Loading...
HomeMy WebLinkAboutR-2024-045 Approving a Supplemental Agreement to the Contract w/Mcclure for Riverway Boulevard Improvements RESOLUTION NO. R-2024-045 A RESOLUTION APPROVING A SUPPLEMENTAL AGREEMENT TO THE CONTRACT WITH MCCLURE FOR RIVERWAY BOULEVARD IMPROVEMENTS WHEREAS the Riverside Board of Aldermen approved a contract for Riverway Boulevard Improvements on November 21, 2023; and WHEREAS additional services are needed for the planning and design of the Riverway Boulevard Improvements project; NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE, MISSOURI AS FOLLOWS: THAT the Riverside Board of Aldermen hereby approves a supplemental agreement between the City of Riverside and McClure, through the attached supplemental agreement; and the Mayor is authorized to execute the supplemental agreement on behalf of the City; and FURTHER THAT the Mayor, the City Administrator and other appropriate City officials are hereby authorized to take any and all actions as may be deemed necessary or convenient to carry out and comply with the intent of this Resolution and to execute and deliver for and on behalf of the City all certificates, instruments, agreements and other documents, as may be necessary or convenient to perform all matters herein authorized; and FURTHER THAT this Resolution shall be in full force and effect from and after its passage and approval. -14 ADOPTED AND PASSED this 7 day of , 2024. ldee.-40/76--<1-1—, h yor Kathleen L. ose ATTEST: Robin Kincaid, ity Clerk 1 SUPPLEMENTAL AGREEMENT NO. 1 TO ENGINEERING SERVICES CONTRACT This Supplemental Agreement is made part of an agreement dated November 21, 2023 between the City of Riverside, Missouri, and McClure for design of project STBG 3400(446). The purpose of this Supplemental Agreement is to perform additional survey and boundary for limits that extended beyond the original survey limits, design of the Highway 9 on-ramp merge area that was not included in the original agreement, wetland delineation and associated report, threatened and endangered species and migratory bird field review and associated reporting and submittals to MoDOT by Mustardseed Cultural and Environmental Services, LLC, coordination with Section 106 Cultural Resources including submittal of Review and Compliance Information Form and coordination with the State Historic Preservation Office (SHPO), public lands Section 4(f) coordination and associated submittals with MoDOT, slope stability analysis as required by MoDOT for the retaining walls under the Missouri Route 9 bridges, and rectangular rapid flashing beacon design as required due to recently approved PROWAG requirements. These additional services shall be in an amount not to exceed Fifty-Eight Thousand Two Hundred Three Dollars and Seven Cents ($58,203.07) without further authorization. The total design services shall be in an amount not to exceed Seven Hundred Forty-Eight Thousand Eight Hundred Eleven Dollars and Seven Cents ($748,811.07). Attachment A outlines the cost breakdown for this Supplemental Agreement. Supplement Agreement No. I accepted as defined herein: OWNER: CITY OF RIVERSIDE,MO ENGINEER: MCCLURE� ��,/ BY: X- ,Q� BY: Matt Eblen, PE �( er TITLE: U11/45-4) TITLE: PROJECT MANAGER DATENjout, 2,04DATE:_ April 25, 2024 ATTEST: . ,By. BY: _ Scott Port, PE TIT t y TITLE: PROJECT MANAGER DATE: a cc 'l j iz i/ DATE: April 25. 2024 U Executed by the City of Riverside on the 71 day of , , 2024. FIG. VI - 4 Revised 02-14-00 ATTACHMENT A SUPPLEMENTAL AGREEMENT NO. 1 CITY OF RIVERSIDE; RIVERWAY BOULEVARD IMPROVEMENTS PROJECT NO.STBG 3400(466) April 2024 ADDITONAL SERVICES PROVIDED BY MCCLURE Additional Design Fees Title Hours Rate Costs Project Manager III 40 $80.75 $3,230.00 Engineer III 72 $56.19 $4,045.68 Engineering Tech I 6 $26.61 $159.66 Engineering Tech II 72 $39.82 $2,867.04 Crew Chief 20 $29.76 $595.20 Crew Member 30 $26.52 $795.60 Land Surveyor 2 $37.37 $74.74 Professional Land Surveyor 27 $45.37 $ 1,224.99 Project Coordinator 16 $36.08 $577.28 Subtotal for Direct Labor $13,570.19 Payroll Overhead, estimated at 66.63% $9,041.82 General Overhead and Administration,estimated at 140.46% $19,060.69 Subtotal $41,672.70 Fixed Fee(13.1%) $5,450.37 Other Direct Costs, postage, mileage,etc. $560.00 Services provided by Subconsultant(**indicates DBE firm): Mustardseed Cultural and Environmental Services, LLC**: $5,520.00 Terracon $5,000.00 Total for Supplemental Agreement Number 1 $58,203.07 SUMMARY(Design Engineering) Original Agreement $690,608.00 Previous Supplemental Agreements $0.00 This Supplemental Agreement $58,203.07 TOTAL CONTRACT AMOUNT $748,811.07