HomeMy WebLinkAboutR-2024-055 Approving CO 1 to the Agreement w/Royal Construction Services, LLC for Riverside Pool and Restroom Improvements Revised Contract of $3,337,009. RESOLUTION NO. R-2024-055
A RESOLUTION APPROVING CHANGE ORDER 1 TO THE AGREEMENT WITH
ROYAL CONSTRUCTION SERVICES, LLC FOR RIVERSIDE POOL AND
RESTROOM IMPROVEMENTS RESULTING IN A REVISED CONTRACT AMOUNT
OF $3,337,009.00 FOR SUCH PURPOSES
WHEREAS, the City of Riverside ("City") issued an Invitation to Bid for the Riverside
Pool and Restroom Improvements(Project No.222-087, LWCF 29-01759) ("Project")which was
awarded to Royal Construction Services, LLC ("Royal") pursuant to Resolution R-2024-038;
and
WHEREAS, the Board of Aldermen finds that it is in the best interest of the City to
approve Change Order 1 to the agreement with Royal, resulting in a total revised contract
amount not to exceed$3,337,009.00.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF
THE CITY OF RIVERSIDE,MISSOURI,AS FOLLOWS:
THAT Change Order 1 to the Agreement between the City and Royal, a copy of which is
attached hereto and incorporated herein, is approved and the Mayor is authorized to execute the
same on behalf of the City. The resulting revised total contract amount shall not exceed
$3,337,009.00.
FURTHER THAT the Mayor, City Administrator and all other required city officials
are authorized to take such other actions and/or execute and deliver for and on behalf of the City
all certificates, instruments, agreements and other documents as may be deemed necessary or
convenient to carry out and comply with the intent of this Resolution.
PASSED AND ADOPTED by the Board of Aldermen of the City of Riverside,
Missouri,the 21'day of May 2024.
- • • .
•
tio1s4 . Kathleen L. ose, Mayor
•
N
Robin` inc • ,f�ity Clerk
CITY OF CHANGE ORDER NO. 1 Date Prepared: 5/16/2024
RIVERS
HISSOL,ki Contractor Name: Royal Construction Services
Project Name: Riverside Pool&Restroom Improvements Page Number. 1 of 4
Project Number: 222-087, LWCF 29-01759 Sot Pgs Attached' 3
Contract Date: 4/1/2024 The following changes to the original contract amount were required to cover cost incurred by the
Project Location: Riverside,Missouri Contractor or to reflect savings realized by the Contractor as a result of a change in the actual
constructed quantities from the estimated quantities shown on the Bid Proposal.
REQUIRED CHANGES IN PRESENT CONTRACT
Contract or Contract or Contract or New or New or New or
Line Item No. Previous Previous Previous Unit Item Description 6 Reason for Change Order Adjusted Adjusted Adjusted
Quantity Unit Price Amount Quantity Unit Price Amount
n/a 0.0 $0.00 $0.00 1 Failed cast iron sanitary vent lines found at Community Center Restroom 1.00 $4,009.00 $4,009.00
Alt#1 0.0 $0.00 $0.00 1 .Acceptance of alternate 1 for repointing&reinforcing south restroom wing elevation 1.00 $28,000.00 $28,000.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Previous Total $0.00 Adjusted Total $32,009.00
Net Change $32,009.00
Statement of Contract
Original Contract Amount $3,305,000.00
Net Amount of Previous Additions and Deductions $0.00
Net Contract Amount Prior to This Request $3,305,000.00
Amount of This Request $32,009.00
New Contract Amount $3,337,009.00
Percent Change in Contract Amount 0.97%
e
DESIGN ENGINEER: CITY OF RIVERSIDE, MISSOURI:Company: Waters Edge Aquatic Design,LLC City Engineer: #G//
L ,S -2 3 -2 Ci•
Name Printed Jeff Bartley Travis Hoo Date
Signed City Administrator: _ S. -31aLl
Date Ijr -17- Brian Korai Da \
CONTRACTOR: ON-SITE PROJECT MANAGER:
CONTRACTOR'S Certification for Change Order: ON-SITE PROJECT MANAGER Certification for Change Order:
The undersigned CONTRACTOR certifies that all changes In accordance with the Contract Documents,the on-site observations.and
described above are necessary in order for the CONTRACTOR to the data comprising this change order,the on-site project manager certifies
proceed with execution of the contract documents,and that the to the Owner that to the best of the on-site project manager's knowledge,
values stated above are correct with respect to the work information and belief the above referenced changes are necessary in order to
anticipated under this change order. proceed with the execution of the contract documents,and that the values
slated above are correct with respect to the work anticipated under this change order.
Company Royal Construction Services Company Royal Construction Services
Name Printed' J Myers.President Name Printed StevsYa ickt*Project Manager
Signed. , __ Signed
Date: M 5,2024 Date May
CITY OF
RIVERSIDE
MISSOURT
Upstream from ordinary.
2950 NW Vivion Road
Riverside, Missouri 64150
MEMO DATE: May 16, 2024
AGENDA DATE: May 21, 2024
TO: Mayor and Board of Aldermen
FROM: Noel Bennion
RE: Change Order I: Royal Construction Services, LLC
Riverside Pool and Restroom Improvements (222-087, LWCF 29-01759)
BACKGROUND: During demolition of the Community Center Restrooms, Royal uncovered some
sanitary vent piping that had failed and needed to be replaced. As part of the
bid, we requested Alternate pricing for repointing and reinforcing the south wing
wall of the pool restroom building. There are multiple locations where the
mortar is popping out from the bricks. This change order would accept the
alternate bid pricing provided by Royal for this work.
BUDGETARY IMPACT: An additional $32,009.00 is requested.
Original Contract Amount $3,305,000.00
Total of Previous Changes $0.00
Total this Change Order $32,009.00
Current Contract Total $3,337,009.00
RECOMMENDATION: Staff recommends approval of the resolution and acceptance of the change order
with Royal Construction Services, LLC.