HomeMy WebLinkAboutR-2023-063 Approving Change Order 7 to the Agreement w/Kenton Brothers Locksmiths, Inc for Additional Equipment and Labor...RESOLUTION NO. R-2023-063
A RESOLUTION APPROVING CHANGE ORDER 7 TO THE AGREEMENT WITH KENTON
BROTHERS LOCKSMITHS, INC FOR ADDITIONAL EQUIPMENT AND LABOR IDENTIFIED
DURING THE CITY COMPLEX VIDEO AND ACCESS CONTROL PROJECT RESULTING IN A
REVISED CONTRACT AMOUNT OF $793,245.41 FOR SUCH PURPOSES.
WHEREAS, the City of Riverside ("City") awarded to Kenton Brothers Locksmiths, Inc the bid
for the City Complex Video and Access Control Project on April 5, 2021 pursuant to Resolution
R-2021-033; and
WHEREAS, the Board of Aldermen finds that it is in the best interest of the City to approve
Change Order 7 for $5,628.67 to the agreement with Kenton Brothers Locksmiths, Inc, resulting
in a total revised contract amount not to exceed $793,245.41.
BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE,
MISSOURI AS FOLLOWS:
THAT Change Order 7 to the Agreement between the City and Kenton Brothers Locksmiths, LLC,
a copy of which is attached hereto for $5,628.67 and incorporated herein, is approved and the
Mayor is authorized to execute the same on behalf of the City. The resulting revised total contract
amount shall not exceed $793,245.41 for the scope of work.
FURTHER THAT the Mayor, the City Administrator, and other appropriate City officials are
hereby authorized to take any and all actions as may be deemed necessary or convenient to carry
out and comply with the intent of this Resolution and to execute and deliver for and on behalf of
the City all certificates, instruments, agreements, and other documents, as may be necessary or
convenient to perform all matters herein authorized.
PASSED AND ADOPTED by the
day of 2023.
C�
ATTEST: .;
Robin Kincaid, .,ity Clerk
Board of Aldermen of the City of Riverside, Missouri, the
Proposal: Q4296
Tower PTZ #2
Prepared for:
11552 City of Riverside
2990 NW Vivion Rd
Riverside, MO 64150 US
P
E
W
Proposal Issued: I Proposal Valid to:
6/7/2023 1 07/07/23
Page 1 of 16
Client Information
Name: 11552 City of Riverside
Site: Billing: Contact:
11552 City of Riverside 11552 City of Riverside
2950 NW Vivion Road
2990 NW Vivion Rd Riverside, MO 64150 US
Riverside, MO 64150 US 8167413993
Project Description
Project Objectives
To ensure a successful implementation and completion of this project, the following objective(s) will
be completed by Kenton Brothers Inc.
• Provide 1 tower mounted PTZ camera for video surveillance on XProtect Corporate system
The services and hardware proposed in this document are developed based on the information
provided by City of Riverside. The configuration and technical details set forth in this document are
intended to provide City of Riverside with a solution designed to meet the current and future needs
of the company.
Project Scope of Work
Video System Description
KB will provide 1 camera for video surveillance on the XProtect Corporate system using
subcontractors for the physical installation on the communication tower. This will be mounted at
roughly 190' and be wired back down the tower into the equipment room.
Head End / Server location
• Use existing power over ethernet (POE) network switch
• Use POE port for 1 camera
• Use 1 IP address for camera
• Install Cat 6 from network switch to cameras
Cameras
• Provide 1 - Q6135-LE 2MP PTZ dome camera
• KB will coordinate camera view with customer's designated contact for final approval
Cabling
• Exterior cable that is exposed to the environments will be rated for UV exposure or burial
Page 2 of 16
direct as installation method requires.
• Interior camera cable will be exposed above finished ceiling.
• Interior camera cable will be exposed in open ceilings; Cable will be yellow in color.
• Interior cabling will be supported by standard trade methods.
• Interior cabling will be installed in a secure manner.
Warranty
• Materials are warrantied according to the manufacturer's warranty (minimum 1 year)
• Labor and workmanship is warrantied for 90 days.
Software Upgrade Plans (SUP)
• SUPs are included for 1 year. Continued software support is recommended to keep system
updated with new features and security patches.
Customer Requirements
The customer will provide items below to allow for a successful project implementation.
• Grant KB consultants and engineers reasonable access to facilities, IT systems, and
administrative access rights needed to complete this project.
• Provide adequate workspace for KB personnel.
• Make available all participating customer personnel so as to facilitate timely completion of this
project and the knowledge transfer process.
• Execute the timely review and approval of deliverables and project completion documentation
in support of the overall project plan and objectives.
• Any security clearances required by customer will be supplied the by customer in a timely
manner.
• Any safety or other training required by customer, not otherwise included in scope, will be an
additional charge. Customer must notify KB of any specific training time requirements.
• Provide IP addresses needed for this project.
• Provide all usernames and password to complete scope.
• Provide grounded bus bars at switch and exterior camera locations for lighting protection
• Provide internet security for server / NVR.
• Provide network routing and connectivity for cameras, workstations, servers, mobile
applications.
• Provide ample space for mounting equipment and hardware as needed.
• Provide all Ethernet ports for system connectivity as needed.
• Kenton Brothers definition of PPE (Personal Protective Equipment) is: hard hat, safety glasses,
steel toed boots, ear plugs, lift harness, high visibility vest. Any additional requirements must
be communicated prior to quote acceptance.
• Verify that the job site is ready for KB to perform the installation before scheduling the
installation.
• Any time that work cannot reasonably be performed must be disclosed before project
acceptance. This included periods of time that KB technicians cannot make noise and/or access
needed equipment, doors or wire paths.
Page 3 of 16
KB will charge the customer additional fees for any down time occurred during the installation if
customer requirements are not met.
Project Assumptions
• Any and all training provided as a part of the project scope is designed to give clients an initial
exposure to the systems involved. It is not designed to be a replacement for the
comprehensive material offered by the manufacturer's education services.
All outdoor lighting is operating as designed.
Lift can be driven on grounds as needed, no landscaping repair is included.
All work will be performed during normal business hours unless otherwise noted in the scope
of work.
Video Surveillance
1 Axis Communications Q6135-LE
AXIS Q6135-LE 60HZ
Electrical Trim Labor
2 ANIXTER MCTP61-4-3
3' CAT 6 PATCH CORD YELLOW
0 Electrical Trim Labor
1 MILESTONE SYSTEM XPCODL
XProtect Corporate Device License
0.5 Programming Labor
1 MILESTONE SYSTEM YXPCODL
One year Care Plus for XProtect Corporate Device L
0 Programming Labor
2 Ortronics KS6A44
ORTKS6A44 TECHCHOICE 1 PORT MOD JACK CAT 6 YELLOW
0 Electrical Trim Labor
200 WIRE CAT 6 DIRECT BURIAL BLACK
CATEGORY 6 UTP CABLE, DIRECT BURIAL, BLACK JACKET
2 Rough -In Labor
0.5 Kenton Brothers Engineering
Engineering Labor
Engineering Labor
1 Kenton Brothers Freight
Freight on Parts
1 Kenton Brothers Misc Installation Materials
Misc Installation Materials
0.5 Kenton Brothers Project Management Labor
Project Management Labor
Project Management Labor
1 Kenton Brothers Sub Contractor
Sub Contracted Work
Equipment: $3,063.00
Labor: $2,565.67
Video Surveillance Total $5,628.67
Equipment: $3,063.00
Labor: $2,565.67
Camera Total $5,628.67
Equipment Subtotal: $3,063.00
Labor Subtotal: $2,565.67
Project Subtotal:
$5,628.67
6/7/20231 Proposal # Q4296 Tower PTZ #2
Page 6 of 16 I I
CITY OF
RIVERSI
MISSOURI
Upstream from ordinary.
2950 NW Vivion Road
Riverside, Missouri 64150
MEMO DATE: June 15, 2023
AGENDA DATE: June 20, 2023
TO: Mayor and Board of Aldermen
FROM: Jason Ketter
RE: Change Order 7
Security and Access Control Project
BACKGROUND: The Security and Access Control Project was approved on March 2021 and
consists of:
• New Door Access and control system
• New Security Camera system
This Project started in May 202 I and is nearly complete, but in the process, we have
identified some places we would like to add to the security network
o We would like to add a second PTZ camera on top of the tower so we can see all
sides of the tower, at a cost of $5,628.67.
BUDGETARY IMPACT: $739,035.68 will be expended out of the 2021 Security and Access Control
Project.
Contract Amount
$703,637.00
-Original
Total of Previous Changes
$83,979.74
Total this Change Order
$5,628.67
Current Contract Total
$793,245.41
RECOMMENDATION: Staff recommends approval of the resolution and acceptance of the change order
with Kenton Brothers.