Loading...
HomeMy WebLinkAbout2025-06-26 Planning & Zoning Commission Packet MINUTES REGULAR MEETING PLANNING AND ZONING COMMISSION RIVERSIDE, MISSOURI Thursday, March 27, 2025 6:30 p.m. The Planning and Zoning Commission for the City of Riverside, Missouri, met in regular session at Riverside City Hall, 2950 NW Vivion Road, Riverside, Missouri. The meeting was called to order at 6:30 p.m. Answering roll call were Gale Perkins, Richard Lanning, Al Bowman, Mike Soler and Matthew Christopher. City Planner Sarah Wagner and Community Admin Assistant Rhonda Smith were present. Mick Slutter from Renaissance Infrastructure Consulting was also present. Members absent were Elise Grosdidier, Mike Lombardo and Mayor Kathy Rose. Approval of Minutes of March 3, 2025. Commissioner Soler moved to approve the minutes of March 3, 2025, seconded by Commissioner Christopher. Motion passed 5-0. Final Plat – Riverside Amphitheater City Planner Sarah Wagner presented the staff report. She noted that the city was re-platting 11 vacant lots into two lots and one tract. Lot 2 will be reserved for future Live Nation commercial retail development and Tract A is reserved for detention/retention and a park. The city will remain the owners. Commissioner Lanning moved to approve Final Plat – Riverside Amphitheater and recommend to the Board of Alderman, seconded by Commissioner Christopher. Motion passed 5-0. Final Plat – Pruett Estates City Planner Sarah Wagner presented the staff report. She noted that 4557 – 4559 High Drive is currently three lots. The Pruett family is requesting change to two lots. All requirements for the city have been met. Commissioner Christopher moved to approve the Final Plat – Pruett Estates and recommend to the Board of Alderman, seconded by Commissioner Soler. Motion passed 5-0. Adjourn Commissioner Lanning moved to adjourn at 6:40 p.m. Commissioner Christopher seconded and the meeting was adjourned 5- 0. __________________________ Rhonda Smith Community Development Admin Page 1 of 2 City of Riverside Staff Analysis Report Case Number PC25-06, Final Development Plan Soccer Performance Center General Information Applicant: KC WFC Training, LLC Location: 5000 NW Canal Street Application: Final Development Plan Zoning: PD- Planned Development Existing Land Use: Undeveloped Proposed Land Use: Athletic Performance Center Final Development Plan: Final Development Plan will be reviewed by the Planning Commission and the Board of Aldermen for approval. Site Area: 19.95 acres Building Size: 13,415 square feet. Project Overview The applicant is proposing a single-story athletic performance center to support the KC Current's training needs. The facility will complement the existing KC Current Training Facility to the north and the under-construction mini stadium to the south. Future plans for the surrounding area include additional soccer fields and related development. Site Layout • The site is currently undeveloped. • Adjacent uses: o North: Existing KC Current Training Facility o South: Under-construction mini stadium o East & West: Planned for future development (soccer-related) Parking • 89 paved parking spaces, including 4 ADA-accessible spaces • Parking will be gated/controlled access Page 2 of 2 Utilities & Infrastructure • Sanitary Sewer: Available on the east side of NW Canal Street • Water, Gas, Electric, and Fiber: All available on the east side of NW Canal Street • Stormwater: Runoff will be directed to the regional detention system located east of the site Building Design • Design is consistent with the neighboring KC Current Training Facility • Material breakdown: o 46% Metal Panels o 25% Painted CMU (concrete masonry unit) o 27% Glass Windows o 2% Wood Accents Landscaping • Complies with existing PD requirements • Includes street trees and planting beds for visual appeal Signage • One wall sign proposed on the west elevation, consistent with PD regulations Outdoor Storage • No outdoor storage proposed Comprehensive Plan The 2024 Comprehensive Plan designates this area for commercial recreation and entertainment. This proposed facility aligns with that vision by enhancing the capabilities of the existing training campus and encouraging further development nearby. Recommendation Staff finds that the Final Development Plan meets the requirements of the Unified Development Ordinance and supports the goals of the Comprehensive Plan. Staff recommends approval. Attachments • Final Development Plan: Site Plan • Elevations • Landscaping Plan