HomeMy WebLinkAboutR-2023-012 Appoving Change Order 11 with Crossland Const.RESOLUTION NO. R-2023-012
A RESOLUTION APPROVING CHANGE ORDER 11 TO THE AGREEMENT WITH
CROSSLAND CONSTRUCTION COMPANY, INC. FOR ADDITIONS &
RENOVATIONS RIVERSIDE PUBLIC SAFETY RESULTING IN A REVISED
CONTRACT AMOUNT OF $4,876,565.89 FOR SUCH PURPOSES
WHEREAS, the City of Riverside ("City") issued an Invitation to Bid for the Additions
& Renovations Riverside Public Safety (Project No. 537-086) ("Project'I which was awarded to
Crossland Construction Company, Inc. ("Crossland") pursuant to Resolution R-2022-038; and
WHEREAS, the Board of Aldermen finds that it is in the best interest of the City to
approve Change Order 11 to the agreement with Crossland, resulting in a total revised contract
amount not to exceed $4,876,565.89.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF
THE CITY OF RIVERSIDE, MISSOURI, AS FOLLOWS:
THAT Change Order 11 to the Agreement between the City and Crossland, a copy of
which is attached hereto and incorporated herein, is approved and the Mayor is authorized to
execute the same on behalf of the City. The resulting revised total contract amount shall not
exceed $4,876,565.89.
FURTHER THAT the Mayor, City Administrator and all other required city officials
are authorized to take such other actions and/or execute and deliver for and on behalf of the City
all certificates, instruments, agreements and other documents as may be deemed necessary or
convenient to carry out and comply with the intent of this Resolution.
PASSED AND ADOPTED by the Board of Aldermen of the City of Riverside,
Missouri, the 7th day of February 2023.
I:
ATTEST"
Robin.K,i4c�4,CltyClerk
Rose,A at
lcen E.
RIA Document G701 - 2017
Change Order
PROJECT:(Nami and address)
Additions & Renovation
Riverside Public Safety
2990 NW Vivia Rd.
Riverside, MO 64150
OWNER: (Name ardad&ws)
City of Riverside
2950 NW Vmion Road
Riverside, MO 64150
CONTRACT INFORMATION:
Contract For. Gemand Construction
Data: May 16, 2022
Notice to Proceed: July 11, 2022
ARCHITECT: (Na and address)
WSK F, hae.
110 Armour Road
North Kansas City, MO 64116
Change Order Number: 011
Date: January, 17, 2023
CONTRACTOR: (Name add add.)
Crossland Comma:tion Company, Inc.
833 S. Fast Avenue
Columbus, KS 66725
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a dreaded description oftAe charge and ifappfmabla coach or referdwe specific exhibits. Also include agreed&Pen a4ur asar
aonbatable to executed Conndrudian Change Direcdvar.)
1. Per PC00027 dated 1/17/2023, the cost to build the parapets per details in ASI 011. Includes framing, labor, and equipment
for new parapet walls; roofing, sheet metal, and flashing; steel and welder to add angle hon on G12.
$10,286.15 - Increased Cost
2. Per PC00030 dated 1/12/2023, the cost to mcaulk the window perimeters and seals at the lobby clerestory windows.
53,245.55 - Increased Cast
3. Per PC00033 dated 12/18/2022, the cost to replace the sally port drain file that was damaged during the sally port
excavation.
$2,594.13 - Increased Cat
4. Per PC00041 dated 1/17/2023, the cost to reflash and reseal existing curb per city direction.
$1,051.05 - Increased Cost
$17,176.88 - Total Increased Cost for Change Order No. Eleven
The original Contract Sum was $ 4,717,000.00
The net change by previously authorized Change Orders $ 142,399.01
The Contract Sam prior W this Change Order was $ 4,959,389.01
The Contract Sam will be increased by this Change Order in the amount of $ 17,176.9
The new, Contract Sum including this Change Order will be $ 4,876,50.89
The Contract Time will be unchanged by Zern (0) days.
The new data o'Substantial Completion will be March B, 2023
NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract
Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
WSKF, Inc. Crossland Construction Company, Inc. CityofRimaid.
ARCHITECT (Firm arse) CONTRACTOR (Firm name) OWNS (Firm mneJ
Rick Kuhl, RA M' Ryan WackerS• ��
A111 npWnym or% --son. eaByliBmo tare. tar,' oa, 3ppt aM rot r Dy rMMWbn imllars dAItl11Y Ja. a rgMa Ieeawa0. The'Ame-hn
inaraie otarel ikgS; 'ALA," the AiA Logo, and AIA contract DotumerW are regimeree traesmaMs and may not be used without p—,,T—n rhia coo man 1
am Paduaaddity"newseantact 18 nm 0111M uMwddm NOA1WZ1m81 w6iC�minimaontooydgM reMms resale, islicensedtarane time
�analand maY m4r be used in aawtlenm YMa tlM alas Conb1G 9acumenlr TemNarBdraa. Ta reaart gatyrgM vblMlms, o-mailm%nB(3139A A31
Uax NaM: (a99ADA39)
SIGNATURE SIGNATURE
Rick Kuhl, Pnncfual Ryan Wacker, Project Manager
PRINTED NAME AND TITLE PRINTED NAME AND TITLE
01126/2023 1/26/2023
DATE DATE
Institute of Anohasoos--A10."the MA Lett, ani
eas produced by AIA .oMnre st 13:21:18 ET
use only and may only be used In accordanw
U.er Note.:
DATE
CROSSLAND Potential Change order
CONSTRUCTION CONMNC INC.
Riverside Public Safety Additions and Renovation - 22MO17RWZD
22MO17RWZD
2990 Nov Noon Road
Subject New Parapet Der ReV2 Source of Furgln6 Owar, Covered Carl Order
caraddpaon
Cofl ro builE tM paropels per tlMaJls in N51 Ott. Indutlea framing, labor, antl e$uipment for new paraderwalls, rwfng, wheel mdal, and flashing', Mal and welder to add angle
non an Ott.
Di Requested: 0 C TaM: $10286.15
farad Rumbor
cereal .
♦ndoara
Ot
Additional framingmoderate, and labor to install parasols per new details.
3065_200
02
Cost for addtlmnal mrfing and sheet metal smpe. Metal wall panels are formal In lieu of sheer
$281100
metal to prevent oil `arming of sheet metal.
03
Cost for Delta to remove the existing gutter on the west al is allow for framing installation
5124800
00
PBO on Subcontreos
5435.55
05
Cost to install new angle mon on detail G12
$91200
06
Angle Iron added In detail G12
$12400
07 _
Poi on Self Pedarm
$10360 _
Approved By. ify
Signature
Date
A16DELTA
INNOVATIVE SERVICES INC.
November 10, 2022
Crossland Construction
Attn: Ryan Wacker
3252 Roanoke Road
Kansas City, MO 64111
Re: ASI 11 clarifications & modifications
Mr. Wacker,
4141 FAHMANKS AVE
KANSAS CITY, XS 66106
913-371-7100 PHONE
913-371-7107 FAX
w deltaservices rom
Re: Riverside Public Safety
Roof Replacement
Please find below associated cost for material and labor for clarifications and
modifications to expansion joints/walls at Riverside Public Safety per ASI 011.
Work includes:
1. Credit for roofing material and labor per details in ASI 11.
2. Material and labor to install metal wall panels (as prefinished sheet metal
flashing is not feasible) per detail Al2/A1.06.
3. Material and labor to re-roof/flash per clarifications of details Al2, G12, &
H7/A1.06 and Al2/A1.07.
Excludes:
1. All items not included in above scope of work.
2. Repairs for damages by other trades.
3. Overtime.
Labor: $109.42/hr X 1 man-hour ($ 109.42)
Materials: ($ 405.64)
Subcontractor proposal (DB2 Services) $ 3,139.19
Markup of Subcontractor 5%: $ 131.21
Bonding: $ 55.66
Total: $ 2,811.00
Respectfully Yours,
cV&"
Jamie Fletchall
Project Manager
�DB2
SERVICES INC.
4141 FAIRBANKS AVE ARCHTTECI'URAL SHEETMEfAL PHONE, 913-677-2408
KANSAS CITY, KS 66106 w db2services.com FAX: 913-677-0909
November 10, 2022
To: Delta Innovative Services
Attn: Jamie Fletchall
Project: Riverside Public Safety
SCOPE: Provide and install metalwalk panels per revised details Al2/A1.06 inASI 011.
-Labor and Material to Shop Fabricate and Install Metal Wall Panels
qNp Drawings:
$0.00
Material:
$ 957.37
Shop Fab:
$ 132.52
E t:
$0.00
Demo:
$0.00
Field Labor:
$ 1,763.92
Sub -Total:
$ 2,863.81
OH & P 10%:
$ 285.38
Total Sum Of.,
$ 3,139.19
Exclusions:
• Wood Blocking
• MasonryWork
Schedule:
• Shop Fab:
• Fieldlostall:
Sincerely,
Kyle Hanks
Project Manager
DB2 Services, Inc.
aemla DELTA
INNOVATIVE SERVICES INC.
November 22, 2022
Crossland Construction
Attn: Ryan Wacker
3252 Roanoke Road
Kansas City, MO 64111
4141 FAIRBANKS AVE
KANSAS CITY, KS 66106
913-371-7100 PHONE
913-371-7107 FAX
www HPltagPrvirng corn
Re: Riverside Public Safety
Roof Replacement
Re: Remove existing gutter fascia for framing installation by others (at NW side of North
tower below standing seam roof) & re -install existing gutter fascia
Mr. Wacker,
Please find below associated cost to remove existing gutter fascia, install framing (by others),
and install existing gutter fascia as requested at Riverside Public Safety.
Subcontractor proposal (DB2 Services) $ 2,354.20
Markup of Subcontractor 5%: $ 417.71
Bonding: $ 24.09
Total: $ 2i496.00
Respectfully Yours,
r5r"a
Jamie Fletchall
Project Manager
�DB2
SERVICES INC.
4141 FAIRBANKS AVE ARCHITECTURAL SHEETMETAL PHONE: 913-677-2408
KANSAS CITY. KS 66106 www.db2services.wm FAX: 913-677-0909
November 21, 2022
PROPOSAL
To: Delta Innovative Services
Attn: Jamie Fletchall
Project: Riverside Public Safety
SCOPE: Remove Existing Gutter Fascia Facade So New Framing Can Be Installed on The NW Side of The North
Tower Below the Standing Seam Roof. Reinstall Existing Gutter Fascia Facade.
Item Description: Remove and Reinstall Existing Materials, With New Sealant and Stainless -Steel Rivets & Screws
-Labor and Material to Shop Fabricate and Install,
Shop Drawings:
$0.00
Material:
$181.28
Shop Fab:
$151.39
Equipment:
$0.00
Demo:
$0.00
Field Labor:
$1807.52
Sub -Total:
$2140.18
OH & P 10%:
$214.02
Total Sum Of:
$2354.20
Qualifications:
Exclusions:
• Any removal, or reinstallation of existing the standing seam panels if it's an apron gutter and can not be
removed with removing screws out of the gutter brackets.
Schedule:
• Shop Fab:
• Field Install:
Sincerely,
Kyle Hanks
Project Manager
DB2 Services, Inc.
Riverside Public Safety
®Kevin Kimbrougn eaaabuiltlers@gmaiLcom> IN ...
'o Rpn Wa,ku Mon 1b5/IDII INJb PM
Q19NYBkNaHennaRwl{ImhLhamaWke of Neorpnlnl�on. bo nM tlkk finksoropenaR¢AmentaunlnaA'+ r¢oknaelne xenEnand knon ibe Ariem fe
Ryan
T Mlaxaret ara'ssMw 1bebreakoutofm nal/laMr.
real Malenal $llGtll
GedR lnhor: $3}PL.IMI
Al fIX xaod papea l: $cM.N
UWr: $Al
Talal Cral of$GIb.lM1
Riverside Public Safety
®Kevin Kimbrougn <aaabmltlel,@gmalco— I) Reply, mJRepNAll Iramaruel'Is ..
"l el.mamad Ill — a— D,— I,k ll.0 o.o 1Inalmena:vmnx on pal pal Inalknwrkmnrtrauaee
"An,
TheMbanry are eMrasm Ine Rl�ske Pub4SikN Wapet
Ladom For wall rNrn cal
$l iiii
Re: Riverside Public Safety
®Kevn Kmbrough<aaabuildem@gmail.wm> K'J 8er1/ "All rowma 1 _..
tI Fyan Wahn Fn11/ 2022&LAM
Syn Your.eyiy allwlR gacared lM1anYpu. lnnkpul PacainN rd acceple6 Qi FMEazk
fYl®FYFaYLThaem J oepnandflanauaAde dMe ppvalNn. Do Nha,Alan .nacNnen6 Wesyour,.-.� room a rid knw MemItanl tiah.
0.yan,
To aW two layers of wnsglAms will be an adlllwW
.nal s'..
laMr: $ 33.W
TOTAL ss..N
Re: Riverside Public Safety
®Kevin Kimbrough <aaabuildem@gmai4om,
m e'..nv
wo ,.muolomn m.ua.. on ... Q. I. A.
e� BenN <7 aavNAu > rAe+am � �^
rm8x/t BMYL ma em.n agn.ha Fmm nmue m u1e ar.nu.mn. m nn ala ont ur nyen.rcnmaiu well ae,. aAnue me ¢nee..ne aoa me wum u are.
Ryan,
AaW poclry l.a.hhv a ae rynol
MAI At oo 107
nea 3/5 wall 16^ on oonhr to dwk
44418'3/5 wall onto It. raw of bw ger —11
Malarial: xUal.IM1
uraw: 51883.00
TOTLL $SBfiLT
PG I i
1
OK TO LOAO
[[[IK08r �6Y1 IIZI w - -- I
IOIN ✓I j � XBNr �6�SIIT14
INI IOW �T
M[ �ttlivaM��IA�MflD W[ - �,GI('pFflfii➢
I
CROSSLAND Potential Change order
CONSTROCTIOO COMPANY. INC.
Riverside Public Safety Additions and Renovation - 22MO17RWZD
22MO17RWZD
2990 NW Nvbn Read
Rlvenide, Ad .1.
Su0leet PR30- Window Sill Flashing Reuair Source of Funding: Owner Contrail Change Order
CoMto don
cos reuulx the wlddgw pedmemre and seals at the wldddwa.
DAsket,amm, 0 Chan"Total: $3.20.5.55
Ibm Rumba ANAMMARMANNY 1A.ft
01 Costtor ashandrewaxroolmyetthewmdow lrctio prAS15_ $3,091.W
PhoM&Ovedtead $150.55 -
Approved By RY
Signature
Dam
OATF A.13.3013 Customer:
10B: nwrside pub sa@ty
Change Order•
Change Order Description: Protect
cut out and caulk [Ierastory window perimeters, weep channel
resume, ared sealant from frames, frame Burns. sill flashing
remove glass to frame sealants and re wet seal glass to frame
remoae and renulk flashing Butt joints and frame joints
ProduR/Oecription
cut out and caulk end Perin
e ared sealant
remamwi..,
ur end-tonalwind
.hp
labor $].Sa3.00
ch,$21.00@ p
obpl SM.0 @IOM
total 53,091.00
one mess. 9ry/each exccost
IN 10 $ 139a6
gI 5 $ 130.95
5
5
5
5
5
5
5
Cmsdand Cons[rutlion
Riverside Public 3alery
[essory labor hours tsbor Sell
11 ] $
654.10
9 $
Ba9se
1 $
93.a0
30 $
93a.42
5
CROSSLAND Potential Change order
CONSTRRCTOM COMPANY INC.
Riverside Public Safety Additions and Renovation - 22MO17RWZD
22MO17RWZD
28e0 N W V-n h.
Rlae oft, MO .1.
Subject Crain Tile In Sally PM Repo, Sewell M Funding: Owher Contract Change Order
coosg to
Cm n
2dape the wIIv port ar.m the had was aamwea during the wily pan excavation.
upIW:0 C TaW: 32594.13
Ibm Bumbr
Approved By:
Profit &Overhead _._ $12053
Signature
Dare
RE: Riverside PS - Sally Port Drain Tile
Dave Joe <djm®genEnsplumbingLOm>
To O Ryan Waho
Cc Daw loq SM1annon Wtich
fl RWIy o) R,IyAll � F-11d 16 ...
Mon TLT" 9II 205 VM
FIrON,LL FYW ThBemeil M[inehdham ouhldeof tM1eorpnlulM_ W Mal�bntror open etfa[M1menhunkuwu reuy�betM1ereMvand bwwlM1ewnhmk nh.
Ryan
Thepine for sub soil drain1 sarkk$2per fo 22 al me If cos in Sm'rolk. WeneM 11i0'roreplace what kdamaged incluai�y ehuvaM1an.ttis rot dub out. The
aadmoaal corm rveplace d k u r0lowz:
2W of f' subsoil down ble with s at$2.27 per foot
$.S.nD
8 bwrs BackM1re at $135 per hour
$1,m-0J
8 bwrs%umber at$85 per hour
$ halm
wMmal $2z46.00
Im OlIp $ 224,60
Tntel $2,4m.60
Best regards,
Gengls plumbin0 Enter,.., UC
121E (816)225 4576
Mai: (816)M 6720
Fah: (816) 35325"
Finad: dinaaji esistlumbim¢
CROSSLAND Potential Change order
CONSTRUCTION COMPANY, INC .
Rivemide Public Safety Additions and Renovation - 22MO17RWZD
22MO17RWZD
LRNn: 1117/Pb33 Number: W41
suaeet New coundemuM1ing at E Ming curb SpURaaFunaing, owrercomract change Order
Ceta
Coat A W relleaM1 and reseal existing unit per dIY Oiredion.
I Days ummubd: a chadmis TURN: Steel 05
MPPI Number lCandammiCid AnmaM
Ot Cost to lnmall newlashings on iFe existing lwlalor curb per Roo111nUUNdirWion. $1,001.00
Proli18 Overhead _$5005
Approved By:
Signature
Date
4&DELTA
INNOVATIVE SERVICES INC.
January 16, 2022
Crossland Construction
Attn: Ryan Wacker
3252 Roanoke Road
Kansas City, MO 64111
Re: Isolator Curb flashing for 1 unit
Mr. Wacker,
4141 FAIRBANFS AVE
KANSAS CITY, KS 66106
913-371-7100 PHONE
913-371-7107 FAX
www dpltasprvi .c cnm
Re: Riverside Public Safety
Roof Replacement
Please find below associated cost to shop fabricate and install new 24GA Berridge Zinc Gray
Bashings on one (1) isolator curb per RoofLink direction.
Subcontractor proposal (DB2 Services) $ 934.15
Markup of Subcontractor 5%: $ 46.71
Bonding: $ 20.14
Total: $ 1,001.00
Respectfully Yours,
Jamie fletchall
Project Manager
�DB2
SERVICES INC.
4141 FAQtBANKS AVE ARCHITECTURAL SIIEETMETAL PHONE: 913-677-2408
KANSAS CITY, KS 66106 w db2semces.can FAX 913-677-0909
January 16, 2023
To: Delta Innovative Services
Atha: Jamie Fletchall
Project Riverside Public Safety
SCOPE: Shop fabricate and install new 24GA Berridge Zinc Grey counter flashing terminating the new modified
roofing membrane on one (1) isolator curb covering up the old EPDM. Attaching through the existing galvanized
Range with mechanical fasteners with washers.
Item Description:
•Labor and Material to Shop Fabricate and Install,
Shop Drawings:
$0.00
Material:
$ 169.40
Shop Fab:
$81.34
FreightEguilimem:
$ 288.00
Demo:
$0.00
Field labor:
$310.49
Sub -Total
$ 849.23
OH & P 100/0:
$ 84.92
Total Sum Of.
$ 934.15
Qualifications:
Exclusions:
• Any removal or reworking of existing PVC condensate lines.
Schedule:
• Shop Fab:
• Field Install:
Sincerely,
Kyle Banks
Project Manager
DB2 Services, Inc.
CITY OF
RIVERSI
MISSOURI
Upstream from ordinary.
2950 NW Vivion Road
Riverside, Missouri 64150
MEMO DATE:
January 31, 2023
AGENDA DATE:
February 7, 2023
TO:
Mayor and Board of Aldermen
FROM:
Noel Bennion
RE:
Change Order 1 I: Crossland Construction Company, Inc.
Additions & Renovation Riverside Public Safety (537-086)
BACKGROUND:
The parapet walls for the building needed to be constructed differently than
designed, requiring more materials and labor. We intend to recaulk the
clerestory windows to decrease any chance of snow melt from entering the
newly -renovated building. The sally port contained drain the that was not shown
on the drawings. It was damaged during floor excavation and needed to be
replaced. As part of the re -roofing, it was necessary to reflash and reseal the
curb for an existing RTU.
BUDGETARY IMPACT:
An increase of$17,176.88.
Original Contract Amount
$4,717,000.00
Total of Previous Changes*
$ 142,389.01
Total this Change Order
$ 17,176.88
Current Contract Total
$4,876,565.89
RECOMMENDATION: Staff recommends approval of the resolution and acceptance of the change order
with Crossland Construction Company, Inc.
"LISTING OF PREVIOUS CHANGE ORDERS:
CO I:
Relocate conduit in walls
$ 33,413.48
CO2:
Replace degraded sewer pipe
$ 9,671.55
CO3:
Reuse existing VAV units
-$ 2,535.81
C04:
Keep existing windows
-$ 3,520.91
C05:
Lighting, vapor barrier, panels
$ 2,425.95
C06:
Rated Ceilings, floor drains, roof coping, broken s nitary
pipe
$ 62,533.52
C07:
Vanity, interview & bunk lights, locker ventilation
$ 5,982.93
C08:
Remove soap dispensers
$-1,751.19
C09'_PR
I3, Fire Kitchen Hood, Fire Conference Room, etc.
$ 29,269.94
C010: New flashin for existing condenser of units
$ 6,899.55
Total
$142,389.01