROM:
Noel Bennion
RE:
Change Order 5: Crossland Construction Company, Inc.
Additions & Renovation Riverside Public Safety (537-086)
BACKGROUND:
This change order includes several items. We were able to keep some of the
existing LED lobby lights, a cost savings of $3,492.90. During demolition we
discovered that the original vapor barrier in the ceiling was failing. This includes
$4,947.60 to repair the vapor barrier. We also determined that access panels
will be needed in the hard lid ceilings for rooms Al 3 1 B and Al34 at a cost of
$971.25. This will allow us to access utilities in the ceiling in the future.
BUDGETARY IMPACT: An increase of $2,425.95.
On final Contract Amount
$4,404,000.00
Total of Previous Chan es**
$37,028.31
Total this Change Order
$ 2,425.95
Current Contract Total
$4,443,454.26
RECOMMENDATION: Staff recommends approval of the resolution and acceptance of the change order
with Crossland Construction Company, Inc.
"LISTING OF PREVIOUS CHANGE ORDERS:
COI:
Relocate conduit in walls
$33,413.48
CO2:
Replace degraded sewer
i
$ 9,671.55
CO3:
Reuse existing VAV units
-$ 2,535.81
C04:
Keep existing windows
-$ 3,520.91
Total
$37,028.31