Loading...
HomeMy WebLinkAboutR-2024-086 Approving CO1 to the Agreement w/Bellante LLC for Gatewoods Flood Benching Project Revised Contract Amount of $164,730.36 RESOLUTION NO. R-2024-086 A RESOLUTION APPROVING CHANGE ORDER 1 TO THE AGREEMENT WITH BELLANTE LLC FOR GATEWOODS FLOOD BENCHING PROJECT RESULTING IN A REVISED CONTRACT AMOUNT OF $164,730.36 FOR SUCH PURPOSES WHEREAS, the City of Riverside("City") issued an Invitation to Bid for the Gatewoods Flood Bencing Project (Project 538-024) ("Project") which was awarded to Bellante LLC pursuant to Resolution R-2024-042; and WHEREAS, the Board of Aldermen finds that it is in the best interest of the City to approve Change Order 1 to the agreement with Bellante LLC resulting in a total revised contract amount not to exceed $164,730.36. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE, MISSOURI, AS FOLLOWS: THAT Change Order 1 to the Agreement between the City and Bellante LLC a copy of which is attached hereto and incorporated herein, is approved and the Mayor is authorized to execute the same on behalf of the City. The resulting revised total contract amount shall not exceed $164,730.36. FURTHER THAT the Mayor, City Administrator and all other required city officials are authorized to take such other actions and/or execute and deliver for and on behalf of the City all certificates, instruments, agreements and other documents as may be deemed necessary or convenient to carry out and comply with the intent of this Resolution. PASSED AND ADOPTED by the Board of Aldermen of the City of Riverside, Missouri, the 2"d day of July 2024. Kath een L. Rose, Mayor .ATTEST: • RbpinlKiri ai ;;City CITY OF CHANGE ORDER NO. 1 Date Prepared:6/27/2024 RIVERS Contractor Name: Bellante LLC Project Name: Gatewoods Flood Benching Page Number. 1 of 1 Project Number: 538-024 #of Pgs Attached contract Date: 3/18/2024 The following changes to the original contract amount were required to cover cost incurred by the Project Location: Riverside,Missouri Contractor or to reflect savings realized by the Contractor as a result of a change In the actual constructed quantities from the estimated quantities shown on the Bid Proposal. REQUIRED CHANGES IN PRESENT CONTRACT Contract or Contract or Contract or New or New or New or Line Item No. Previous Previous Previous Unit Item Description Adjusted Adjusted Adjusted Quantity Unit Price Amount Quantity Unit Price Amount 4 6,300.0 $16.58 $104,454.00 CY Excavation 7,417.00 $16.58 $122,973.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Previous Total $104,454.00 Adjusted Total $122,973.86 Net Change $18,519.86 Statement of Contract Original Contract Amount $146,210.50 Net Amount of Previous Additions and Deductions $0.00 Net Contract Amount Prior to This Request $146,210.50 Amount of This Request $18,519.86 New Contract Amount $164,730.36 Percent Change in Contract Amount 12.67% DESIGN ENGINEER: CITY OF RIVERSIDE,MISSOURI: / // J Company 1(/�C - -/ --. City Engineer: Name Panted_ Travis Hoover Signed:_ City Administrator: aim 3IA Date: Brian Koral CONTRACTOR: ON-SITE PROJECT MANAGER: CONTRACTOR'S Certification for Change Order: ON-SITE PROJECT MANAGER Certification for Change Order: The undersigned CONTRACTOR certifies that all changes In accordance with the Contract Documents,the on-site observations,and described above are necessary in order for the CONTRACTOR to the data comprising this change order,the on-site project manager certifies proceed with execution of the contract documents.and that the to the Owner that to the best of the on-site project managers knowledge, values stated above are correct with respect to the work information and belief the above referenced changes are necessary In order to anticipated under this change order. proceed with the execution of the contract documents,and that the values ��33��� QQ /4 stated above are correct with respect to the work anticipated under this change order. Company: '�VtG 4L` _ r C Company: A� Name Panted. Name Printed: Signed: _���.�/' /` f __ Signed: // Date: r>r�j l7/ Date: 1./�-l/ 1� CITY OF RIVERSIDE MISSOUR- Upstream from ordinary. 2950 NW Vivion Road Riverside, Missouri 64150 MEMO DATE: June 27, 2024 AGENDA DATE: July 2, 2024 TO: Mayor and Board of Aldermen FROM: Travis Hoover RE: Change Order I (Final): Bellante LLC Gatewoods Flood Benching (538-024) BACKGROUND: The Gatewoods Flood Benching Project was approved on 04-16-24 and consists of removing imported fill from the old Drive-In theater to improve the Jumping Branch Floodway. Project changes include: • A Line Item overrun for excavation due to more dirt being removed than originally planned. BUDGETARY IMPACT: Approximately $164,730.36 will be expended out of the Jumping Branch Stormwater Upgrades budget for completion of this project. Original Contract Amount $146,210.50 Total of Previous Changes $0.00 Total this Change Order $18,519.86 Current Contract Total $164,730.36 RECOMMENDATION: Staff recommends approval of the resolution and acceptance of the change order with Bellante LLC to complete the contract for the Gatewoods Flood benching Project.