Loading...
HomeMy WebLinkAbout2004 Approving a Final Development Plan for Land Located at Lot 2 of 40 West at Horizons, in Accordance w/the Unified Development Ordinance of the City BILL NO. 2024-033 ORDINANCE NO. CDO4 AN ORDINANCE APPROVING A FINAL DEVELOPMENT PLAN FOR LAND LOCATED AT LOT 2 OF 40 WEST AT HORIZONS, RIVERSIDE, MISSOURI, IN ACCORDANCE WITH THE UNIFIED DEVELOPMENT ORDINANCE OF THE CITY OF RIVERSIDE WHEREAS, Application No. PC24-02 was submitted to the City by Necco Coffee for approval of a Final Development Plan for construction of a 39,721 sq. ft. office and warehouse building ("Development Plan") located on an approximately 2.74 acre tract of land at Lot 2 of 40 West at Horizons, Riverside, Missouri; WHEREAS, the Planning Commission held a meeting on June 13, 2024 to consider said application and recommended that the Development Plan be approved; and WHEREAS, the Board of Aldermen find it to be in the best interests of the City in order to further the objectives of economic development of the City, as well as in furtherance of the objective to protect the health, safety, and welfare of the businesses and citizens of the City, to approve the Development Plan as set forth herein. NOW THEREFORE, BE IT ORDAINED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE, MISSOURI, AS FOLLOWS: SECTION 1 — BEST INTEREST OF THE CITY TO APPROVE DEVELOPMENT PLAN. It is in the best interests of the City in order to further the objectives of economic development of the City, as well as in furtherance of the objective to protect the health, safety, and welfare of the businesses and citizens of the City, to approve the Development Plan, attached hereto as Exhibit A and incorporated herein, for development of property located at Lot 2 of 40 West at Horizons, Riverside, Missouri, and legally described as Lot 2 of 40 West at Horizons and such Development Plan is hereby approved, subject to the conditions provided herein, to allow for the construction of a commercial building according to such plan. SECTION 2 — CONDITIONS OF APPROVAL. The following conditions of approval shall apply with regard to the Development Plan approved for development of the property: 1.The approval of the Development Plan does not relieve the developer from compliance with all other applicable local, state and federal laws, codes, ordinances, and regulations. The developer is required to request and obtain approval for all necessary permits to begin constructing the development. WA 6324022.1 SECTION 3 — AUTHORITY GRANTED. The Mayor, the City Administrator, and other appropriate City officials are hereby authorized to take any and all actions as may be deemed necessary or convenient to carry out and comply with the intent of this ordinance to execute and deliver for and on behalf of the City all certificates, instruments, agreements and other documents, as may be necessary or convenient to perform all matters herein authorized. SECTION 4 — EFFECTIVE DATE. This ordinance shall be in full force and effect from and after the date of its passage and approval. BE IT REMEMBERED that the above was read two times by heading only, PASSED AND APPROVED by a majority of the Board of Aldermen and APPROVED by the Mayor of the City of Riverside, Missouri, this 18th day of June, 2024. . ., . Ka leen L. Rose, Mayor ATT T: Robin Kincaid, City Clerk 2 EXHIBIT A FINAL DEVELOPMENT PLAN 1/71"z l '''' ,,,�r 614 : 1.34..7.---."-I i rifillo «.onw t MUM nST qT for 8 �..�— ..,.. . + ���. !�� ` NOW 1 1 M 1 '•'^f"' LOT OM.Rr+s ���! f f E 1 .AE /11+j91t STRUT ... 1UTH 1 — __,_-_ _. —_... _. _ T err..�iAll lama, -.. r.. ....cm cc Mlf[tIM•.re - T-. _—_--—.-i!Ifl Off�IiUt___._—-._ �� � .ie . _p 1 3 D � ' r. $ •'E , 1 • • • • • qg $7y 4 41 rr r 4 43. 41 •. • rr41. : r 0 Arm n 0 Z 1.10N - III Proposed Building For --- scharhag Necco Coffee Company 5636 Central Kansas Cry Mc 64113 40th Street,Riverside,MO Pnone 816-9'4-5165 scre Aragacn@9mail.com • �. ,:_ , III.111111111 I I r111r Fri j Necco Coffee Company Copyright 2024 Herman A.Scharhag Co.,Architects All Rights Reserved.No part of these drawings may be reproduced in any form or by any electronic or 40th Street,Riverside,MO 05.30.2024 mechanical means,without written permission. CITY OF City of Riverside RIVERS Staff Analysis Report MISSOURI Case Number PC24-02, Final Development Plan Upstream from ordinary. Lot 2, 40 West- Necco Coffee General Information Applicant: Necco Coffee Location: Lot 2,40 West Application: Final Development Plan Site Area: 119,426 sq.ft. (2.74 Acres) Building Size: Proposed Building 39,721sq.ft. Zoning: PD Planned Development Existing Land Use: Vacant Proposed Land Use: Office/Warehouse Procedure: Final Development Plan will be reviewed by the Planning Commission and the Board of Aldermen for approval. Project Overview: The applicant is proposing to construct a new 39,721 sq.ft. office/warehouse building on Lot 2 of 40 West. The applicant has outgrown their space in Belgium Bottoms Business Park and is looking to expand while remaining in Riverside. Site Layout: The proposed building will be pushed toward the west side of the property with the front entrance facing south to NW 40`" Street. Access to the site will be off newly constructed 40th street. The site will have two access points,both off NW 40th Street,one will be toward the east of the property and one will be toward the west of the property. Infrastructure Sanitary Sewer: Sanitary sewer exists on the south side of 40th Street and is stubbed under the road to the site. Water: Water is available on the south side of 40th Street and is stubbed under the road to the site. Gas: Gas is available on the north side of 40th Street. Electric: Electric is available on the east side of NW Mattox Road. Stormwater: Stormwater from the property will be routed to the City's regional detention system. Loading& Parking Areas: General parking and the main entrance are located on the south side of the building. The applicant is required to provide 40 parking spaces(1 per 1,000 sq.ft.) and they are proposing 67 spaces. Three loading dock doors are proposed for the east side of the building. Landscaping: The approved PD regulations note four components of landscaping. - Building frontage at the street(1 tree/40 ft of street frontage) - Building foundation(groundcover, shrubs and ornamental trees)main entrance and around the vehicular parking area near the main entrance. - Parking lots(1 tree/200 s.f.of parking lot islands) Page 1 of 2 Staff will work with the applicant to develop a landscaping plan that complies with the approved landscaping requirements set forth in the PD regulations. Building Elevations: The building will be constructed of concrete. Lighting: Lighting will be provided in the parking lot via wall mounted lights. Signage: The applicant is proposing signage on the south elevation over their main entrance. Outdoor Storage: The applicant is not proposing any outdoor storage. Analysis Comprehensive Master Plan: Throughout the development of the Comprehensive Plan it was articulated by participants that improving community image/character and the quality and design of buildings was a key concern. The proposed project represents a continuation of the work going on in the Horizons Area and will integrate well with the quality industrial buildings already constructed in Horizons. Generally,the proposed development plan is consistent with the site layouts, construction style,methods and architecture on the west side of Horizons Parkway. Recommendation The final development meets the standards of the UDO and approved PD regulations. Attachments • Location Map • Site Plan • Building Elevations Page 2 of 2