Loading...
HomeMy WebLinkAbout1954 Authorizing the City to enter into a Temporary Construction License Agreement BILL NO. 2023-063 ORDINANCE NO. /q5 AN ORDINANCE AUTHORIZING THE CITY TO ENTER INTO A TEMPORARY CONSTRUCTION LICENSE AGREEMENT WHEREAS, the City of Riverside, Missouri a fourth-class city organized and existing under the laws of the State of Missouri ("City") owns the real property more particularly described on Exhibit A attached hereto and incorporated herein (collectively, the "Property"); and WHEREAS, the City and Live Nation Entertainment, Inc., a Delaware corporation ("LNE") are Parties to that certain Lease Agreement dated as of December 6, 2022 (the "Lease"), leasing the Property from the City and the Parties are currently negotiating an amendment of the Lease, (the "Negotiations"); and WHEREAS, the timely completion of LNE's proposed improvements to the Property (the "Project") is in the mutual interest of both Parties; and WHEREAS, to help facilitate such timely completion, LNE has requested from the City a license on and over the Property for LNE, its affiliates, and their respective agents, employees, contractors, subcontractors, material men, suppliers, consultants, and other representatives (collectively, "LNE Parties") to enter the Property and perform contractor mobilization, prepare temporary roadways and laydown areas, install the storm water pollution prevention plan, perform earthwork grading and other various site work as set forth on Exhibit B, attached hereto and incorporated herein, (collectively, "Permitted Activities"); and WHEREAS, City Staff recommends the City's Board of Aldermen to authorize the City to enter into a Temporary Construction License Agreement "License") in substantially the same form and upon the same conditions as the License attached hereto as Exhibit C, attached hereto and incorporated herein; and WHEREAS, the Board of Aldermen find that authorization of the Temporary Construction License Agreement requested by LNE, as contained in Exhibit C, attached hereto and incorporated herein, fulfills a public purpose and will provide an opportunity to further the growth of the City, facilitate the development of Riverside, improve the environment of the City, increase the assessed valuation of the real estate situated within the City, increase the sales tax revenues realized by the City, foster increased economic activity within the City, increase employment opportunities within the City, and otherwise be in the best interests of the City by furthering the health, safety, and welfare of its residents and taxpayers. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE, MISSOURI AS FOLLOWS: SECTION 1 — BEST INTEREST OF THE CITY TO AUTHORIZE THE CITY TO ENTER INTO A TEMPORARY CONSTRUCTION LICENSE AGREEMENT. It is in the best interest of the City, in order to provide an opportunity to further the growth of the City, improve the environment of the City, foster increased economic activity within the City, JC 17518836.1 increase employment opportunities within the City, further the objectives of the TIF Plan, further build out the public infrastructure and otherwise is in the best interests of the City by furthering the health, safety, and welfare of its residents and taxpayers, to authorize the City to enter into a Temporary Construction License Agreement in substantially the same form as that attached hereto as Exhibit C, and incorporated herein. SECTION 2 —AUTHORITY GRANTED. The Mayor, City Administrator, Special Counsel to the City— Spencer Fane LLP, and other appropriate officials and employees of the City are hereby authorized and directed to take any and all actions as may be deemed necessary or convenient to carry out and comply with the intent of this Ordinance and to execute and deliver for and on behalf of the City all certificates, instruments, agreements and other documents as may be necessary or convenient to perform all matters herein authorized. SECTION 3 — EFFECTIVE DATE. This Ordinance shall be in full force and effect from and after its passage and approval. BE IT REMEMBERED that the above was read two times by heading only, PASSED AND APPROVED by a majority of the Board of Aldermen and APPROVED by the Mayor of the City of Riverside, Missouri, this 31s1 day of October, 2023. . ; Airil PO L .t5,1// hleen L. Rose, Mayor ATT Robin Kincaid,'' ty'Clerk • Ap• • ed as to form: •y J. Bednar, Spencer Fane LLP, •ecial .unsel to the City JC 17518836.1 EXHIBIT A PROPERTY DESCRIPTION JC 17518836.1 EXHIBIT A Description of License Property Approximately 130+/- acres as generally depicted below and consisting of the following Parcel Nos: 23-3.0-07-000-000-003.000 2 3-3.0-07-000-000-004.000 23-3.0-07-000-000-005.000 23-3.0-07-000-000-006.000 23-3.0-07-000-000-006.001 23-3.0-07-000-000-007.000 23-3.0-07-000-000-008.000 23-3.0-07-100-001-002.000 23-3.0-07-000-000-009.000 23-3.0-07-000-000-016.000 233.0-07-000-000-015.000 40 West at- a 1 ,�FAI R`t. 1,1,1. It ,l i.r1,l: zHorizons ( /�/� rl,l-rli,r,plj II 17)77177,77 rift-�l r/•�, ,4 Doorlink '-�'- +r+ z �� , v'itt�, i II 1st Plat . NW 39 S T= — — ' ` - ,, �1 -. -I _NW DECON --K.RP ►--- _ 0„ �i , z . ' rlr i.� lrl.1 - ( ,,,`,.,, i r i ,„`1_,`,l? ,111 L2r�,li I1 - S hli1,l-11Ir)1' ;1,,11111 , W.. .. .., r {- ,„00- �P P~` 3�N,GNWAY Ali' __ ,�/ pN N�6 MpN uNKr'NN1 AROO ( • - _ t 11 q lrlrlrti�`� r.'6. r i r 1 rli rr3.r 11 rrl �h ,�' 4 4 r_ ,l i.0 I-,1,1,1 rl a it.lrl;il,l lk ,i4c ,,,,:::,,,... , r.: - to r . ilrl rt it I a.rlr�j f y r. Exhibit A to Early Access License Agreement EXHIBIT B PERMITTED ACTIVITES CONTRACT JC 17518836.1 DocuSign Envelope ID D7D82206-E242-4DDA-AF89-610A3F5E0A33 LIVE NATION 9348 Civic Center Dr. LTV E rl A T I O 11 Beverly Hills, CA 90210 Tel 310-867-7000 October 27,2023 Via E-mail ARCO Construction Company,a division of ARCO Construction Holdings,Inc. 900 North Rock Hill Road Saint Louis,MO 63119 Attn:Adam Meyer,Project Manager Phone: 314-732-6762 Email:ameyer@arcol.com Re: Limited Notice to Proceed—LNKC Riverside Amphitheater located at the northwest intersection of Horizons Parkway and I-635 in Riverside,Missouri(the"Property") Dear Adam: This letter concerns the proposed work(the"Work")to be done by ARCO Construction Company,a division of ARCO Construction Holdings,Inc. ("Contractor")at the Property pursuant to the Contractor's Proposal,attached to this letter as Exhibit A, dated September 27,2023 (as revised by agreement of the parties October 27,2023)previously provided by Contractor to Live Nation Entertainment,Inc. ("Owner"). The parties are negotiating a construction contract(the"Contract")to set forth Contractor's and Owner's respective rights and obligations with respect to Contractor's performance of the Work. Unless and until the Contract is executed and delivered by Contractor and Owner,there shall be no binding agreement for Contractor to perform the Work (except for the portions thereof expressly permitted to be commenced by this letter,and then only up to the dollar amount hereunder which Owner is required to pay Contractor therefor).No legal terms and conditions from the Contractor's proposal are incorporated except to the extent included in the Contract. In the event of any conflict between the terms of the Limited Notice to Proceed and Exhibit A(and any sub-exhibits thereunder),the Limited Notice to Proceed shall control unless approved otherwise by Owner in writing. Execution and delivery of this letter agreement by Contractor shall be deemed a limited notice to proceed ("Limited Notice to Proceed")with the work described herein. Pursuant to such Limited Notice to Proceed, Contractor shall commence with the"LNTP Work"(as defined herein)on or before November 6,2023. Contractor shall provide notice to Owner if permits required to begin the LNTP Work are not received by such date,and(in such case)Contractor shall provide Owner with a revised commencement date and schedule for the LNTP Work for Owner's approval.The"LNTP Work"shall mean solely the following: as described in Exhibit A. Contractor shall assign sufficient numbers of duly qualified personnel as necessary to ensure that LNTP Work is performed in accordance with this Limited Notice to Proceed. If the Work includes obtaining surveys or geotechnical and other tests and reports related to the project site("Reports"),Contractor will act as Owner's limited agent for purposes of obtaining Reports in Owner's name and may rely on them(within the applicable standard of care)in performance of the Work. Owner shall be obligated to pay Contractor for the actual substantiated costs reasonably incurred by Contractor in performing the LNTP Work plus markup for Contractor's overhead,profit,and insurance(per Exhibit B)in the amount of 10.25%;provided that in no event shall Owner's liability in connection with the LNTP Work exceed Two Million Eight Hundred Twenty-Six Thousand Eighty-Nine Dollars($2,826,089) (the"LNTP Work Cost Cap"). Contractor shall invoice Owner for the LNTP Work and shall provide supplier and subcontractor invoices, lien waivers,and reasonable supporting documentation regarding any invoiced amounts as reasonably requested in advance by Owner. Owner shall pay any undisputed amounts due in accordance with the terms hereof and in connection with the LNTP Work within thirty(30)days after Owner's receipt of Contractor's invoice and all required supporting documentation requested by Owner. For the avoidance of doubt,any amounts paid by Owner in connection with the LNTP Work shall be credited against any amounts due from Owner under the Contract if and when entered into by Owner and Contractor. v.7.8.22 DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 ARCO Construction Company,a division of ARCO Construction Holdings,Inc. October 27,2023 Page 2 Upon execution hereof,Contractor shall provide Owner with insurance certificates evidencing Contractor's Workers' Compensation,Commercial General Liability,and Business Automobile Liability,as set forth in Exhibit B. Owner reserves the right to request additional coverage and have more detailed insurance requirements with higher limits in the Contract. To the fullest extent not prohibited by law,Contractor agrees to indemnify,defend and hold harmless Owner and Owner's employees,board members,and consultants from and against any and all claims,causes of action,losses,damages and liabilities for bodily injury,personal injury or property damage to the extent caused by Contractor's negligence. Without limiting the foregoing,Owner recognizes that Contractor's sole obligation for the presence of hazardous materials at the site of the Work not brought to the site by Contractor or its subcontractors is to stop Work and notify Owner so Owner can address the issue.Owner shall indemnify Contractor against all damages to the extent arising out of or resulting from the presence,exacerbation,removal or remediation of hazardous materials at the Site,except to the extent Contractor introduces hazardous materials at the Site or fails to follow instructions from Owner's environmental consultant, if any. Contractor grants an irrevocable,royalty free license to Owner in all documents,models and other work product of Contractor or any consultant or subcontractor of Contractor relating to the performance of the LNTP Work,whether hard copy or on electronic media(collectively"Work Product"). Owner agrees that the foregoing license and right to use the Work Product is subject to the following conditions: (i)Owner's alteration of incomplete Work Product,and/or Owner's use of the Work Product without the involvement of Contractor(except to the extent used to complete,maintain,or add to the Project without alteration of such Work Product),is at Owner's sole risk and without liability or legal exposure to Contractor or anyone working by or through Contractor; (ii)Owner shall indemnify and hold harmless the Contractor from and against any and all claims,damages,liabilities,losses,and expenses, including attorneys' fees,arising out of or resulting from such use or alteration. The obligations of this section shall survive completion and/or termination of this Limited Notice to Proceed. Contractor may subcontract designated portions of its LNTP Work("Subcontract")to any third party ("Proposed Subcontractor"),provided that,before Contractor enters into any such Subcontract,Owner shall have approved the following in writing: (a)the Proposed Subcontractor and(b)the specific LNTP Work to be subcontracted or delegated. Notwithstanding any subcontract or delegation of the LNTP Work as permitted above,Contractor shall remain fully responsible for all obligations hereunder, including,without limitation,the LNTP Work provided by its subcontractors and consultants. All subcontracts and purchase orders shall be fully assignable to Owner or Owner's designee,and shall grant to Owner the same rights in and to such subcontractor's or consultant's work product as is set forth in this Limited Notice to Proceed with respect to the Work Product. If Contractor and Owner do not enter into the Contract,then,at Owner's option,subcontracts and purchase orders shall be assigned to Owner or its designee without recourse against Contractor. In connection with their respective obligations under this Limited Notice to Proceed,each party shall comply with all applicable federal,state and local laws effective as of the date of this letter. This Limited Notice to Proceed may be terminated by Owner without cause and for its convenience upon not less than ten(10)days'written notice. In the event of any termination,Contractor shall be paid for all properly performed LNTP Work(including materials procured,any unreturned deposits,cancellation fees,or other costs due in settlement of cancelled agreements related to the Work)actually rendered up to the date of termination and for its overhead and profit on such actually rendered Work. Nothing in this Limited Notice to Proceed authorizes Contractor to recover fee or profit with respect to LNTP Work not performed or Work not performed. Upon any termination of this Limited Notice to Proceed,Contractor shall deliver(or cause to be delivered)to Owner copies of all Work Product in both hard copy and electronic form. 2 • DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 ARCO Construction Company,a division of ARCO Construction Holdings,Inc. October 27,2023 Page 3 Upon execution of the Contract, any of the permitted work actually performed under this Limited Notice to Proceed shall be deemed to have been performed as work under the Contract. If Owner and Contractor do not enter into a Contract for the Work,Contractor shall have no right to perform,or be paid for,any of the Work except to the extent permitted hereunder for the LNTP Work up to the amount of the LNTP Work Cost Cap. Neither Contractor nor Owner shall be liable for,and each hereby waives all claims for any consequential losses or damages,whether arising in contract,warranty,tort(including negligence), strict liability or otherwise, including but not limited to losses of use,profits,business,reputation,or financing.However,this mutual waiver shall not apply or preclude recovery for: (a)claims,damages,costs or expenses to the extent arising out of fraud, gross negligence or willful misconduct; or(b)third party claims covered by indemnity obligations hereunder,but only to the extent Contractor was afforded the opportunity to control the defense of such claims. The Contractor shall comply with all rules,policies,procedures and requirements(including the payment of prevailing wage in accordance with applicable laws),imposed by the Owner's lenders,fmanciers or other parties involved with any incentives for the Project. Owner shall notify Contractor of such requirements and Contractor may request a modification to this LNTP for an increase in the LNTP Work Cost Cap if such requirements result in an actual increase in costs.Notwithstanding the foregoing,the parties agree that prevailing wages as required by the wage determination in effect on the date hereof are included in the LNTP Work Cost Cap and will not be a reason for an increase in the LNTP Work Cost Cap. Please sign this letter where provided below,and return it by e-mail to the undersigned. Signatures hereon transmitted electronically shall be valid for all purposes; however,any party shall deliver an original signature hereon to the other party upon request. Please let me know if you have any questions. Sincerely. r_443.DocuSigned by A 004.44 Davi Co i gave President Accepted and Agreed: ARCO Construction Company,a division of ARCO Construction Holdings,Inc. e—DocuSigned by: By: W > Nance-Mate l ,P.E. Title:Vice President 3 DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 ARCO Construction Company,a division of ARCO Construction Holdings,Inc. October 27,2023 Page 4 EXHIBIT A CONTRACTOR'S PROPOSAL 4 DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 OUTLINE SPECIFICATIONS For: LNKC Amphitheater - Phase 1 Site Preload / Grading for +/- 16,000 Seat Amphitheater LIVE NATION CLIENT: Live Nation Worldwide, Inc. LOCATION: Riverside, Missouri BY: ARCO Construction Company, Inc. ARCO f O M 5 1•"i f,1 0 THE DEEIGNI COLD PEOPLE ARCO Job #507 September 27,2023 DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 PROJECT OVERVIEW The work shall include the earthwork grading associated with preload for settlement and consolidation of soils at the +/- 16,000 seat Amphitheater project for Live Nation Worldwide, Inc ("Owner"). This specification is in accordance with the drawings and geotechnical report information as listed in this Outline Specification; as prepared by ARCO Construction and includes the following items: 1. Design information utilized for creation of this outline specification and construction considerations: A. 100%schematic design drawings (civil, architectural, landscaping, electrical, plumbing, design finishes) [08.25.2023] B. 100%schematic design narratives (architectural, structural, MEPFT) [08.25.2023] C. Updated Draft geotechnical engineering report [08.17.2023] 2. ARCO excludes all environmental assessment, testing, and remediation; and assumes no liability for schedule delays due to third-party environmental work. 3. ARCO has included the following costs associated with improving the site for preload settlement and consolidation of the amphitheater bowl and retaining wall, and auxiliary buildings throughout the plaza: A. Mobilization, supervision, and existing utility-locates for mass grading, cut/fill operations. B. Clearing/grubbing and strip site topsoil and stockpile for reuse at landscaping areas (topsoil placement in landscaped areas not included in this phase). Limits of topsoil stripping and mass grading are defined generally by the Figure 1 within the Earthwork section of these Outline Specifications. C. Mass grading cut/fills required to bring site, amphitheater bowl, and auxiliary buildings to elevation as required in the geotechnical report specific to preloading/surcharging. Site grades/elevations within Figure 1 limitations shall help promote/establish positive drainage during and beyond Phase 1 activities. D. Removal of surcharge material is not included in Phase 1 pricing. E. Storm Water Pollution Prevention Plan (SWPPP) best management practices (BMP's) to be installed to accommodate Phase 1 earthwork activities. F. Construction staking as needed to support Phase 1 earthwork activities. G. Temporary rock/aggregate laydown and construction roadways are included to support Phase 1 earthwork activities as shown in Figure 2 within the Outline Specifications. Building Overview 1 page DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 OUTLINE SPECIFICATIONS TABLE OF CONTENTS PAGE Division 1 -General Requirements 1 Division 2 -Sitework 3 Division 3-Concrete 5 Division 4- Masonry 5 Division 17- Exclusions and Clarifications 5 Building Overview 2 I P a g e DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 OUTLINE SPECIFICATIONS Division 1 - General Requirements 1.1 Summary of the Work A. The work shall include the Phase 1 earthwork grading associated with preload for settlement and consolidation of soils at the +/- 16,000 seat Amphitheater facility. The new Phase 1 construction shall include clearing/grubbing/stripping, temporary roadways/laydown areas, and SWPPP as defined within these Outline Specifications. 1.2 Building Features A. Not applicable ("N/A") for Phase 1. 1.3 Applicable Codes A. The work shall be completed in accordance with these Specifications, the working drawings, and all applicable local codes. B. All work shall be completed in accordance with the requirements of the Platte County, City of Riverside, Riverside City Fire Department, and the State of Missouri. 1.4 Permits and Fees A. Owner shall obtain and pay all building/site/applicable permits and inspection fees required for this project. B. ARCO does not include any costs associated with utility extensions or infrastructure fees. 1.5 Drawings and Specifications A. Owner shall provide complete working drawings for the civil and engineering requirements for the project. These drawings will be provided for construction use prior to the start of construction. B. All required construction and engineering drawings shall bear the seal of licensed engineers of the State of Missouri. Should a governing body, airport authority, or local building inspector require that changes be made to any phase of the building plans or specifications, as they were prepared, approved and permitted, then any additional cost for said changes shall be paid for by Owner. C. No deviations from the approved plans and specifications shall be permitted without authorization from Owner. 1.6 Insurance A. ARCO shall carry State Worker's Compensation, Liability Insurance in amounts sufficicnt for this projcct. required by the LNTP. B. Owner shall provide Builder's Risk Insurance, witl I owner responsible fur payment of all deductibles in the event of a claim. C. All Certificates of Insurance shall be submitted to Owner prior to the start of construction. 1.7 General A. All work shall be performed in a professional workmanlike manner in accordance with generally accepted construction practices. B. ARCO shall provide temporary power, water, lighting, sanitary facilities, temporary field office, safety barriers, and trash removal as required during construction and Outline Specification 1 I P a g e DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 pay for all costs in connection with same including their removal. C. ARCO excludes provisions to provide local fire department a paved (concrete or asphalt) access roadway during construction. D. ARCO excludes temporary fencing and/or sitc sccurity mcasures for Phase 1. No third-party or off-hours security guard is inc uded. ARCO shall take reasonable industry measures to ensure site security. E. ARCO includes jobsite trailer (double-wide mobilizing at beginning of Phase 1 construction, and rental for (1 1) months, through settlement monitoring of preload/surcharging. F. ARCO field supervision time is included for the (5.5) months schedule for Phase 1 construction, as detailed in the Phase 1 Construction Schedule datcd 9/27/2023. October 26,2023. 1.8 Warranty A. N/A for Phase 1 1.9 Schedule & Seasonal Costs A. ARCO shall maintain a bar chart progress schedule and hold monthly meetings with the owner to review the progress of the project. B. ARCO does not assume the responsibility to make-up for delays caused by environmental testing or remediation. C. We include an allowance of $250,000 for premiums for seasonal costs for this Phase based on the schedule anticipated at this time. Please note that winter/summer costs will need to be evaluated depending upon overall schedule and impact due to encountered and forecasted weather conditions. Winter costs would include but is not limited to the following examples: lime drying, snow removal, soil discing, water pumping, rock for subgrade, etc. 1.10 Testing A. All quality control testing shall be provided by Owner, including settlement plate monitoring. B. Soil compaction, moisture, density, etc. testing is by Owner. All settlement and consolidation testing and monitoring is by Owner. C. Environmental assessment and testing are excluded from ARCO's scope of work. D. ARCO excludes all testing. 1.11 Surveys A. ARCO shall provide an "As-Built"topography survey showing preloading fill elevations and detention/swale limits to Owner after this Phase of the project has been completed. B. ARCO shall provide construction staking to establish limits for property lines, retaining wall at bowl, amphitheater bowl and preloading, auxiliary building preloading/surcharging, SWPPP, detention and swales for cut/fill and drainage, and temporary roadways. C. An Alta survey is not included at this time. Topography surveys shall be by Owner, with exception of as-built survey. Outline Specification 2 1 Page DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 1.12 LEED A. ARCO shall construct with sustainable intent, however, no costs are included for pursuing LEED certification. All LEED premiums are excluded. Division 2 - Sitework 2.1 Earthwork A. Any existing vegetation shall be cleared and removed within the areas of the mass grading as defined in Figure 1. B. ARCO has analyzed the site and will provide a balanced cut/fill. No import/export will be required at this location. Cut/fill quantities are evaluated for a balanced site for all Phases of the project, including and beyond Phase 1. C. The deep fills and prior pond burial performed by others (City of Riverside, etc.) increases the risk for differential settlement and soil consolidation with the added loads of soil and building from leveling the steep site. Geotechnical Engineer and Owner anticipate 6-month settlement monitoring period between constructing the preloading fills at the retaining wall and amphitheater bowl, and receiving clearance from the geotechnical engineer to achieve settlement/consolidation, and proceed with construction. The actual process of settlement and observations by the geotechnical engineer will dictate the ultimate timeline associated with mitigating this risk and moving forward with the building construction. D. ARCO does not include supervision services once preloading and mass grading associated with Phase 1 per Figure 1 is achieved. Figure 1 represents cut/fill assumptions of+/- 150,000 CY of material for preloading the Amphitheater retaining wall and bowl, and +/- 15,000 CY of material for auxiliary buildings. An additional +/- 100,000 CY of cut/fill mass grading is included to promote/establish site positive drainage within the limits shown in Figure 1. E. No removal or re-compaction of poor soils is included. Lift thicknesses and compaction rates to be achieved per the geotechnical report. Deviations from this report could result in additional costs, pending review and direction from Owner's testing agency. F. Removal/replacement of preloading/surcharge material is not included in Phase 1 scope of work. G. At auxiliary buildings, ARCO includes providing a preload/surcharge of 5' above the planned finish elevation of each building, extending full-depth to a distance 10' beyond the building pads laterally in all directions. H. At amphitheater retaining wall and bowl, ARCO includes providing a preload/surcharge of 5' above the planned finish elevation of retaining wall, extending full-depth to a distance allowing safe-sloping of 2:1 slopes from top of preload/surcharge elevation. ARCO assumes 5' of preload/surcharge coverage will need to be maintained above all bowl elevations exceeding 10' above plaza elevation -i.e.: as the finish elevation of bowl slopes towards the stage, preload/surcharge material will slope similarly until elevation 10' above plaza elevation is achieved; then preload/surcharge material will slope 2:1 to bottom of slope. Outline Specification 3 ( Page DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 I. We include all required siltation control and fulfillment of SWPPP (Storm Water Pollution Prevention Plan) per Platte County and Missouri Department of Natural Resources. J. Based on prior test-pitting and results of the Owner-provided geotechnical investigation, ARCO does not anticipate encountering rock on the site and no cost for rock excavation or sorting/management of large rocky material has been included. Should buried obstructions be discovered during the earthwork phase, the extent of the obstruction and solutions for such shall be assessed at that time. Phase 1 Limitations (land disturbance, stripping,cut/fill mass grading,etc.) 748� �4 " II I ,,, _ , z_..• ,,.,t.."4:1... io,..... . ... _de._ 4„,‘4, ,.,.., ,,.. -.;,..- ii-,. ....,."156 . ` ' r 750.4004.e. .., .. ., ::•L. � iT_741- _- __ 7 .00 740.00 / 46 747.1 I F i11 yL ;� 1 1 I ,.i C C6429 ...CA .-.6 11p 7-7 7 7 .50 746 29 746 40 D 7 .69 / it/kric' 1n 9;y^.+ 4 7 1 , ..00 74o.d0 ..31 a8., 7 6.4 � >, ti► J..R'! f 11 � co■■■ 35ce,26 z c.+01�.►F7 2M,y,'1�c�al.!'r. 74. 7 7 .35 748.26 4 7 7 53 7 13 7487 ///I �� 1 7 to . 7 ..00 7 •4 7 ..00 7.4 7 I4 c c1... _ co.z '0 .� z105 1�9. o I yy C., i , F�r[ ;' 749S0 � . 45.9145 , !•� t tel 1 ,' 4.., /��fl7 • • 1 t I72 7 0. 46,. 46.06 47 4 ,,4,. , r�_ - R :. 1i F0N6 c 7 745 0 F7 - 7 1217�r 45.567 774 T746.507 'S07 12\ ,I **E'1 tit 744 ii744.9 44 4 ..4 74 - 7 69 ■y11i ti tit • 1 (� 4 c0: 3j 2+65 . . Fff -� s 6 Ji 104 " 50 7_ 8a a44T: 7.45 463 7 . 5 0 ;•.36 7U. "^ 7. 1 7 - 0 744.80 4f/.I ♦ 5 7U ��� �r 1 04alfie t .� P0+50 ,0• F/1.24 tw off - ,, U.- � �.4� 95 1 hti ..� t • 7SI ' 742.48 I•� ,to _ 5.50 745 50 744.66 74 4550 7 i, \_/I '•'o. I 5+5� F 2.67 746.52 746 39 74� . " 7 44 �,,1 7 1U.81 145.17� t.70 ` '.82 47 50 7�� 746.95 7.. `• �"j 3711!�� , Figure 1: Phase 1 Earthwork Limitations (+/-) 2.2 Temporary Roadway/Laydown Surfacing A. Temporary roadway/laydown surfacing is included to allow for Phase 1 construction activities. The surfacing shall include the following: 1. Clearing, grading and compaction of existing subgrade. 2. Non-woven fabric. 3. 12" section of recycled crushed concrete material ("RCM"); placed and compacted. RCM shall be a 1.5" minus screened material. B. Any and all surfacing, paving, etc. beyond the temporary scope listed above is excluded from Phase 1. Outline Specification 4 I Page DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 Temp Roads 6 Fencing Legend D99c q*on Ouanmy Una Trailer laydown G.n.ral Parking Area 99.061 st E timing WamMuse end j asset-wives mlreMrurlwe i Connect b Ea.sti g SM..,Sewer len.Easement 1 eel _1 NOW Eaca.aoon not Prgeny tare 4 i _Connect to Ea Moe.o wiTn ess area SZ VIP Perking - . Note 5 E.o.m.VelscI. • Cnyg.g Stations b be I • tbdeekkere Oder Provided -VIP Drop-oa4 39I119 IEusugl • t _. _. _�_.. ..eavy-0uty C ‘ • f O. wneosed Slam Proposed nY'I • I I�y+� l "Sewer Rye I . ' Laves ` ^p Easement 11It t'. Figure 2: Phase 1 Temporary Laydown & Roadway Limitations (+/-) 2.3 Site Utilities A. N/A for Phase 1 2.4 Landscaping A. N/A for Phase 1 2.7 Retaining Walls A. N/A for Phase 1 Division 3 - Concrete 3.1 N/A for Phase 1 Division 4-Masonry 4.1 N/A for Phase 1 All Other Divisions N/A for Phase 1 Division 17 - Clarifications & Exclusions 17.1 Architecture & Engineering A. Owner shall furnish complete geotechnical, architectural, civil, structural, plumbing, HVAC, fire protection, electrical, construction documents, specifications and coordination of all other engineering disciplines as required for Phase 1 construction. Outline Specification 5 I P a g e DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 17.2 Items provided by Owner and not ARCO: A. Field testing, material testing, QAQC third-party testing, etc. related to soils consilitdation, settlement, compaction, moisture, densities, etc. B. Settlement plates installation, monitoring, reporting, etc. C. Design and construction documents. D. Permits and permit fees. E. Topography surveys for design coordination/implementation. 17.3 Items not included in ARCO's Scope of Work. A. Environmental assessment study or any testing for hazardous materials and/or environmental demolition or remediation B. Rock excavation and sorting or removal of any buried obstructions, rubble, hazardous materials, or other unforeseen conditions C. Deep foundations, moisture control of soil, sink hole remediation, slab underdrains, french drains, dewatering, etc. D. Temporary fencing, site security, etc. E. Landscape maintenance F. Soil remediation, lime, or Code L soil treatment (see allowances). G. Renderings H. Traffic generation fees or studies Scope items not listed within this Outline Specification. Outline Specification 6 I P a g e DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 Schedule of Values Project Name: LNKC Amphitheater Estimate Type: Phase 1-Pre-load/Surcharge Address: Riverside, MO Date: 10/16/2023 Drawing Date: 8/25/2023 100%SD Revision: 1 Phase 1 - Preload/Surcharge Trade Description Combined Total Clarifications Earthwork $ 1,837,899 Subtotal:Site Cost $ 1,837,899 Allowances Seasonal Conditions $ 250,000 Subtotal:Allowances $ 250,000 Total Trade Cost $ 2,087,899 General Conditions&Requirements Total Field Supervision/Setup for Surcharge of Ancillary Buildings and Amphitheater Bowl $ 443,014 Staking/Perliminary Layout $ 25,000 Geotechnical Engineering/Monitoring BY OWNER Total General Conditions&Requirements $ 468,014 Budget Summary Total Trade Cost = $ 2,087,899 Total General Conditions&Requirements = $ 468,014 Insurance 1.25% $ 32,081 Overhead 4.00% $ 103,520 Profit 5.00% $ 134,576 Total Additional Pre-Construction Cost = $ 2,826,089 DocuSign Envelope ID: D7D82206-E242-4DDA-AF89-610A3F5E0A33 General Conditions and Allowances Breakdown Project Name:LNKC Amphitheater COMPANY ARCO ARCOScope:Phase 1-Pre-Load/Surcharge of Amp.Bowl and CONTACT Adam Meyer/NorbStausebach „ , Auxiliary Buildings PHONE 314-732-6762/314-309-6169 Printed-October 26,2023(1:18 PM) EMAIL •roject Management Staff Project Executive 0% 120 Days $1,000.00 $0.00 Senior Project Manager 0% 120 Days 625.00 $0.00 _ Project Manager 0% 120 Days 500.00 $0.00 Assistant Project Manager 100% 120 Days 500.00 $60,000.00 Assistant Project Manager/Intern 0% 120 Days 175.00 $0.00 PM Staff Travel 1 LS 27,500 $27,500.00 Estimator 0% 120 Days 500.00 $0.00 Legal - 1 LS 20,000.00 $20,000.00 Project Field Staff $138,500 General Superintendent 5% 120 Days $1,000.00 $6,000.00 Senior Superintendent 100% 120 Days 750.00 $90,000.00 Superintendent 0% 120 Days 650.00 $0.00 Assist Superintendent 0% 120 Days 650.00 $0.00 Superintendent Staff Travel 1 LS 42,500 $42,500.00 Safety Manager-Onsite 0% 120 Days 500.00 $0.00 _- -------------._-- Laborer 0% 120 Days 440.00 $0.00 ecurit5 $13,750 Security Fencing&Misc 0 LS $0.00 Security Equipment Rental 0 Months 5,000.00 $0.00 Security Staff-off hours 0 Weeks $0.00 Temporary Security System/Webcam _ 11 Months 1,250.00 $13,750.00 Temporary Security System-install 0 LS $0.00 emporary Construction $64,750 Temporary Toilets _ 100 Services 100.00 $10,000.00 Temporary Handwashing Stations Services 100.00 $0.00 Potable Water 11 Months 750.00 $8,250.00 Temporary Office Trailers 11 Months 3,000.00 $33,000.00 Temporary Office Trailers-Mobilization 1 LS 13,500 $13,500.00 Temporary Storage Trailers/Containers 0 Months $0.00 Equipment&Storage $39,750 Stationary/office supplies 0 Months $0.00 Water coolers,refrigerators 0 Months $0.00 Street Sweeping&Misc Equipment LS $0.00 Onsite ATV's/Vehicles 11 Months 1,250.00 $13,750.00 Computers,printers 11 Months 1,000.00 $11,000.00 IT jobsite setup _ 1 LS 15,000.00 $15,000.00 , Final Photos _ EA $0.00 Progress Photos EA 400.00 $0.00 Removed from Phase I per LN on 10/9 DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 Project Name:LNKC Amphitheater COMPANY ARCO ARCOScope:Phase 1-Pre-Load/Surcharge of Amp.Bowl and CONTACT Adam Meyer/Norb Stausebach Auxiliary Buildings PHONE 314-732-6762/314-309-6169 Printed-October 26,2023(1:18 PM) EMAIL Safety Management 510,000 -OSHA Training LS 50.00 -Temporary protection and signage 1 LS 10,000 $10,000.00 -Fire extinguishers LS $0.00 -PPE -- LS $0.00 Temporary Condifiom&Utilities $44,000 -Temporary Heating EA $0.00 -Snow removal/ploughing LS $0.00 -Temporary power-connection LS $0.00 - - 11 Months 3000 $33,000.00 1 LS 11,000 $11,000.00 -Temporary access roads -- LS $0,00 Waste Management $11,000 -Rubbish removals-x no.per week 20 EA 550.00 $11,000.00 -Concrete recycle dumpster,concrete washout is 50.00 -Chutes -- LS $0.00 Miscellaneous $13,764 -Temporar Site Signage 1 LS 12,500 $12,500.00 -Final Cleaning ---- $0.00 -Other 1 LS 1,264 $1,264.00 Allowances $250,000 -Water Pumping 1 LS 75,000 $75,000.00 Estimated breakout within global allowance -Discing of Wet Soils LS 75,000 $75,000.00 Estimated breakout within global allowance -Snow Removal/Ploughing 1 LS 50,000 $50,000.00 Estimated breakout within global allowance -Extra Rock/Lime Drying/Misc. 1 L5 50,000 $50,000.00 Estimated breakout within global allowance ME 0. ADJUSTED TOTAL with HIGHLIGHTED ALTERNATES/ARCO ADJUSTMENTS $693,014 DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 Earthwork Breakdown /15 HB Construction Cis A-' , ! 15955 NW 120th Street Platte City,Mo 64079 Contact: Jason Falldorf Office Phone: 816.330.3600 Cell Phone: 308390.9061 Date: 10/24/2023 Job Name: ARCO-LNKC-Budget Plans: Generator Studio 100% 8/25/2023 Revisions: Pre-Load Items Prevailing Wage ITEM DESCRIPTION QUANTITY UNIT 10 Mobilization 1.00 LS 20 GPS Files/Site Calibration 1.00 LS General Conditions 71).443.17 100 Construction Entrance-To Remain in At Grade 1.00 EA 105 Remove Curb and Asphalt 1.00 LS 106 Clearing and Grubbing 1.00 LS 110 Strip&Stockpile 6" 65,000.00 CY 130 Cut/Fill-Minor Grading to Estabilish Drainage 100,000.00 CY Excavation 698,327.11 270 5'Surcharge for Buildings 15,000.00 CY 272 Surcharge+/-20'Average (50,000.00 CY Pre-Load/Surcharge NA.ork 801,900.00 282 Silt Fence 6,360.00 LF Erosion Control 9.921.60 900 Laydown Area-Recycled Concrete 12" 7,340.00 TON 902 Fine Grade Laydown 99,149.00 SF Laydown Area 212,385.85 910 Add Fabric for Laydown 11,010.00 SY Add Fabric(Non-Woven) 44,920.80 GRAND TOTAL 1,837,898.53 NOTES: Notes: Page 1 of 2 DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 Sales tax is included on installed materials. Deduct$14,500 for TE. Prevailing wage. Relocated Soil limited to Quoted Quantities. Rock Break&Relocation limited to Quoted Quantities. Additional costs for CAD revisions will be billed at cost plus 10%. Topsoil to remain on-site. Construction Entrance to remain in at grade. Meters by others. I�r,,lusiv„s. aulvu5,,,.,r;„3tu1-1ut;.,.�.,.,,,.1-,r�..l,�avemcnt,curb,or walk�,.at,,,at I,vHa,.la,utility adjuat,u,a,to. 1,,1„cat;,,,s„f site ut;lit traff,.z,.,ut,el,-1,ah.a,duus„r ttriuls,.,trcct--ck,anii.gfsvet,ep;„g f.,r other sa,pe3lt,ad,.s wat,,, t.,be sapplicd a„s;tc by Control Rcm__._,_ , Page 2 of 2 DocuSign Envelope ID: D7D82206-E242-4DDA-AF89-610A3F5E0A33 LNKC Amphitheater Phase 1 Construction Schedule ARCO Job e507 October 26,2023 Task ID1 I��d'ask Milestones(Phase 1On 29da Duration t /3 23 T z.2023 Half 1.zoza HMI z.2024 Ha a PRELOADING 1 At 1 � LNKC Amphitheater-PHASE 1-PRELOADING&SITE PREPARATION 297 days Mon 7/3/23 Tue 8/20/24 1 [LNKC Amphitheater-PHASE 1-%IELOADING&SITE PREPARATION - Only) days / / Tile 2/27/24 I f Milestones(Phase 1 Only) i 3 Notice to Proceed to ARCO 0 days Fri 10/27/23 Fri 10/27/23 •Notice to Proceed to ARCO 4 mit Groundbreaking 0 days Wed 11/8/23 Wed 11/8/23 4/Groundbreaking _5 Substantial Completion 0 days Tue 2/27/24 Tue 2/27/24 Substantial Completion I 6 MSPreconstruction,Pricing,&Permitting 145 days Mon 7/3/23 Fri 1/19/24 1 1 Preconstruction,Pricing,&Permitting 7n{ Update Budgets-100%SD 15 days Mon 8/28/23 Fri 9/15/23 Update Budgets-100%5D • 8 Updated Budgets-100%5D Review/Budget Approval 10 days Mon 9/18/23 Fri 9/29/23 Updated Budgets-100%SD Review/Budget Approval 9 lolg ARCO Phase 1 Proposal to LN 1 day Wed 9/27/23 Wed 9/27/23 RCO Phase 1 Proposal to LN 10 011 a LN Phase 1 Proposal Review 5 days Thu 9/28/23 Wed 10/4/23 LN Phase 1 Proposal Review 11 mit Phase 1 Notice to Proceed/Contract Execution 17 days Thu 10/5/23 Fri 10/27/23 i ia� : Phase 1 Notice to Proceed/Contract Execution 12 1 Design Phase 1-Civil/Site 80 days Mon 7/3/23 FN 10/20/23 11 I Design Phase 1-Civil/Site 13 P1 Full Civil/Site Design Release 0 days Mon 7/3/23 Mon 7/3/23 Full Civil/Site Design Release 14 mg Submit Pre-Application/Planning 1 day Mon 7/3/23 Mon 7/3/23 !.I Submit Pre-Application/Planning 15 al Entitlements Documents(Site/Grading/Utiliies/Storm/Traffic/Ard 20 days Mon 9/4/23 Fri 9/29/23 Entitlements Documents(Site/Grading/Utiliies/Stonn/TreffiolArch) 16 AI Construction Documents-Design Phase 1 Civil/Surcharge-Preloa 20 days Mon 9/4/23 Fri 9/29/23 IIII Construction Documents-Design Phase 1 Civil/Surcharge-Preload Plan 17 t Construction Documents-Design Phase 1 Civil/Site(Land 20 days Mon 9/4/23 Fri 9/29/23 awl Construction Documents-Design Phase 1 Civil/Site(Land Disturbance/Grading) Disturbance/Grading) le .4 Construction Documents-Design Phase 1 Civil/Site(30%CD's) 20 days Mon 9/4/23 Fri 9/29/23 •Construction Documents-Design Phase 1 Civil/Site(30%CD's) 19 All, Construction Documents-Phase 2(Civil/Site) 15 days Mon 10/2/23 Fri 10/20/23 11 ,.Construction Documents-Pha4se 2(Civil/Site) 20 AIL Permits&Approvals 145 days Mon 7/3/23 Frl 1/19/24 Permits I8t Approvals 21 AI Pre-Application/Planning Submittal&Review 45 days Mon 7/3/23 Fri 9/1/23 Pre- :ion,/Planning Submittal&Review 22 AI City of Riverside Entitlements(Site/Grading/Utilities/Storm/ 80 days Mon 10/2/23 Fri 1/19/24 City of Riverside Entitlements(Site/Grading/Utilitles/Storm/Traffic/Arch) Traffic/Arch) 23 Ali Design Phase 1 Civil/Surcharge-Preload Plan Review/Approval 20 days Mon 10/2/23 Fri 10/27/23 i 'gn Phase 1 Civil/Surcharge-Preload Plan Review/Approval i —24 mg Design Phase 1 Civil/Site Permit Review/Approval(Land 20 days Mon 10/2/23 Fri 10/27/23 I ��•-'gn Phase 1 Civil/Site Permit Review/Approval(Land Disturban Pernik)Disturbance./Grading Pek) Disturbance/Grading Permit) 25 Air MDNR Permit 5 days Mon 10/2/23 Fri10/6/23 I it 26 mg Civil/Site(Phase 2) 20 days Mon 10/23/23 Fri 11/17/23 „ Civil/Site(Phase 2) 27 Construction 212 days Fri 10/27/23 Tue 8/20/24 ill ll Construction 28 mg Sitework 212 days Fri 10/27/23 Tue 8/20/24 ill Sitework 29 AIConstruction Phase I(Preload/Surcharging/Site Prep/Grading212 days Fri 10/27/23 Tue 8/20/24 + Construction Phase I(Preload/Surcharging/Site Prep/Grading) 30 II Mobilisation 33 days Fri 10/27/23 Wed 12/13/23 ^" Mobilization 31 * Notice to Proceed to ARCO 0 days Fri 10/27/23 Fri 10/27/23 j Notice to Proceed to ARCO 32 mg Subcontractor Awards for Phase 1 5 days Mon 10/30/23 fri 11/3/23 T1 Subcontractor Awards for Phase 1 33 mg Mobilization 3 days Mon 11/6/23 Wed 11/8/23 Mobilization 34 Mt Initial Temp Laydown and Construction Road Stablizatlon/ 25 days Thu 11/9/23 Wed 12/13/23 . Initial Temp Laydown and Construction Road Stablization/Rock Placement Rock Placement 35 Alli Trailer Drop&Setup 10 days Thu 11/23/23 Wed 12/6/23 I Trailer Drop&Setup 36 All Grading&Drainage-Site Preparation-at Areas Highlighted 110 days Thu 11/9/23 Wed 4/10/24 Grading&Drainage-Site Preparation at Areas Highlighted in Supplemental Exhibit(Figure 1 in Outline In Supplemental Exhibit(Figure 1 in Outline Specifications) 37 NI Site Clearing 10 days Thu 11/9/23 Wed 11/22/23 Site Clearing 38 mg Mass Grading 40 days Thu 2/1/24 Wed 3/27/24 Mass Grading 39 mg Weather Days-Site Prep Grading 10 days Thu 3/28/24 Wed 4/10/24 I Weather Days-Site Prep Grading 40 1 Preload/Surcharge Fill Placement&Monitoring 79 days Thu 11/9/23 Tue 2/27/24 Preload/Surcharge Fill Placement&M¢nitoring 41 1011, Stripping for Fill Placement 20 days Thu 11/9/23 Wed 12/6/23 = ill Pacement 42 AI Mass Grading-Fills for Amphitheater Retaining Wall/Bowl 140 days Wed 11/29/23 Tue 1/23/24ass Grading-Fills for Amphitheater Retaining Wall/Bowl Preload 43 Ng Mass Grading-Fills for Auxilary Structures Surcharging 6 days Wed 1/24/24 Wed 1/31/24 I Mass Grading-Fills for Auxilary Structures Surcharging 44 as Weather Days-Amphitheater Preload 25 days Wed 1/24/24 Tue 2/27/24 Weather Days-Amphitheater Preload 45 Weather Days-Auxiliary Structures Preload 5 days Thu 2/1/24 Wed 2/7/24 We her Days-Auxiliary Structures Preload 46 NI Preloading Completion-Amphitheater Prealod 0 days Tue 2/27/24 Tue 2/27/24 Preloading Completion-Amphith Prealod -47 AI Preloading Completion-Auxiliary Structure Preload 0 days Wed 2/7/24 Wed 2/7/24 Pro oading Completion-Auxiliary Structure Preload 48 mg Settlement Monitoring(by Owner) 139 days Thu 2/8/24 Tue 8/20/24 Settlement Monitoring(by Owner) - 49 Ng Settlement Monitoring-Amphitheater Preload(Variable Dur 125 days Wed 2/28/24 Tue 8/20/24 —....i Settlement Monitoring-Amphitheater Preload(Variable Duration) S0 Ng Settlement Monitoring-Auxilary Structures(Variable Duratir 60 days Thu 2/8/24 Wed 5/1/24 Settlement Monitoring-Auxilary Structures(Variable Duration) Page 1 DocuSign Envelope ID:D7D82206-E242-4DDA-AF89-610A3F5E0A33 ARCO Construction Company,a division of ARCO Construction Holdings,Inc. October 27,2023 Page 5 EXHIBIT B INSURANCE REQUIREMENTS Contractor shall furnish the following insurance: A. Worker's Compensation 1. Statutory B. Employer's Liability 1. $1,000,000 C. Commercial General Liability Including Completed Operations 1. Bodily Injury and Property Damage Combined Single Limits a. $4,000,000 per-project aggregate limit b. $4,000,000 products-completed operations aggregate c. $2,000,000 bodily injury and property damage occurrence limit D. Commercial Automobile Liability 1. Bodily Injury and Property Damage Combined Single Limits a. $2,000,000 combined single limit E. Umbrella Excess Liability-$5,000,000 aggregate F. Professional Liability 1. $5,000,000 each claim 2. $5,000,000 annual aggregate [I. Builder's Risk Insurance shall be provided by check one: ❑ARCO or®Owner: A. Builder's Risk Insurance shall be provided at the total value for the Work on a replacement cost basis for flood,water damage, earthquake,earth movement,windstorm,and named storm unless otherwise disclosed.Contractor and Owner shall be Named Insureds.Owner shall make commercially reasonable efforts to have sublimits not less than stated below unless approved by Contractor in writing:additional claim data loss expense($250,000),demolition costs($1,000,000),debris removal($1,000,000), goods in transit($5,000,000),offsite storage($5,000,000),fire/police department service charge coverage($500,000),mechanical breakdown,design,vandalism and malicious mischief,property located underground,riggers,scaffolding,freezing,testing,glass, and all other perils. B. Contractor will be responsible for payment of all deductibles up to$50,000 payable in connection with a loss caused by Contractor's negligence.Owner shall otherwise be responsible for all deductibles and all costs not covered due to deductibles. Each party shall be entitled to a copy of the policy with premiums redacted. C. Notwithstanding anything herein to the contrary,Contractor and Owner waive,and shall cause their respective insurance carriers to waive,against each other,and the parties'design consultants,subcontractors,agents and employees of each and all of them,all damages covered by property insurance,except such rights as they may have to the proceeds of such insurance. III. Intentionally Omitted. IV. Subcontractors shall,and Owner shall make commercially reasonable efforts to cause Owner's separate contractor's to,furnish the following insurance: A. Worker's Compensation:Statutory limits whether required by law or not,and Employers Liability with limits of not less than $500,000 bodily injury by accident,each accident/$500,000 bodily injury by disease,policy limit/$500,000 bodily injury by disease,each employee,or if greater,in the amounts required by statute. B. Commercial General Liability(occurrence format),(including Completed Operations,Broad Form Property Damage): $1,000,000 Per Occurrence $1,000,000 Products/Completed Operations Aggregate $1,000,000 General Aggregate(Per Project) C. Automobile Liability: $1,000,000 per accident D. Excess Umbrella Policy: $1,000,000 E. Professional Liability: $1,000,000 each claim $1,000,000 annual aggregate V. Additional Insureds: A. Contractor shall name the following as additional insureds on its Commercial General Liability,Automobile and Umbrella Policies: Owner,Owner's Representative,Owner's lenders,Landlord,and each of their respective parents,officers,board members,directors, shareholders,members,partners,directors,Affiliates,subsidiaries,and employees("Additional Insureds"),provided that no Additional Insured shall have broader additional insured rights than those of the Owner as provided in this Agreement. B. Contractor shall require its Subcontractors to endorse their Commercial General Liability,Automobile and Umbrella Policies to name the Additional Insureds as Additional Insured under such policies,and Owner shall cause its separate contractors,to endorse their Commercial General Liability,Automobile and Umbrella Policies to name the Contractor as Additional Insured under such policies. 5 EXHIBIT C TEMPORARY CONSTRUCTION LICENSE JC 17518836.1 TEMPORARY CONSTRUCTION LICENSE THIS TEMPORARY CONSTRUCTION LICENSE AGREEMENT(this"Agreement")is entered into and effective as of the date of the final execution of this Agreement as set forth below(the "Effective Date"),by and between the CITY OF RIVERSIDE,MISSOURI, a fourth-class city organized and existing under the laws of the State of Missouri(the"Licensor")and LIVE NATION ENTERTAINMENT,INC.,a Delaware corporation("Licensee")(collectively,the"Parties"and each,a"Party"). RECITALS: A. The City owns the real property more particularly described on Exhibit A attached hereto and incorporated herein(collectively,the"Property"). B. The City and LNE are parties to that certain Lease Agreement dated as of December 6, 2022 (the "Lease"), and the Parties are currently negotiating an amendment of the Lease, (the "Negotiations"). C. The timely completion of LNE's proposed improvements to the Property(the"Project")is in the mutual interest of both Parties. D. To help facilitate such timely completion, LNE has requested from the City, and the City has agreed to grant to LNE,a license on and over the Property(the"License")for LNE, its affiliates, and their respective agents, employees, contractors, subcontractors, material men, suppliers, consultants, and other representatives (collectively, "LNE Parties") to enter the Property and perform contractor mobilization,prepare temporary roadways and laydown areas, install the storm water pollution prevention plan,perform earthwork grading and other various site work as set forth on Exhibit B,attached hereto and incorporated herein,(collectively,"Permitted Activities"). NOW, THEREFORE, in consideration of the sum of Ten and No/100 Dollars ($10.00), the foregoing recital and mutual covenants contained herein, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged,the City and LNE hereby agree as follows: 1. The City hereby grants to LNE the License for LNE and the LNE Parties to enter the Property to so perform such Permitted Activities. Such entry and Permitted Activities will be limited to those parts of the Property as necessary or reasonable in connection with the exercise of the License and performance of Permitted Activities and only as so authorized(to the extent such authorization is required by applicable governmental laws, rules and regulations as a condition precedent of performing such Permitted Activities) by the State of Missouri, County of Platte, City of Riverside and the Riverside Quindaro Bend Levee District and the Army Corps of Engineers,to the extent of their jurisdiction over the Permitted Activities (collectively "Governmental Authorities"). All work undertaken by or through LNE pursuant to the License shall be done in a good and workmanlike manner, and only in accordance with applicable governmental laws, rules and regulations as authorized herein. LNE shall not cause or suffer, nor permit any LNE Parties to cause or suffer,any mechanics'or materialmen's claims or liens with respect to any work performed on the Property by LNE or the LNE Parties pursuant to the License. 2. All Contracts related to the Permitted Activities("Contracts")are or will be consistent with industry standards, and shall require contractors and vendors to comply with applicable laws, rules and regulations. LNE shall acquire or cause its LNE Parties to acquire insurance consistent with the requirements of the Lease. All public infrastructure contracts ("Public Works Contracts") shall require contractors and vendors to comply with applicable laws,rules and regulations, including but not limited to applicable City Ordinances. 3. No recommendations, approvals, or other actions under this Agreement by the Mayor, City Administrator, City Project Coordinator, or any other representative of the City will in any manner cause the City to waive its sovereign immunity and bear any responsibility or liability for the design,development or construction of the Project or for any defects related thereto or any inadequacy or error therein or any failure to comply with applicable law, ordinance, rule, or regulation. Approval of any Project design, development or construction documents by the City pursuant to this Agreement will not constitute an opinion or representation as to their adequacy for any purpose other than the City's own purposes. 4. All Permitted Activities are or will be consistent with industry standards,and shall comply with applicable laws,rules and regulations. LNE shall acquire insurance to cover Permitted Activities with provisions for insurance consistent with the requirements of the Lease. 5. LNE agrees to indemnify, hold harmless, and defend the City and its governing body members,directors,officers,employees and agents(collectively,the"Indemnitees")from and against any and all claims, demands, liabilities and costs, including reasonable attorneys' fees, arising from or related to: (a)damage or injury, actual or claimed,to persons or property occurring or allegedly occurring in, on or about the Property during the exercise by or through LNE of the License rights granted hereunder;or(b) any mechanics' or materialmen's claims or liens with respect to any work performed on the Property by LNE or the LNE Parties pursuant to this Agreement during the term of the License. Notwithstanding the foregoing or anything in this Agreement to the contrary,the above agreement to indemnify,hold harmless and defend shall not apply to,and neither LNE nor any LNE Parties will have any obligation to indemnify, any Indemnitee for any claims,demands, liabilities,or costs arising from or related to: (i)any pre-existing condition of the Property or any portion thereof, or (ii) the negligence or intentional acts or willful misconduct of any Indemnitee. This provision shall survive the expiration or termination of this License. 6. Prior to commencing any Permitted Activities on the Property pursuant to the License and for so long thereafter as LNE or the LNE Parties continue in the performance of any such Permitted Activities,LNE shall maintain or cause to be maintained a policy of commercial general liability insurance, including contractual indemnity provisions, in an amount of not less than $2,000,000 (combined single limits bodily injury damage). Copies of insurance certificates evidencing the coverage required hereunder will be delivered or made available to the City upon request. 7. If LNE shall fail to keep or perform any obligation expressly required to be kept or performed by it hereunder, and fails to cure or commence and diligently pursue such cure within ten (10) days following written notice from the City to LNE specifying such and requiring that it be remedied,then the City shall have such rights and remedies as may exist at law or in equity;provided,however,in no event will either Party seek or be entitled to any special,punitive,remote,or consequential damages. 8. The License granted under this Agreement shall expire upon the earlier of: (a)the date on which the Amended Lease is fully-executed;and(b)upon a discontinuance of the Negotiations for whatever reason, either Party may terminate and/or revoke this License upon thirty (30) days' written notice from such Party given to the other. 9. Upon the termination of this License pursuant to paragraph 8(b)above,LNE shall or shall cause the Property to be appropriately graded, seeded and strawed, and all debris equipment, tools and materials to be removed from the Property,at its sole cost and expense. 2 10. The License shall be governed by the laws of the State of Missouri. 11. To the extent of any conflict arising from or out of this License, the prevailing party, whether in court or through arbitration shall be entitled to be reimbursed for its actual expenses, including, but not by way of limitation attorneys' fees and all related costs. 12. All notices required or permitted under this Agreement shall be in writing and shall be deemed effective: (i)one (1) day after deposit with Federal Express or other nationally recognized overnight courier,marked for next day delivery,addressed as set forth below;(ii)three(3)days after deposit in United States Mail if sent by registered or certified mail,return receipt requested,addressed as set forth below; or(iii)upon being sent by e-mail if followed the same or next business day by a hardcopy given pursuant to one of the other means above. All notices sent pursuant to subsection (i) or(ii) above, shall also be sent by e-mail. The notice addresses of the parties are as follows: If to the City: City of Riverside,Missouri 2950 N.W.Vivion Road Riverside, Missouri 64150 Attu: Ad died (1 S ri q,� �1!o�fl M• E-mail:lnko2Al vers;d4_n1vwov If to LNE: Live Nation Worldwide, Inc. do Live Nation 325 N. Maple Drive Beverly Hills,CA 90210 Attn: Chief Counsel-Concerts E-mail: Sheilasmall@livenation.com 13. This Agreement may be executed in one or more counterparts and exchanged by electronic mail. A signature hereto sent or delivered in .pdf format shall be as legally effective and enforceable as a signed original for all purposes. [Remainder of page intentionally blank;signatures follow.] 3 IN WITNESS WHEREOF, the Parties have executed this Early Access License Agreement effective as of the Effective Date. CITY: CITY OF RIVERSIDE,MISSOURI, a fourth-class city organized and existing under the laws of the State of Missouri By: Name: Title: Date: LNE: LIVE NATION ENTERTAINMENT,INC., a Delaware corporation By: 4% J Name: Nicholas Rumanes Title: EVP, Development- US Concerts Date: October 31, 2023 Exhibit A to Early Access License Agreement IN WITNESS WHEREOF, the Parties have executed this Early Access License Agreement effective as of the Effective Date. CITY: CITY OF RIVERSIDE,MISSOURI, a fourth-class city organized and existing under the laws of the Stat of Missouri By: Name: ,e4T+I LEEAi L- 2 5 ' Title: Mek/e2/2— Date: (1C 613e.r 21 7-1)Z3 LNE: LIVE NATION ENTERTAINMENT,INC., a Delaware corporation By: Name: Title: Date: Exhibit A to Early Access License Agreement EXHIBIT A Description of License Property Approximately 130+/- acres as generally depicted below and consisting of the following Parcel Nos: 2 3-3.0-07-000-000-003.000 2 3-3.0-07-000-000-004.000 2 3-3.0-07-000-000-005.000 2 3-3.0-07-000-000-006.000 23-3.0-07-000-000-006.001 23-3.0-07-000-000-007.000 23-3.0-07-000-000-008.000 23-3.0-07-100-001-002.000 23-3.0-07-000-000-009.000 23-3.0-07-000-000-016.000 2 3 3.0-07-000-000-015.000 III , 40 West at :I Y \ i�i� i,v;Litriilil; II777 Horizons (� ltilil-�i,.yi,il('(- , Doorlink . , •r z_ 1� , ) �/i • 11 7stPlat NW zi! ` ! - - — .:N it - 'Ij L. II: NW Irk (�N K l I) 4r ..- ,,, ,lt.;�,l, I II ,,1 1.,,,l 1•ilil�lr•� i .'• ,,..,i'.1 s ,,• i 1:,,1,1 2 (` — = ter J _ f� , 1:,t1-i11 ,l,),1 _ ',,1,,-�,,1.�1i,, 5 ,�,�,1.,',l ,�i�il ilil,l,� L. Ste,- I �� ,l`i.0,ll.,l,';G •,'iss, am irr ' '' AN.Ob. Ptt�p1l- — i„IciNWAY .':, ti �__� " .0S w'Nv�ARGOSY c .")..fit. . 0,,,‘,1;:;.,,,,,, .— "'` J,l,l,l j(,1,1, liliL,l,1.�.,1,1J ♦ / ,1,al(inI , YiP it 1,1.,1,1 -1,1,1 r_ t • Exhibit A to Early Access License Agreement