Loading...
HomeMy WebLinkAbout2063 Approving a Final Development Plan for Riverside Soccer Lot 5 BILL NO. 2025-019 ORDINANCE NO. 2063 AN ORDINANCE APPROVING A FINAL DEVELOPMENT PLAN FOR RIVERSIDE SOCCER LOT 5, RIVERSIDE, MISSOURI, IN ACCORDANCE WITH THE UNIFIED DEVELOPMENT ORDINANCE OF THE CITY OF RIVERSIDE WHEREAS, Application No. PC25-03 was submitted to the City by KC WFC Training, LLC.for approval of a Final Development Plan for construction of a soccer pitch, seating and associated structures. ("Development Plan") located on an approximately 8-acre tract of land of Riverside Soccer Lot 5, Riverside, Missouri; WHEREAS, the Planning Commission held a meeting on March 3, 2025 to consider said application and recommended that the Development Plan be approved; and WHEREAS, the Board of Aldermen find it to be in the best interests of the City in order to further the objectives of economic development of the City, as well as in furtherance of the objective to protect the health, safety, and welfare of the businesses and citizens of the City, to approve the Development Plan as set forth herein. NOW THEREFORE, BE IT ORDAINED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE, MISSOURI, AS FOLLOWS: SECTION 1 — BEST INTEREST OF THE CITY TO APPROVE DEVELOPMENT PLAN. It is in the best interests of the City in order to further the objectives of economic development of the City, as well as in furtherance of the objective to protect the health, safety, and welfare of the businesses and citizens of the City, to approve the Development Plan, attached hereto as Exhibit A and incorporated herein, for development of property legally described as and located at Lot 5 of Riverside Soccer, Riverside, Missouri and such Development Plan is hereby approved, subject to the conditions provided herein, to allow for the construction of a soccer facility according to such plan. SECTION 2 — CONDITIONS OF APPROVAL. The following conditions of approval shall apply with regard to the Development Plan approved for development of the property: 1.The approval of the Development Plan does not relieve the developer from compliance with all other applicable local, state and federal laws, codes, ordinances, and regulations. The developer is required to request and obtain approval for all necessary permits to begin constructing the development. WA 6324022.1 SECTION 3 — AUTHORITY GRANTED. The Mayor, the City Administrator, Special Counsel to the City, and other appropriate City officials are hereby authorized to take any and all actions as may be deemed necessary or convenient to carry out and comply with the intent of this ordinance to execute and deliver for and on behalf of the City all certificates, instruments, agreements and other documents, as may be necessary or convenient to perform all matters herein authorized. SECTION 4 — EFFECTIVE DATE. This ordinance shall be in full force and effect from and after the date of its passage and approval. BE IT REMEMBERED that the above was read two times by heading only, PASSED AND APPROVED by a majority of the Board of Aldermen and APPROVED by the Mayor of the City of Riverside, Missouri, this 4th day of March, 2025. K hleen L. Rose, Mayor ATTEST: Robin Kincaid, City Clerk 2 WA 6324022.1 EXHIBIT A FINAL DEVELOPMENT PLAN _.._ DEVELOPMENT SUMMARI TABLE ..____ MOONS — t : I ''.3 o......... c.. / / !®®�� i / 1 '- - � I J` '} P4� e"/ ;7 ri y Q AtkM AMYbnt fY ••• ea 3 WA 6324022.1 EXHIBIT B LEGAL DESCRIPTION Lot 5 of Riverside Soccer 4 WA 6324022.1 CITY OF __RIVERSIDE City of Riverside MiSSOUR` Staff Analysis Report Upstream from ordinary. Case Number PC25-02, Final Development Plan Horizons East Soccer General Information Applicant: KC WFC Training, LLC Location: Lot 5 Riverside Soccer Application: Final Development Plan Zoning: PD- Planned Development Existing Land Use: Undeveloped Proposed Land Use: Soccer pitch, seating, and associated buildings. Final Development Plan: Final Development Plan will be reviewed by the Planning Commission and the Board of Aldermen for approval. Site Area: 7.86 acres Building Size: TBD Analysis Site Layout: The proposed site is undeveloped. The property is bound to the north by the KC Current Training Facility. The property to the east, south, and west are undeveloped at this point but are planned for future soccer pitches and other supporting development. The applicant is proposing a single grass pitch. This pitch will have approximately 2,000 fixed seats on the west side with the ability to expand searing to the south if needed in the future. The applicant is anticipating constructing two buildings to the north of the pitch in the future to support the needs of this pitch. Parking: The applicant has provided 89 paved parking stalls. The grass area to the south of the pitch will be used as temporary parking for large events for the first 24 months of operations after the final certificate of occupancy is issued. After that time the applicant will have to submit a permanent parking plan to the City for approval. Infrastructure: Sanitary Sewer: Sanitary sewer connection is available on the east side of NW Canal Street. Water: Water connection is available on the east side of NW Canal Street. Gas: Gas connection is available on the east side of NW Canal Street. Electric: Electric connection is available on the east side of NW Canal Street. Telecommunication: Telecommunication/fiber optics is available along the east side of NW Canal Street. Page 1 of 2 Stormwater: Stormwater from this site will be conveyed offsite to the city regional detention system. Runoff will be directed to the detention pond to the east of the site. Building Design: The applicant is proposing two future buildings. At this time,they have not determined the specific designs. Future building plans will be reviewed by the City to ensure compliance with the approved Planned Development regulations for Riverside Soccer. Outdoor Storage: There is no outdoor storage proposed for this development. Landscaping: Landscaping has been designed in accordance with our existing PD regulations. The applicant has provided an acceptable mixture of street trees, and planting beds. Signage: Site signage will include signage on and around the pitch as well as a large video messaging board located on the south side of the pitch. Comprehensive Plan: The new 2024 Comprehensive Plan identified this area specifically for commercial recreation and entertainment building on the existing KC Current training facility. This small scale stadium compliments the existing KC Current training facility and will add to the potential of future development on adjacent property. Recommendation Staff finds the application in conformance with the intent set forth in the UDO and the goals established in the Comprehensive Plan and therefore recommends approval of the application. Attachments • Final Development Plan: Site Plan • Location Map Page 2 of 2