HomeMy WebLinkAboutR-2025-154 Horizons Parkway and Music Blvd Intersection ImprovementsRESOLUTION NO. R-2025-154 A RESOLUTION AWARDING THE BID FOR THE HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS AND APPROVING THE AGREEMENT BETWEEN THE CITY AND CUSTOM LIGHTING SERVICES LLC DBA BLACK AND MCDONALD FOR SUCH PROJECT WHEREAS, the City issued a request for bids for the construction of improvements for the Horizons Parkway and Music Boulevard Intersection Improvements (Project No. 620-228) ("Project'); and WHEREAS, the City received three (3) responses to its request for bid and the proposal submitted by Custom Lighting Services LLC dba Black and McDonald. ("Black and McDonald") in the amount of $498,632.70 has been evaluated by the City and recommended as the most advantageous proposal for performance of the project; and WHEREAS, the Board of Aldermen find it is in the best interest of the City to enter into a contract with Black and McDonald to perform the Project; NOW THEREFORE BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE MISSOURI AS FOLLOWS THAT the proposal of Black and McDonald for the Project in the amount of $498,632.70 is hereby accepted and approved; and FURTHER THAT an agreement by and between the City of Riverside and Black and McDonald in substantially the same form as attached hereto in Exhibit "A" and incorporated herein by reference is hereby authorized and approved; and FURTHER THAT the project is subject to the requirements of Section 292.675 RSMo, which requires all contractors or subcontractors doing work on the project to provide, and require its on -site employees to complete, a ten (10) hour course in construction safety and health approved by the Occupational Safety and Health Administration (OSHA) or a similar program approved by the Missouri Department of Labor and Industrial Relations which is at least as stringent as an approved OSHA program. Such training must be completed within sixty (60) days of the date work on the Project commences. On -site employees found on the worksite without documentation of the required training shall have twenty (20) days to produce such documentation; and FURTHER THAT the Mayor, City Administrator, City Attorney, and Finance Director are hereby authorized to execute all documents and agreements necessary or incidental to carry out the terms and conditions of such bid award and the City Clerk is authorized to attest thereto. PASSED AND ADOPTED by the Board of Aldermen and APPROVED by the Mayor of the City of Riverside Missouri the 7th day of October, 2025. ATTEST: Melissa ,McChesney. City Clerk Kathleen L. Rose, Mayor EXHIBIT "A" Horizons Parkway and Music Boulevard Intersection Improvements Project Manual PROJECT MANUAL HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS PROJECT NO: 620-228 The City of Riverside, Missouri August 21, 2025 TABLE OF CONTENTS DIVISION 0 - BIDDING AND CONTRACT DOCUMENTS ADVERTISEMENT FOR BIDS INFORMATION FOR BIDDERS BID FOR UNIT PRICE CONTRACT BID FORM BID BOND EXPERIENCE QUESTIONAIRE AFFIDA VIT for WORK A UTHORIZATION AGREEMENT EXHIBIT A PERFORMANCE BOND EXHIBIT B PAYMENT BOND EXHIBIT C MAINTENANCE BOND EXHIBIT D STATE PREVAILING WAGE RATES MISSOURI EXHIBIT E TIME FOR COMPLETION EXHIBIT F SCOPE OF WORK EXHIBIT G TECHNICAL SPECIFICATIONS EXHIBIT H NOTICE TO PROCEED EXHIBIT I EXAMPLE - APPLICATION FOR PAYMENT FORM EXHIBIT J EXAMPLE - CHANGE ORDER FORM EXHIBIT K CERTIFICATE OF SUBSTANTIAL COMPLETION EXHIBIT L AFFIDAVIT OF COMPLIANCE WITH THE PREVAILING WAGE LAW EXHIBIT M ANTI -DISCRIMINATION AGAINST ISRAEL ACT CERTIFICATION EXHIBIT N CONTRACTOR AFFIDAVIT FOR FINAL PAYMENT EXHIBIT O SUBCONTRACTOR AFFIDAVIT FOR FINAL PAYMENT EXHIBIT P ENGINEER/CONSULT. CERT. for Acceptance & Final Payment SPECIFICATIONS DIVISION 1— GENERAL REQUIREMENTS Section Description 01015 ONTRACTOR USE OF PREMISES iPECIAL 01030 CONDITIONS 01040 COORDINATION 01270 MEASUREMENT AND PAYMENT 01310 JOB SITE ADMINISTRATION 01330 SUBMITTALS 01410 TESTING LABORATORY SERVICES 01524 WASTE AREA, MATERIAL STORAGE AND SITE APPEARANCE DIVISION 2 — SITEWORK Section Description 02350 EROSION AND SEDIMENT CONTROL 02510 ASPHALT PAVEMENTS 02520 PORTLAND CEMENT CONCRETE PAVING DIVISION 3 — PROJECT SPECIAL PROVISIONS Section Description I ENERAL REQUIREMENTS 2 AWING 3 TRAFFIC SIGNAL INSTALLATION (HORIZONS PKWY AND NW MUSIC LVD) 4 REMOVING EXISTING SIGNS 5 EMPORARY TRAFFIC CONTROL 6 ONTRACTOR CONSTRUCTION STAKING DIVISION 0 - BIDDING AND CONTRACT DOCUMENTS CITY OF RIVERSIDE, MISSOURI ADVERTISEMENT FOR BIDS Separate sealed bids for the HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS (PROJECT NO: 620-228) will be received by the City Clerk at Riverside City Hall, 2950 NW Vivion Road, Riverside, Missouri until 10:00 A.M., on Thursday, September 11, 2025and then publicly opened and read aloud at Riverside City Hall. The Information for Bidders, Form of Bid, Agreement, Plans, Specifications, and Forms of Bid Bond, Performance and Payment Bond, and other Contract Documents may be examined at the office of the City Engineer at the above city hall address. Copies may be obtained at the office of Drexel Technologies, Inc. Planroom, located at 10840 W. 86th Street, Lenexa, KS. 66214, (913) 371-4430. Such documents will be at the contractor's expense. Such fee shall be non-refundable. Contract documents can also be viewed or downloaded at(bttl2s://planroom.drexeltech.com). The Information for bidders and advertisement can be viewed on the City of Riverside's website https://www.riversidemo.kovfbids. The City reserves the right to waive any informality or to reject any or all bids. Dated: August 21, 2025 CITY OF RIVERSIDE. MISSOURI INFORMATION FOR BIDDERS The City of Riverside, Missouri (the "City") invites sealed bids on the forms contained in the Bid Package and Contract Documents for the HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS (Project No. 620-228) 1. Receipt and Openine of Bids. Bids will be received by the City at the office of the City Clerk, Riverside City Hall, 2950 NW Vivion Road, Riverside, MO 64150. until 10:00 a.m. on September 11, 2025, at which time all sealed bids will be publicly opened and read in the presence of one or more witnesses. The envelope(s) containing the bids must be sealed, clearly marked on the outside of the envelope "HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS (Project No. 620-228)" and addressed to the City Clerk at Riverside City Hall. The City reserves the right to award the contract by sections, to accept or reject any and all bids, to waive any technicalities or irregularities therein, to determine in its sole discretion the lowest responsive and responsible bidder, and to award the contract on such basis. Any bid may be withdrawn at the request of the bidder for return of the bid packet submitted by filing a written request with the City Clerk prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No bidder may withdraw a bid within 90 days after the actual date of the opening thereof without forfeiture of the Bid Security. 2. There will not be a Pre -Bid Meetine. 3. Reiection of all Bids. If the City rejects all Bids, the City may: (1) re -advertise or re -solicit Bids following the City's normal bidding procedure; or (2) use an expedited Bid submission schedule when the City determines that the delay would not be in the best interest of the project or the City. BIDDER AGREES THAT REJECTION SHALL CREATE NO LIABILITY ON THE PART OF THE CITY BECAUSE OF SUCH REJECTION, AND THE SUBMISSION OF ANY BID IN RESPONSE TO THIS INVITATION SHALL CONSTITUTE AN AGREEMENT OF THE BIDDER TO THESE CONDITIONS. 4. Preparation and Submission of Bid. Each bid must be submitted on the prescribed form(s) and accompanied by: (1) Qualifications of Bidder (Experience Questionnaire) with Certificate of Good Standing (2) Affidavit of Work Authorization with E-Verify attached (2 pages) (3) Bid Bond (4) Bid Form All blank spaces for bid prices must be filled in, in ink or typewritten, and the foregoing Certifications must be filly completed and executed when submitted. On alternate items for which a bid is not submitted, a written indication of "no bid" on the bid form is required. No oral, electronic, facsimile or telephonic bids or alterations will be considered. A complete set of the bidding documents are on file for examination at the office of the City Engineer at Riverside City Hall. A copy of the bidding documents may be obtained from Drexel Technologies, Inc. Planroom thttt?s:Hl)lanroom.drexeltech.cotn), located at 10840 W. 86th Street, Lenexa, KS. 66214, (913) 3714430, upon payment of a non-refundable sum for each complete set. An additional charge may apply for mailing of bidding documents. CONTRACTORS SHOULD READ AND BE FULLY FAMILIAR WITH ALL BIDDING AND CONTRACT DOCUMENTS BEFORE SUBMITTING A BID. IN SUBMITTING A BID, THE BIDDER WARRANTS THAT IT HAS READ THE BIDDING AND CONTRACT DOCUMENTS AND IS FULLY FAMILIAR THEREWITH, THAT CONTRACTOR HAS VISITED THE SITE OF THE WORK TO FULLY INFORM ITSELF AS TO ALL EXISTING CONDITIONS AND LIMITATIONS, AND CONTRACTOR HAS INCLUDED IN THE BID A SUM TO COVER THE COST OF ALL ITEMS OF THE WORK. The submission of a bid will constitute an incontrovertible representation by the bidder that the Bid Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance of the work. Bids by a corporation must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address shall be shown below the signature. Bids by a partnership must be executed in the partnership name and signed by a partner, whose title must appeat under the signature and the official address of the partnership must be shown below the signature. 5. Addenda and Interpretations. No interpretation of the meaning to the specifications, or other pre -bid documents will be made to any bidder orally. Every request for such interpretation should be addressed to: Design Engineer: Olsson. James Gallagher., jgal lagherAolsson.com with a copy to: Resident Project Representative, City of Riverside: Travis Hoover: thoove.rwriversidemo.eov and to be given consideration must be received by 5pm on September 51h, 2025 Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the Bid Documents which, if issued, will be provided at the Drexel Technologies, Inc. Planroom (https://planroom.drexeltech.com), not later than three (3) calendar days prior to the date fixed for the opening of bids. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents. Addenda may also be issued to modify the Bid Documents as deemed advisable by the City. At the time of Bid submission, each Bidder shall verify that it has considered all written addenda. No one is authorized to make any clarifications, interpretations or modifications or give any instructions to the bidders during the bidding period except as described in this Section. 6. Substitute Material and Equipment. The contract, if awarded, will be on the basis of material and equipment described in the drawings or specified in the specifications without consideration of possible substitute of "or - equal" items. Whenever it is indicated in the drawings or specified in the specifications that a substitute "or -equal" item of material or equipment may be furnished or used by Contractor if acceptable to City, application for such acceptance will not be considered by City until after the "effective date of the Agreement". 7. Subcontracts. As part of the experience questionnaire, the bidder shall submit to the City with the Bid a list of all proposed subcontractors to be used on the project. The list shall indicate those portions of the work each subcontractor will be performing. The Contractor shall also submit a list of suppliers of major materials to be used on the project. The list shall indicate which materials each supplier is furnishing. The Bidder must be capable of demonstrating to the satisfaction of City that bidder has the capability at the time of submission of the bid to manage or perform all of the Work required to be performed on the project by Contractor under the Agreement. S. Qualifications of Bidder (Experience Questionnaire). The City may make such investigations as it deems necessary to determine the ability of the bidder to perform the work, and the bidder shall furnish to the City all such information and data for this purpose as the City may request. The City reserves the right to reject any bid if the evidence submitted by, or investigation of, such bidder fails to satisfy the City that such bidder is properly qualified to carry out the obligations of the contract and to complete the work contemplated therein. Conditional bids will not be accepted. At a minimum, each Bidder must submit the following information with the Bid: Authority to Do Business in Missouri. Each bid must contain evidence of bidder's qualification and good standing to do business in the State of Missouri or covenant to obtain such qualification prior to award of the contract. Key Personnel. Identify the following Key Personnel proposed for the Project. (NOTE: Key Personnel must be committed to the Project for its duration, and may not be removed or substituted without the City's prior written consent.) GC Project Manager On -Site Field Superintendent QC/QA Manager Safety Officer For each of the Key Personnel, provide the following background information: • Years of employment with current employer; • Other projects this person will be involved with concurrently with the project. • Provide professional registrations, education, certifications and credentials held by the person that are applicable to the Project. Quality Assurance/Quality Control Plan. Provide a summary of Bidder's Quality Assurance/Quality Control Plan for this project • Describe key issues that might affect the Project schedule and how Bidder proposes to address them • Provide a statement regarding all work performed two (2) years immediately preceding the date of the Bid that contains either (a) any written notices of violations of any federal or state prevailing wage statute in which prevailing wage penalties were assessed against the Bidder or paid by the Bidder, or (b) a statement that there have been no such written notices of violations or such penalties assessed Statement of Assurances. Provide affirmation of the following items: • Statement that Bidder is current on payment of Federal and State income tax withholdings and unemployment insurance payments • Statement that the Bidder has not been rescinded or debarred from any bidding, contractual, procurement or other such programs by federal state or local entities. • Statement of Bidder's litigation and/or arbitration history over the past seven (7) years including final ruling. Pending cases must be disclosed with a notation that the matter is still unresolved. • Statement of Bidder's bond history over the past seven (7) years including any incidences of failure to perform. Provide sworn affidavits as outlined in the Information to Bidders' concerning Bidder's participation in the federal work authorization program. Statement that there is no collusion or fraud with reference to illegal relationships of bidders and representatives of the City, bid pooling or strawbids 9. Bid Securitv. Each bid must be accompanied by a bid bond payable to the City for five percent (5%) of the total amount of the bid. A certified check made payable to "The Treasurer of the City of Riverside" may be used in lieu of a bid bond. Attorneys -in -fact who sign bid bonds must file with each bond a certified and effectively dated copy of their power of attorney. As soon as the bid prices have been compared, the City will return the bonds of all except the three (3) lowest responsible bidders. The bid bond of the remaining bidders will be retained by the City until the earlier of (a) the 911 day after the bid opening, or (b) execution and delivery of the Agreement together with all bonds, evidence of insurance, work authorization affidavit and other documents required under the Agreement by the bidder to whom Notice of Award is given. The Bid Security shall be forfeited to the City if the bidder to whom an award is made fails to enter into the required contract or fails to deliver the required performance or payment bonds. 10. Liquidated Damages for Failure to Enter into Agreement. If the Bidder fails or refuses to execute the Agreement and deliver such additional documentation within ten (10) days of Notice of Award, any Bid Security shall immediately become due and payable and forfeited to the City as liquidated damages. Bidders agree that this is a fair and reasonable approximation of the actual damages incurred by the City for the Bidder's failure to honor its bid and that the liquidated damages in this Section are not penal in nature but rather the parties' attempt to fairly quantify the actual damages incurred by the City for the Bidder's refusal to honor its bid. 11. Time of Completion and Liquidated Damages. Bidder must agree to commence work on or before a date to be specified in a written "Notice to Proceed" of the City and to fully complete the project by 3/31/2026. Bidder must agree also to pay as liquidated damages, the sum of $500 for each consecutive calendar day thereafter as hereinafter provided in the Agreement and Contract Documents. No time extensions will be granted, except in case of unusual (unseasonable) weather conditions or additional work requested by the City. Bidder agrees that the sum of $500 per day is a fair and reasonable approximation of the actual damages incurred by the City for the Bidder's failure to complete the project within the time outlined above and that such liquidated damages in this Section are not penal in nature but rather the parties' attempt to fairly quantify the actual damages incurred by the City for such delays. 12. Conditions of Work. Each bidder must inform himself fully of the conditions relating to the construction of the project and the employment of labor thereon. Failure to do so will not relieve a successful bidder of its obligation to furnish all material and labor necessary to cant' out the provisions of the contract. Insofar as possible the Contractor, in carrying out the work, must employ such methods or means as will not cause any interruption of or interference with the work of any other contractor. 13. Laws and Reeulations. The bidder's attention is directed to the fact that all applicable State laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout, and they will be deemed to be included in the contract the same as though herein written out in full. 14. Method of Award - Lowest Responsible Bidder. If at the time this contract is to be awarded, the lowest bid submitted by a responsible bidder does not exceed the amount of funds then estimated by the City as available to finance the contract; the contract will be awarded to the "lowest responsible bidder". if such bid exceeds such amount, the City may reject all bids or may award the contract on such items as identified by and deemed in the best interest of the City, in its sole discretion, as produces a net amount which is within the available funds. 9 Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. If this solicitation includes Bid Alternates, the City, in its sole discretion, may include any, all or none of the Alternates in determining the lowest responsible Bid. The City may include the Alternates in any combination and in any order or priority as deemed in the best interest of the City. The City may make this determination at any time after bid closing and prior to contract award. The City will act in the best interest of the City in determining whether to include any. all or none of the Alternates and the combination and priority of any Alternates selected. If additional funding becomes available after Contract award, the City may add any or all of the Alternates to the Agreement by Change Order. The City may consider the qualifications and experience of subcontractors and other persons and organizations (including those who are to furnish the principal items of material or equipment) proposed for portions of the work. Operating costs, maintenance considerations, performance data and guarantees of materials and equipment may also be considered by the City. The City reserves the right to reject any and all bids, to waive any and all informalities, and the right to disregard all nonconforming, non -responsive or conditional bids. In evaluating bids, the City shall consider the qualifications of the bidders, whether or not the bids comply with the prescribed requirements, and alternates and unit prices if requested in the Bid. The City may conduct such investigations as it deems necessary to assist in the evaluation of any bid and to establish the responsibility, qualifications and financial ability of the bidders, proposed subcontractors and other persons and organizations to do the work in accordance with the Contract Documents to the City's satisfaction within the prescribed time. The City reserves the right to reject the bid of any bidder who does not pass any such evaluation to the City's satisfaction. If the contract is to be awarded, it will be awarded to the lowest responsible bidder whose evaluation, in the sole determination by the City, indicates to the City that the award will be in the best interests of the project. 15. Obli_aation of Bidder. At the time of the opening of bids, each bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the Contract Documents (including all addenda). The failure or omission of any bidder to examine any form, instrument, or document shall in no way relieve any bidder from any obligation in respect to the bid submitted. On request, City will provide each Bidder access to the site to conduct such investigations and tests as each Bidder deems necessary for submission of his bid. 16. Federal Work Authorization Program Participation. Bidders are informed that pursuant to Section 285.530, RSMo, as a condition of the award of any contract in excess of five thousand dollars ($5,000), the successful bidder shall, by sworn affidavit and provision of documentation, affirm its enrollment and participation in a federal work authorization program with respect to the employees working in connection to the contracted services. The affidavit shall further provide that the successful bidder does not knowingly employ any person who is an unauthorized alien in connection to the contracted services. 17. Proof of Lawful Presence. RSMo 208.009 requires that contractors provide affirmative proof that the Contractor is a citizen or permanent resident of the United States or is lawfully present in the United States. Affirmative proof can be established through a Valid Driver's License; US Birth Certificate (certified with an embossed, stamped or raised seal issued by a state or local government — hospital certificates are not acceptable); US Passport (valid or expired); US Certificate of Citizenship, Naturalization or Birth Abroad; US Military Identification Card or Discharge Papers accompanied by a copy of US Birth Certificate issued by a state or local government. io 18. Safety Standards and Accident Prevention. With respect to all work performed under this contract. the Contractor shall: a. Comply with the safety standards provisions of applicable laws, building and construction codes, and the "Manual of Accident Prevention in Construction" published by the Associated General Contractors of America, the requirements of the Occupational Safety and Health Act of 1970 (Public Law 91-596), and the requirements of Section 292.675, RSMo b. Exercise every precaution at all times for the prevention of accidents and the protection of persons (including employees) and property. c. Maintain at Contractors office or other well known place at the job site, all articles necessary for giving first aid to the injured, and shall make arrangements for the immediate removal to a hospital or a doctor's care of persons (including employees), who may be injured on the job site. d. Bidders are informed that the Project is subject to the requirements of Section 292.675, RSMo, which requires all contractors or subcontractors doing work on the Project to provide, and require its on -site employees to complete, a ten (10) hour course in construction safety and health approved by the Occupational Safety and Health Administration ("OSHA") or a similar program approved by the Missouri Department of Labor and Industrial Relations which is at least as stringent as an approved OSHA program. The training must be completed within sixty (60) days of the date of work on the Project commences. On - site employees found on the worksite without documentation of the required training shall have twenty (20) days to produce such documentation. 19. Prevailing Wage. Wage rates for the project shall be not less than the prevailing wage rates for Platte County currently in effect as determined by the Division of Labor Standards of the State of Missouri, pursuant to RSMo 290.210 et seq. The Contractor will forfeit a penalty to the City of $100 per day, or portion thereof, for each worker that is paid less than the prevailing rate for any work done under the contract by the Contractor or any Subcontractor. 20. Reserved. 21. American Products. Pursuant to RSMo 34.353, any manufactured good or commodities used or supplied in the performance of the contract (or subcontract) shall be manufactured or produced in the United States, unless determined to be exempt as provided in state law. 22. Transient Employers. Pursuant to RSMo 285.230, every transient employer (employer not domiciled in Missouri) must post in a prominent and easily accessible place at the work site a clearly legible copy of the following: 1) Notice of registration for employer withholding issued by the Missouri Director of Revenue, 2) Proof of coverage for workers' compensation insurance or self-insurance verified by the Missouri Department of Revenue through the records of the Division of Workers Compensation; and 3) Notice of registration for unemployment insurance issued to such employer by the Division of Employment Security. Contractor shall be liable for a penalty of $500.00 per day until such notices required by RSMo 285.230 et seq. are posted. 23. Current Citv Business License. The successful bidder, and all subcontractors, shall obtain a current city business license prior to beginning construction. 24. Sales Tax Exemption Certificate. The City will supply the Contractor with a Project Exemption Certificate for use in purchasing materials and supplies used on the project. The Contractor shall, in preparing its bid, omit from its computed costs all sales and use taxes related to the purchase of materials or other tangible personal property incorporated into or consumed in the construction of the Project. 11 25. Non Discrimination and Equal Opportunity. Contractor shall ensure that all employees are treated equally without regard to their race, color, religion, sex, age, handicap or national origin. The City hereby notifies all bidders that socially and economically disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex, age, ancestry or national origin in consideration for an award. The City of Riverside is an equal opportunity employer and encourages minority, women and disadvantaged contractors to submit bids. 26. Security for Payment and Faithful Performance. Simultaneously with delivery of the executed contract, the Contractor shall furnish a surety bond or bonds as security for faithful performance of this contract and for the payment of all persons performing labor on the project under this contract and furnishing materials in connection with this contract. The Bond furnished by bidder shall contain the requirements and conditions set forth in and shall comply in all respects with Section 107.170 RSMo and other applicable legal requirements. The surety on such bond or bonds shall be a duly authorized surety company satisfactory to the City and shall have a rating of at least "A" from Best's in an amount equal to one hundred percent (100%) of the contract price that does not include the cost of operation, maintenance and money. Attorneys -in -fact who sign contract bonds must file with each bond a certified and effectively dated copy of their power of attorney. 27. Signing of Agreement. When City gives a Notice of Award to the successful bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement and all other Contract Documents. Within ten (10) days thereafter Contractor shall sign and deliver at least three (3) counterparts of the Agreement to City with all other Contract Documents attached and signed as required, together with the required bonds, evidence of insurance, city licenses and work authorization affidavit and documentation. Within ten (10) days thereafter City will deliver all fully signed counterparts to Contractor. The City may issue a Notice to Proceed with or at any time after delivery of signed counterparts to Contractor. 12 BID FOR UNIT PRICE To: City of Riverside, Missouri Project: HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS Project No. 620-228 Date ZOLJ Proposal of �"'`'`/� (hereinafter called "Bidder") a corporatio artnership/individual/or other entity organized and existing under the laws of the State of , a corporation/partnership/ or individual doing business as To the City of River -side, Missouri (hereinafter called "City") To Whom It May Concern: The Bidder, in compliance with your invitation for bids for the construction of the above referenced project having examined the specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, and supplies, and to construct the project in accordance with the contract documents, within the time set forth therein, and at the prices stated below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this proposal is a part. Bidder hereby agrees to commence work under this contract on or before a date to be specified in written "Notice to Proceed" of the City and to fully complete the project by 03/31/2026 as stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $500 for each consecutive calendar day thereafter that the project is not complete, as provided in the Contract Documents. Bidder agrees that the sung of $500 per day is a fair and reasonable approximation of the actual damages incurred by the City for the Bidder's failure to complete the project within the time outlined above and that such liquidated damages in this section are not penal in nature but rather the parties' attempt to fairly quantify the actual damages incurred by the City for such delays. Bidder acknowledges receipt of the following addendum(s): Bidder agrees to perform all of the project work described in the scope of work, for the unit prices contained in the attached Bid for Unit Price attached hereto. The total bid amount is: 13 The unit prices attached shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for. Changes shall be processed in accordance with Article VU of the Agreement. Bidder understands that the City reserves the right to reject any or all bids and to waive any informality in the bidding. The bidder agrees that this bid shall be good and may not be withdrawn for a period of 90 calendar days after the scheduled closing time for receiving bids. Upon receipt of written notice of the acceptance of this bid, bidder will execute the formal contract attached within 10 days and deliver a Surety Bond or Bonds as required by the Agreement. The bid security attached in the sum of 0 Dollars ($ is to become the property of the City in the event the Agreement and all Contract Documents, including the Performance and Payment Bonds are not executed within the time above set forth, as liquidated damages for the delay and additional expense to the City caused thereby. THE UNDERSIGNED BIDDER AGREES THAT REJECTION SHALL CREATE NO LIABILITY ON THE PART OF THE CITY OF RIVERSIDE, MISSOURI BECAUSE OF SUCH REJECTION, AND THE FILING OF ANY BID IN RESPONSE TO THIS INVITATION SHALL CONSTITUTE AN AGREEMENT OF THE BIDDER TO THESE CONDITIONS. (SEAL - if bid is by a corporation) NPSML Respectfully submitted: r• , Title: 41 f AWAON Street: AOf Aur City, State, Zip: 1 /XO 4�'Y/10 Phone: 0 %L " 943 —OZ 14 BID FORM BID FOR UNIT PRICE CONTRACTS (Pricing) CONTRACTOR: .J'lliln 41, A f�<� LLB 4. ,x'�ul`'`� HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION 1WROVEMENTS (PROJECT NO: 620-228) NO. BID ITEM DESCRIPTION QTY. SNIT UNIT PRICE PRICE EXTENSION IC SIGNAL INSTALLATION �o l IORIZONS PKWY AND NW 1 LS Mt I37-�0 31?5 937. SIC WAY 2 4" SOLID WHITE (PREF. 166 LF 22,Aw- 3,G 2. RMO. It SOLID SOLID WHITE CROSSWALK g30 LF �� INE PREF. THERMO.. / • 4 AVEMENT MARKING REMOVAL 1 LS /47. — &V. 5 MOVING EXISTING SIGNS I LS 1,100. — l /00 . — 6 MPORARY TRAFFIC CONTROL I LS toy. 7 IGNAL INTERCONNECT I LS ? Z . — 7-lUm - 8 CONMACTOR CONSTRUCTION $ TAKING I LS TOTAL BID 15 BID BOND (Bid Security) Bond No. 100015617-36 KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned, Custom Lighting Services, LLC dba Black & McDonald as PRINCIPAL and Travelers Casualty and Surety Company of America as SURETY, are held and firmly bound unto the City of Riverside, Missouri, ("City") in the sum of Five Percent of the Amount Bid Dollars ($ 5% of the Amount Bid ) ("Bid Security"), for the payment of which sum well and truly to be made, we hereby jointly and severally bind ourselves, our heirs, executors, successors, and assigns, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas Principal has submitted a bid dated September 11 , 20 25 , to enter into a contract in writing for the HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS (Project No. 620-228); NOW, THEREFORE, IF said Bid shall be rejected, or in the alternate, IF Principal shall not withdraw the bid within the period specified therein after the opening of bids, or, if no period be specified, within ninety (90) days after the bid opening, or in the alternate, IF said Bid shall be accepted and the Principal shall execute and deliver a contract in the form of contract attached hereto, properly completed with all attachments and requirements pertaining thereto, and shall furnish a bond for the faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, shall in all other respects perform the agreement created by the acceptance of said Bid within ten (10) days after such Contract Documents are presented to Principal for signature, or in the alternate, In the event of the withdrawal of the Bid within the period specified, or the failure to enter into such contract within the time specified, then the Bid Security shall immediately become due and payable and forfeited to the City as liquidated damages. Principal and Surety agree that this is a fair and reasonable approximation of the actual damages incurred by the City for the Principal's failure to honor its bid and that the liquidated damages in this Section are not penal in nature but rather the parties' attempt to fairly quantify the actual damages incurred by the City for the Principal's refusal to honor its bid. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way impaired or affected by the extension of the time within which the City may accept such Bid; and said Surety does hereby waive notice of any such extension. 16 d- IN WITNESS WHEREOF, the Principal and Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year set forth herein. Custom Lighting Services, LLC dba Black & McDonald 6900 Executive Drive Kansas City, MO 64120 PRTNCIPA By: -- — — (S re) Printed Name: lwo��S� Title: /9it�MtD►r/'�r/i/1— Date: September 11, 2025 I hereby certify that surety is duly licensed to issue bonds in the State of Missouri and in the jurisdiction in which the Project is located. Travelers Casualty and Surety Company of America One Tower Square Hartford, CT 06183 (860) 277-0111 SURET By:. (Signature) Printed Name: Veronica Lawver Title: Attorney -in -Fact Date: September 11, 2025 SURETY POWER OF ATTORNEY 1%, UST BE ATTACHED .f61w% TRAVELERS J Travelers Casualty and Surety Company of America Travelers Casualty and Surety Company St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the Stale of Connecticut (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Veronica Lawver of KANSAS CITY , Missouri , their true and lawful Attorney(s)-in-Fact to sign, execute, seat and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st dsy of April, 2021. l tsrlNl State of Connecticut City of Hartford ss. By: _ Robert L_ Rane , enior Vice President On this the 219t day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of sad Companies by himself as a duly authorized officer. IN WITNESS WHEREOF, I hereunto set my hand and official seal. nonR• ` My Commission expires the 30th day of June, 2026 • • $-twoAnna P Nowfk, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attomeys-in-Pact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her, and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in - Fad for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which 0 is attached I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify, that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains In full force and effect. Dated this 11th dayof September , 2025 - I �iHughes, AssiTtant Secretary To verify the authenlldty of this Power ofAttorney, please call us at 1-800-421-3880. Please refer to the above -named Atrorney(s)-ln-fact and the details of the bond to which this Power ofAttomey Is attached. EXPERIENCE QUESTIONNAIRE (To be completed by each Bidder and submitted with Bid) FAILURE TO COMPLETE THIS FORM WILL RESULT IN THE REJECTION OF THE BID. 11 ' &V10 d 40' - Coc ' y Name) (Primary eontact Name) (Address) (City, State, Zip Code) � 3-oxP /Drl okee d yacQlv., .�►,.. (Phone Number) (Fax Number) (E-mail) Federal ID Number. �3-1 ?%`i$ S2- or SSN: (Check all that apply) General Contracting ❑ Paving Traffic Signals ❑ Demolition � Electrical El Other: ❑ Earthwork ❑ Plumbing ❑ Other: Name of State(s) in which incorporated: A"W* ' Date(s) of incorporation: _ _ 01. 4+ 1 M Attach Certificate of Good Standing for State in which incorporated. If not incorporated in Missouri, also attach Certificate of Authority to do Business in Missouri. Certificate Number. CW SZo Z& 010 (o Date: _ Zo L�' Name of the following officers: A&Mt9 _ (President's Name) CCO (Secretary's Name) Type of Partnership: Date of Organization: (Vice -President's Name) 1642 ,0�41 (Treasurer's Name) 6p fo onrE General Limited 18 Association Names and addresses of all partners (use additional sheet if necessary): (Name) - (Address) - - (City, State, Zip) (Name) (Address) (City, State, Zip) How many years has your Company been in business as a contractor under your present business name? _ 5_�_ 2. List all other prior business names and locations under which you or any partner, principal or other officer of your company has ever done business: N�fr- How many years' experience in �th�e �roposed type and size of construction work has your Company had: (a) as a general contractorw ► ; (b) as a subcontractor 4. List the three most recent projects your Company has completed similar in scope to the proposed work: Proiect Name or City LF hy( -D^n✓r 01.7if Pc t ^407VY A. A41 Contact Name�/9h7N �� Phone 7/.3'�J" 1303 Contract Amount $ 4 I M ` When Completed? 1/ 2AVl Description of Work �s�t�='� �,6+�94 , G ?rT �'�'1 95 t�� a'Am4 ! A Elf,& 011ie 1�vr oo�N��- s Project Name or City g6!!E QQAA Contact Name _ . kftt5 F�04, Phone 4iV Contract Amount $ 3 (y nn When Completed? __�OZr Description of Work TIAFfk ��n1� �,r r 19 Proiect Name or City 1aT A/ 74r -s _7 O/,x.4 6f _ f Contact Name ,�_tff �fJCA+A*f Phone V3-72/- 271`t Contract Amount $ f l ''t When Completed? Description of Work T/af/YL S-Yy# `�/1'' fti1+k, rw j .97mcT�IhY 2-i�WP•AkAfJoxs� At 5. What other important projects has your Company completed? Pro iect Name or City Contact Name Contract Amount $ Description of Work Project Name or City_ Contact Name _ Contract Amount $ Description of Work __ Phone When Completed? Phone__ When Completed? 6. List at least two engineering firms with whom you have worked, and the name of the individual who was your primary point of contact: W 7. Have you ever failed to complete any work on a project or defaulted on a contract? If so, where and why? (attach additional pages if necessary) /Vto 8. Name of your Surety Company, and the name and address of your agent you expect to use in the event this contract is awarded to you: 9. What is your present bonding capacity? 10. List each and every incidence of failure to perform that resulted in a claim under a Performance or Payment Bond: A* 11. The construction experience of the Key Personnel in your Company is required. At a minimum, infornnation regarding experience and qualifications of the following positions must be provided: GC Project Manager, On -Site Field Superintendent, QC/QA Manager, Safety Officer. NAME `�C �� � Position AV&~__kJ_ �iPr /1I/imoc Years of construction experience: 30 't- Magnitude & Type of Worm GQ to S►W"., ho__Z 4' In What Capacity? l i► w %!?hemt*—�&ef It kieL Years of Employment with Contractor: _ Other projects this individual will be involved with concurrently with this project: 2-3 OTAn— A6oj&sJ Education, professional registrations, certifications and credentials held by individual applicable to the Project: 21 NAME a't' Q➢A Position --�-Ei�'E`t, Years of construction experience: Magnitude & Type of Work / `lNotLz o AiTw ihMW AYA.W/zt-r In What Capacity? bAWhMtJ (9•r 41►A44, )G"AOW Years of Employment with Contractor: Other projects this individual will be involved with concurrently with this project: Education, professional registrations, certifications and credentials held by individual applicable to the Project: NAMEN�€� r�%(t�r� --- Position I Years of construction experience: Magnitude & Type of Work► Owl In What Capacity? P` Years of Employment with Contractor: Other projects this individual will be involved with concurrently with this project: Kok e Education, professional registrations, certifications, and credentials held by individual applicable to the Project: �[is•.. �4� _S�tnt�j/,Fe�ew.v�,. �ffST, �:fl� 12. List the major items of equipment which you own, or which will be used on the project: Quantity, Description, & Capacity Age in Years 044o6 Ud2JDc1 J 22 Condition t4upw 13. List below the contracts to which your company, any principal in your company, or any prior companies owned by a principal in your company were a party during the previous seven (7) years that involved litigation of any type, arbitration, mechanics lien claim or other claim in an amount over $10,000 (include pending cases with a notation that the matter is still unresolved): 14. On a typical project, what percent of the work is completed by your own forces? 10 % What percent by subcontract? _%. List subcontractors you propose to use on this project and their responsibility in this contract. Subcontractor Name Contract Responsibilir. (1) a�� � , �` C� r�,t- 6AOUL�f�,�; ,. Address State Zip Phone Munk % of Contract 1q. 70 7 t4Or (2) 60r- fA#*er*A- sqk4h)j�� A 5- % 3 f3l Sf S, #,00t)r" fro . flMovor +-t M 0 `i 1- 94 -N� - fkuv — Address State Zip Phone Number (3) �fiVnK�.l nttr�kt�� � bN!%G+�Cr- - T190 - --- Jio tOlw�� .� /r�S !'itgf,�' GG►//� �/�-.��r?-7�'S!�1 Address state Zip Phone Number (4) Address state Zip Phone Number (5) Address State Zip Phone Number 15. Is your Company current on payment of Federal and State income tax withholdings and unemployment insurance payments? Y6 If the answer is no, please provide detail: 23 16. Has your Company, or any principal in your company, been rescinded or debarred fro I any bidding, contractual, procurement or other such programs by federal, state or local entities? ,-t_ If the answer is yes, please provide detail: 17 Has your Company received any written notices of violations of any federal or state prevailing wage statute in which prevailing wage penalties w e assessed against your Company or paid by your Company during the last two (2) years? _tw If the answer is yes, please provide the detail of each and every such notice: The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the City in verification of the recitals comprising this Experience Questionnaire and agrees to hold any such person, firm or corporation harmless for providing any such information to the City of Riverside. The undersigned agrees that there is no collusion or fraud with reference to illegal relationships of bidders and representatives of the City, bid pooling or strawbids. Dated on behalf of said Company this J-0 day of 20 By. Name: �/�/� Title State of ' -PI ' I ��.L� ) ) ss County o `4= ) BEFORE ME, the undersigned notary, personally appeared who being duly sworn, deposes and says that he or she is the i of com�[�g�G��iti/t7 , that he/she has been authorized by such toetethe foregoing statement, and that the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to me before this day of _ _ . 2012_Y— DORiS A WATSON !� • Notary Publlc, Notary seal Jacktele ofMlsuouriM C0 runission expires: Ot3�/1g Not Public Jackson Countryy Y p az5' Comminlon # 073si0073 MI CWMIU�011 [ WAS OWN2028 24 51xrfF, OF MISSpU �tesov�, Denny Hoskins Secretary of State CORPORATION DIVISION CERTIFICATE OF GOOD STANDING I, DENNY HOSKINS, Secretary of State of the STATE OF MISSOURI, do hereby certify that the records in my office and in my care and custody reveal that li . in Missoun the name CUSTOMLIGHTING SERVICES, L.L.C. CUSTOM LIGHTING SERVICES, L. L C FL0012351 a DELAWARE entity was created under the laws of this State on the 15th day of April, 1997, and is Active, having fully complied with all requirements of this office. IN TESTIMONY WHEREOF, I hereunto set my hand and cause to be affixed the GREAT SEAL of the State of Missouri. Done at the City, of Jefferson, this 15th day of January, 2025 tin-N. of Stnte Cerffnadon Number. CERT-01152025-0106 For the operation of: CUSTOM LIGHTING SERVICES 6001 E FRONT ST KANSAS CITY MO 64120-1355 III IIII Jill 1111111111ihl111ihlhl111111l 2025 01 11I 1111111 I I !I 1111 I IQflll) I II 1111 I I lii L2089727744 CID-90940291840 Electrical Contractors and Other Wiring Installation Contractors This license is effective until December 31, 2025. You have until the last day of February to renew. Pursuant to City ordinances and conditioned upon payment of the requested fee or tax due, subject to audit and zoning requirements, license is hereby granted for the term and purpose stated. 0408759424 Post at location licensed KANSAS CITY M I S S O U R I Eric Davison, Commissioner of Revenue This license may be suspended or revoked in accordance with City ordinances. This license remains the property of the City of Kansas City, MO FINANCE DEPARTMENT • REVENUE DIVISION • BUSINESS LICENSE SECTION 414 E 12th St. 1st Floor • Kansas City, MO 64106-2786 • (816) 513-1120 AFFIDAVIT for WORK AUTHORIZATION (as requited by Section 285530, Revised Statutes of NE noun) As used in this Affidavit, the following terms shall have the following meanings: EMPLOYEE: Any person performing work or service of any kind or character for hire within the State of Missouri. FEDERAL WORK AUTHORIZATION PROGRAM: Any of the electronic verification of work authorization programs operated by the United States Department of Homeland Security or an equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, under the Immigration Reform and Control Act of 1986 (IRCA), P.L. 99-603. KNOWINGLY: A person acts knowingly or with knowledge, (a) with respect to the person's conduct or to attendant circumstances when the person is aware of the nature of the person's conduct or that those circumstances exist; or (b) with respect to a result of the person's conduct when the person is aware that the person's conduct is practically certain to cause that result. UNAUTHORIZED AT, N: An alien who does not have the legal right or authorization under federal law to work in the United States, as defined in 8 U.S.C. 1324a(h)(3). State of t1Ss+�dl�1 j County of, I'liha 0i ) ss: � + r�oGA4r� BEFORE ME, the undersigned notary, personally appeared _ j who, being duly sworn, states on his/her oath or affirmation as follows: 1. My name is and I am currently the Atv* r- of rV.RM m (hereinafter "Contractor', whose business address is o ur "yo 4W o 4,VZA and I am authorized to make this Affidavit. I am of sound mind and capable of making this Affidavit, and am personally acquainted with the facts stated herein. 3. Contractor is enrolled in and participates in a federal work authorization program with respect to the employees working in connection with the following services contracted between Contractor and the City of Riverside: HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS (Project No. 620-228). 4.Contractor does not knowingly employ any person who is an unauthorized alien in connection with the contracted services set forth above. 5-Attached hereto is documentation affirming Contractor's enrollment and participation in a federal work authorization program with respect to the employees working in connection with the contracted services. Further, Affiant sayeth not '' Si Gre fAfftant - -- - 4,4 Prin ed Nauue: %� 14o � r Subscribe A VVAr� (� day of Note ry Public, Notary Seal State of Missouri Jackeon County — - Commission 0 0130W73 Potar�yP�Liblic My Commission borer 01/23/2028 'PLEASE NOTE: Acceptable enrollment and participation documentation consists of the foilowing 2 pages of the E-Verify Niemorandum of Understanding: (1) a valid, completed copy of the fast page identifying the Contractor, and (2) a valid copy of the signature page completed and signed by the Contractor. and the Department of Homeland Security — Verification_ 25 Verify Company ID Number. 220530 THE E-VERIFY MEMORANDUM OF UNDERSTANDING FOR EMPLOYERS ARTICLE 1 PURPOSE AND AUTHORITY The parties to this agreement are the Department of Homeland Security (DHS) and Custom Lighting services, LLC (Employer). The purpose of this agreement is to set forth terms and conditions which the Employer wit( follow while participating in E-Verify. E-Verify is a program that electronically confirms an employee's eligibility to work in the United States after completion of Form 1-9, Employment Eligibility Verification (Form 1-9)_ This Memorandum of Understanding (MOU) explains certain features of the E-Verify program and describes specific responsibilities of the Employer, the Social Security Administration (SSA), and DHS. Authority for the E-Verify program is found in Title IV, Subtitle A, of the Illegal Immigration Reform and Immigrant Responsibility Act of 1996 (IIRIRA), Pub. L. 104-208,110 Stat. 3009, as amended (8 U.S.C. § 1324a note). The Federal Acquisition Regulation (FAR) Subpart 22.18, "Employment Eligibility Verification" and Executive Order 12989, as amended, provide authority for Federal contractors and subcontractors (Federal contractor) to use E-Verify to verify the employment eligibility of certain employees working on Federal contracts. ARTICLE 11 RESPONSIBILITIES A. RESPONSIBILITIESOFTHE EMPLOYER 1. The Employer agrees to display the following notices supplied by DHS in a prominent place that is clearly visible to prospective employees and all employees who are to be verified through the system: a. Notice of E-Verify Participation b. Notice of Right to Work 2. The Employer agrees to provide to the SSA and DHS the names, titles, addresses, and telephone numbers of the Employer representatives to be contacted about E-Verify. The Employer also agrees to keep such information current by providing updated information to SSA and DHS whenever the representatives' contact information changes. 3. The Employer agrees to grant E-Verify access only to current employees who need E-Verify access. Employers must promptly terminate an employee's E-Verify access if the employer is separated from the company or no longer needs access to E-Verify. Page 1 of 17 E-Verify MOU for Employers ( Revision Date 06/01/13 E-Verify. • .�fn ■ A fs.o s1 / �f u c n. Company ID Number: 220530 4. The Employer agrees to become familiar with and comply with the most recent version of the E-Verify User Manual. S. The Employer agrees that any Employer Representative who will create E-Verify cases will complete the E-Verify Tutorial before that individual creates any cases. a. The Employer agrees that all Employer representatives will take the refresher tutorials when prompted by E-Verify in order to continue using E-Verify. Failure to complete a refresher tutorial will prevent the Employer Representative from continued use of E-Verify. 6. The Employer agrees to comply with current Form 1-9 procedures, with two exceptions: a. If an employee presents a "List B" identity document, the Employer agrees to only accept "List B" documents that contain a photo. (List B documents identified in 8 C.F.R. § 274a.2(b)(1)(B)) can be presented during the Form 1-9 process to establish identity.) If an employee objects to the photo requirement for religious reasons, the Employer should contact E-Verify at 888-464-4218. b. If an employee presents a DHS Form 1-551 (Permanent Resident Card), Form 1-766 (Employment Authorization Document), or U.S. Passport or Passport Card to complete Form 1-9, the Employer agrees to make a photocopy of the document and to retain the photocopy with the employee's Form 1-9. The Employer will use the photocopy to verify the photo and to assist DHS with its review of photo mismatches that employees contest. DHS may in the future designate other documents that activate the photo screening tool. Note: Subject only to the exceptions noted previously in this paragraph, employees still retain the right to present any List A, or List B and List C, document(s) to complete the Form 1-9. 7. The Employer agrees to record the case verification number on the employee's Form 1-9 or to print the screen containing the case verification number and attach it to the employee's Form 1-9. 8. The Employer agrees that, although it participates in E-Verify, the Employer has a responsibility to complete, retain, and make available for inspection Forms 1-9 that relate to its employees, or from other requirements of applicable regulations or laws, including the obligation to comply with the anti- discrimination requirements of section 274B of the INA with respect to Form 1-9 procedures. a. The following modified requirements are the only exceptions to an Employer's obligation to not employ unauthorized workers and comply with the anti -discrimination provision of the INA: (1) List B identity documents must have photos, as described in paragraph 6 above; (2) When an Employer confirms the identity and employment eligibility of newly hired employee using E-Verify procedures, the Employer establishes a rebuttable presumption that it has not violated section 274A(a)(1)(A) of the Immigration and Nationality Ad (INA) with respect to the hiring of that employee; (3) If the Employer receives a final nonconfirmation for an employee, but continues to employ that person, the Employer must notify DHS and the Employer is subject to a civil money penalty between $550 and $1,100 for each failure to notify DHS of continued employment following a final nonconfirmation; (4) If the Employer continues to employ an employee after receiving a final nonconfirmation, then the Employer is subject to a rebuttable presumption that it has knowingly Page 2 of 17 E-Verity MOU for Employers I Revision Date 06/01/13 AGREEMENT BETWEEN CITY OF RIVERSIDE, MISSOURI AND Contractor: Custom Lighting Services, LLC dba Black & McDonald FOR COMPLETION OF HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS Project No. 620-228 RESOLUTION NO.: 2025- CONTRACT PRICE: $498.632.70 26 AGREEMENT BETWEEN CITY OF RIVERSIDE AND CONTRACTOR HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS Project No: 620-228 THIS AGREEMENT, made and entered into as of the 23`d day of September, 2025, by and between the City of Riverside, Missouri ("City"), and Custom Lighting Services, LLC dba Black & McDonald ("Contractor"), shall govern all Work to be provided by Contractor for City on the Project. WHEREAS, City, under the provisions of Resolution No. 2025- , duly approved on 23`d day of September, 2025 and by virtue of the authority vested in City by the general ordinances of City, intends to enter into one or more contracts for the Project; and WHEREAS, the Mayor is authorized and empowered by City to execute contracts on behalf of City, and the City Administrator ("Administrator") is authorized to perform Administrator's functions set forth in this Agreement; and WHEREAS, Administrator may designate one or more engineers, architects, or other persons to assist Administrator in performing Administrator's functions under this Agreement; and WHEREAS, City desires to enter into an agreement with Contractor to obtain labor, services, materials, supplies, tools, equipment, supervision, management, and other items as set forth in this Agreement; and WHEREAS, Contractor represents that Contractor is equipped, competent, and able to provide all the Work, in accordance with this Agreement; NOW THEREFORE, in consideration of the mutual covenants and consideration herein contained, IT 1S HEREBY AGREED by City and Contractor as follows: ARTICLE I DEFINITIONS As used in this Agreement and the other Contract Documents, the following words and phrases shall have the respective meanings set forth below. Any capitalized terms used but not defined in this Agreement shall have the meanings given to such terms in the other Contract Documents. A. "Administrator" has the meaning set forth in the recitals of this Agreement. B. "Application for Payment" has the meaning set forth in Article VI, Paragraph A of this Agreement. C. "City" has the meaning set forth in the preamble of this Agreement. D. "Change Order" means a change to the Project, which has been approved in accordance with the terms of this Agreement, specifically including, without limitation, the requirements set forth in Article VII of this Agreement. 27 E. "Contract Amount" has the meaning set forth in Article III, Paragraph A of this Agreement. F. "Contract Documents" has the meaning set forth in Article V, Paragraph A of this Agreement. G. "Contractor" has the meaning set forth in the preamble of this Agreement. H. "Design Engineer" means the following Design Engineer to the City of Riverside, Missouri: Olsson, James Gallagher; igal lagher(d,)oisson.com. "Notice to Proceed" has the meaning set forth in Article IV, Paragraph A of this Agreement. J. "Project" means the building, facility, and/or other improvements for which Contractor is to provide Work under this Agreement. The Project may also include construction by City or others. K. "Resident Project Representative" means the following employee of the City of Riverside who shall manage the Project on behalf of the City: Travis Hoover - thooverii riversidemo.cov 816- 451-8246. L. "Subcontractor" means a person, firm or corporation supplying labor and materials or only labor for the Work for, and under separate contract or agreement with, the Contractor. M. "Substantial Completion" means the stage in the progress of the Work where the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the City can occupy or utilize the Work for its intended use. N. "Work" or "Work on the Project" means work to be performed at the location of the Project, including the transportation of materials and supplies to or from the location of the Project by employees of the Contractor and any Subcontractor. Work shall include all labor, services, materials, supplies, tools, equipment, supervision, management, and anything else necessary to accomplish the results and objectives described in Exhibit F (Scope of Work) and Exhibit G (Technical Specifications) to this Agreement and the other Contract Documents, in full compliance with all requirements set forth in the Contract Documents, subject to additions, deletions, and other changes as provided for in this Agreement. The Work may refer to the whole Project, or only a part of the Project if work on the Project also is being performed by City or others. ARTICLE II THE PROJECT AND THE WORK A. Contractor shall provide and pay for all Work for the Project. B. Contractor represents that it has evaluated and satisfied itself as to all conditions and limitations under which the Work is to be performed, including, without limitation, (1) the location, condition, layout, and nature of the Project site and surrounding areas, (2) generally prevailing climatic conditions, (3) labor supply and costs, and (4) availability and cost of materials, tools, and equipment. 28 City shall not be required to make any adjustment in either the Contract Amount or the time for performance of the Work because of Contractor's failure to do so. C. The Resident Project Representative shall act as the City's representative during the construction period, shall decide questions which may arise as the quality and acceptability of materials furnished and Work performed, and shall interpret the intent of the Contract Documents in a fair and unbiased manner. The Resident Project Representative may recommend, but cannot approve Change Orders resulting in an increase in time of performance or payments due to Contractor. The Resident Project Representative will make visits to the site and determine if the Work is proceeding in accordance with the Contract Documents. The Contractor will be held strictly to the intent of the Contract Documents in regard to the quality of materials, workmanship, and execution of the Work. Inspections may be at the factory or fabrication plant of the source of the material supply. The Resident Project Representative will not be responsible for the construction means, controls, techniques, sequences, procedures or construction safety. D. Contractor may be furnished additional instructions and detail drawings by the Resident Project Representative, as necessary to carry out the Work required by the Contract Documents. The additional drawings and instructions thus supplied will become a part of the contract drawings, and the Contractor shall carry out the Work in accordance with the additional detail drawings and instructions. ARTICLE ID CONTRACT AMOUNT A. Provided Contractor performs all Work in accordance with the Contract Documents and complies fully with each and every obligation of Contractor under the Contract Documents, City shall pay Contractor the sum of four hundred ninety-eight thousand six hundred thirty-two dollars and seventy cents ($498,632.70). This amount shall include all costs, permit fees, profit, overhead, expenses, taxes, and compensation of every kind related to the Work, and shall be referred to as the "Contract Amount." B. The Contract Amount is subject to final determination of Work performed at unit prices set forth in the Bid for Unit Price Contracts completed by Contractor. The quantities of unit price Work set forth in Contractor's Bid for Unit Price Contracts are estimates only, are not guaranteed, and are solely for the purpose of comparing bids and determining an initial Contract Amount. Unless otherwise stated elsewhere in the Contract Documents, (1) detenmination of the actual quantities and classifications of unit price Work performed will be made by City and (2) final payment for all unit price items set forth in Contractor's Bid for Unit Price Contracts will be based on actual quantities as determined by City. The Contractor is responsible for verifying the unit quantities before excavation and/or installation at the Project site. Contractor shall identify and notify, the City of any variance in unit quantities in excess of ten percent (10%) of the amount set forth in Contractor's Bid for Unit Price Contracts IN ADVANCE of performing the Work. Any increase in quantities of materials or Work performed as a result of over - excavation by Contractor will not be compensated. C. Payment of the Contract Amount shall be full compensation for all labor, services, materials, supplies, tools, equipment, supervision, management, and anything else necessary to complete the respective items in place, in full compliance with all requirements set forth in the Contract Documents. All costs, permit fees, profit, overhead, expenses, taxes, and compensation of every kind related to the Work are included in the Contract Amount. No labor, services, materials, supplies, tools, 9 equipment, supervision, management, or anything else required by the Contract Documents for the proper and successful completion of the Work shall be paid for outside of or in addition to the Contract Amount. The Work set forth in the Contract Amount shall be itemized in Contractor's Bid for Unit Price Contracts. All Work not specifically set forth in Contractor's Bid for Unit Price Contracts as a separate pay item is a subsidiary obligation of Contractor, and all costs, permit fees, profit, overhead, expenses, taxes and compensation of every kind in connection therewith are included in the Contract Amount set forth in Contractor's Bid for Unit Price Contracts. D. THIS AGREEMENT IS SUBJECT TO THE CITY ORDINANCES, AND NOTHING IN THE AGREEMENT SHALL BE CONSTRUED AS CREATING AN OBLIGATION OR DEBT BEYOND THE CITY'S FISCAL YEAR, AND IN THE EVENT THAT IT DOES, PERFORMANCE OF THE CITY'S OBLIGATIONS UNDER THE AGREEMENT IS EXPRESSLY SUBJECT TO APPROPRIATION OF FUNDS BY THE CITY YEAR-TO-YEAR DURING THE DURATION OF THE AGREEMENT. THE TOTAL PAYMENT UNDER THIS AGREEMENT SHALL NOT EXCEED THE APPROPRIATION CONTAINED IN THE APPLICABLE RESOLUTIONS OR ORDINANCES ADOPTED BY THE BOARD OF ALDERMEN AUTHORIZING THE WORK AND CONTRACTOR SHALL NOT SEEK, NOR BE ENTITLED TO, PAYMENT EXCEEDING THIS AMOUNT UNLESS CITY DIRECTS CONTRACTOR TO PERFORM ADDITIONAL WORK IN ACCORDANCE WITH THIS AGREEMENT, AND CITY ENACTS ANOTHER RESOLUTION OR ORDINANCE AUTHORIZING THE AMOUNT CITY AGREES TO PAY UNDER THIS AGREEMENT. ARTICLE IV PROGRESS OF WORK /SUBMITTALS A. COMMENCEMENT OF WORK. The date of beginning and the time for completion of the Work are essential conditions of the Contract Documents. Contractor shall commence performance of the Work on the date indicated in a written notice ("Notice to Proceed") that shall be given by City to Contractor. B. TIME FOR COMPLETION. Contractor shall achieve Substantial Completion, as defined in Article I hereof, no later than March 31, 2026. The Contractor will proceed with the Work at such rate of progress to ensure Substantial Completion within the contract time. It is expressly understood and agreed, by and between the Contractor and the City, that the contract time to achieve Substantial Completion of the Work described herein is a reasonable time, taking into consideration the average climatic and economic conditions and other factors prevailing in the locality of the Work. No extensions will be granted, except in case of unusual (unseasonable) weather conditions or additional work requested by the City under Change Order. Following Substantial Completion, Contractor shall proceed to complete all uncompleted Work items as promptly as permitted by weather conditions or any other conditions affecting completion of the Work. C. LIQUIDATED DAMAGES. If Contractor fails to achieve Substantial Completion of all the Work as set forth in the Contract Documents, Contractor shall pay City $500.00 Pgr daN, as liquidated damages and not as a penalty, for each calendar day after such date, until Substantial Completion of all the Work is achieved. Contractor agrees that the sum of S500.00 per day is a fair and reasonable approximation of the actual damages incurred by the City for the Contractor's failure to complete the Project within the time outlined above and that such liquidated damages in this section are not penal in FES nature but rather the parties' attempt to fairly quantify the actual damages incurred by the City for such delays. Recovery of liquidated damages is not City's exclusive remedy for Contractor's failure to achieve Substantial Completion in accordance with this Agreement. Specifically, but without limitation, City may exercise any of its default or termination rights under this Agreement under all circumstances described herein, including but not limited to Contractor's failure to achieve Substantial Completion in accordance with Paragraph B above. Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of the Work is due to unforeseen causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to, acts of God, or the public enemy, acts of the City, acts of another contractor in the performance of a contract with the City, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes and abnormal and unforeseeable weather provided that the Contractor has given written notice of such delay to the City within five (5) days of the event causing such delay. D. TIME OF THE ESSENCE. Time is of the essence in the performance of the Work and any other Contractor obligations under the Contract Documents. Contractor shall upon commencement of construction work daily to complete the Work except for Saturdays, Sundays, holidays, and days of inclement weather. This Paragraph does not preclude Contractor from working Saturdays, Sundays, holidays, or days of inclement weather. Contractor shall give the City at least 48 hours notice if intending to work on Saturday, Sunday, holidays or days of impending inclement weather. E. CONSTRUCTION SCHEDULE. Promptly after the execution of this Agreement, and in any event before commencing performance of the Work, Contractor shall submit to City for approval a construction schedule that specifies the dates on which Contractor plans to begin and complete various parts of the Work, including dates on which information and approvals are required from City. Upon City's written approval of the schedule, Contractor shall comply with it unless directed by City to do otherwise. Contractor shall update the schedule on a monthly basis or at more frequent appropriate intervals if required by the conditions of the Work and the Project. With each Application for Payment under Article VI of this Agreement, Contractor shall submit an updated, current schedule. Neither the original schedule nor any update shall exceed time limits for the entire Project under the Contract Documents. F. PHOTOGRAPHS OF PROJECT. The Contractor shall furnish photographs of the Project site in the number, type, and stage as enumerated below: 1. Pre -Construction photos - minimum of 15 ground level digital shots 2. Construction photos of significant changes - minimum of 15 ground level digital shots 3. Post Construction photos - minimum of 15 ground level digital shots G. DELAY IN PERFORMANCE. In the event the City determines that perfonmance of the Work is not progressing as required by the Contract Documents or that the Work is being unnecessarily delayed or will not be finished within the prescribed time, the City may, in the City's sole discretion and in addition to any other right or remedy City may have, require Contractor, at Contractor's sole cost, to accelerate Contractor's progress. Such acceleration shall continue until the progress of the Work complies with the Contract Documents and clearly indicates that all Work will be completed within the prescribed time. H. SUSPENSION OF WORK. The City may suspend the Work or any portion thereof for a period of not more than ninety (90) days or such further time as agreed upon by the Contractor, by written 31 notice to the Contractor which shall fix the date on which Work shall be resumed. The Contractor will resume the Work on the date so fixed. The Contractor will be allowed an increase in the contract price or an extension of the contract time, or boti), directly attributable to any suspension I. DRAWINGS AND SPECIFICATIONS. The intent of the drawings and specifications is that the Contractor shall furnish all labor, materials, tools, equipment and transportation necessary for the proper execution of the Work in accordance with the Contract Documents and all incidental Work necessary to complete the Project in an acceptable manner, ready for use, occupancy or operation by the City. In case of conflict between the drawings and specification, the specifications shall govern. Figure dimensions on drawings shall govern over general drawings. Any discrepancies found between the drawings and specifications and site conditions or any inconsistencies or ambiguities in the drawings or specifications shall be immediately reported to the Resident Project Representative in writing, who shall promptly correct such inconsistencies or ambiguities in writing. Work done by the Contractor after discovery of such discrepancies, inconsistencies or ambiguities shall be done at the Contractor's risk. J. SHOP DRA WINGS. Contractor shall submit to Resident Project Representative for review all shop drawings, samples, product data, and similar submittals required by the Contract Documents. Contractor shall be responsible to City for the accuracy and conformity of its submittals to the Contract Documents. Shop drawings shall bear the Contractor's certification that it has reviewed, checked and approved the shop drawings and that they are in conformance with the requirements of the Contract Documents. Contractor shall prepare and deliver its submittals to City in a manner consistent with the construction schedule and in such time and sequence so as not to delay performance of the Work. Portions of the Work requiring a shop drawing or sample submission shall not begin until the shop drawing or submission has been reviewed by the Resident Project Representative. Review of any Contractor submittal shall not be deemed to authorize deviations, substitutions, or changes in the requirements of the Contract Documents unless express written approval is obtained from City specifically authorizing such deviation, substitution, or change. When submitted for the Resident Project Representative's review, any shop drawing which substantially deviates from the requirement of the Contract Documents shall be evidenced by a Change Order. if the Contract Documents do not contain submittal requirements pertaining to the Work, Contractor agrees upon request to submit in a timely fashion to City for review by Resident Project Representative any shop drawings, samples, product data, manufacturers' literature, or similar submittals as may reasonably be required by City. Contractor shall perform all Work strictly in accordance with approved submittals. Resident Project Representative's review does not relieve Contractor from responsibility for defective Work resulting from errors or omissions of anv kind on the reviewed submittals. A copy of each shop drawing and each sample shall be kept in good order by the Contractor at the site and shall be available to the Resident Project Representative. K. MATERIALS, SERVICES AND FACILITIES. It is understood that except as otherwise specifically stated in the Contract Documents, the Contractor shall provide and pay for all materials, labor, tools, equipment, water, light, power, transportation, supervision, temporary construction of any nature, and all other services and facilities of any nature whatsoever necessary to execute, complete, and deliver the Work within the specified time. Materials and equipment shall be so stored as to insure the preservation of their quality and fitness for the Work. Stored materials and equipment to be incorporated in the Work shall be located so as to facilitate prompt inspection. Manufactured articles, materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned as directed by the manufacturer. Material, supplies and equipment shall be in accordance with samples submitted by the Contractor and approved by the Resident Project Representative. Materials, supplies or equipment to be incorporated into the Work shall not be purchased by the Contractor or by any Subcontractor subject to a chattel mortgage or under a conditional sale contract or other agreement by which an interest is retained by the seller. L. INSPECTION AND TESTING OF MATERIALS. All materials and equipment used in the construction of the Project shall be subject to adequate inspection and testing in accordance with generally accepted standards, as required and defined in the Contract Documents. The Contractor shall provide at the Contractor's expense the testing and inspection services required by the Contract Documents. The City shall provide all inspection and testing services not required by the Contract Documents. If the Contract Documents, laws, ordinances, rules, regulations or orders of any public authority having jurisdiction require any Work to specifically be inspected, tested or approved by someone other than the Contractor, the Contractor will give the Resident Project Representative timely notice of readiness. The Contractor will then furnish the Resident Project Representative the required certificates of inspection, testing approval. Inspections, tests or approvals by the Resident Project Representative or others shall not relieve the Contractor from the obligation to perform the Work in accordance with the requirements of the Contract Documents. The Resident Project Representative and the City's representatives will at all times have access to the Work. In addition, authorized representatives and agents of any participating Federal or State agency shall be permitted to inspect all Work, materials, payrolls, records or personnel, invoices of materials and other relevant data and records. The Contractor will provide proper facilities for such access and observation of the Work and also for any inspection or testing thereof. If any Work is covered prior to inspection by the Resident Project Representative it must, if requested by the Resident Project Representative, be uncovered for the Resident Project Representative's observation and replaced at the Contractor's expense. If the Resident Project Representative considers it necessary or advisable that covered Work be inspected or tested by others. the Contractor, at the Resident Project Representative's request, will uncover, expose or otherwise make available for observation, inspection or testing as the Resident Project Representative may require, that portion of the Work in question, furnishing all necessary labor, materials, tools and equipment. M. CORRECTION OF WORK. The Contractor shall promptly remove from the Project site all Work rejected by the Resident Project Representative for failure to comply with the Contract Documents, whether incorporated in the construction or not, and the Contractor shall promptly replace and re -execute the Work in accordance with the Contract Documents and without expense to the City and shall bear the expense of making good all work of other contractors destroyed or damaged by such removal or replacement. All removal and replacement Work shall be done at the Contractor's expense. If the Contractor does not take action to remove such rejected Work within ten (10) days after receipt of written notice, the City may remove such Work and store the materials at the expense of the Contractor. N. SUBSTITUTIONS. Whenever a material, article, or piece of equipment is identified on the drawings and specifications by referenced to brand name or catalog numbers, it shall be understood that this is referenced for the purpose of defining the performance or other salient requirements and that other products of equal capacitates, quality and function shall be considered. The Contractor may recommend the substitution of material, article or piece of equipment of equal substance and function for those referred to in the Contract Documents by referenced to brand name or catalog number, if, in the opinion of the City, such material, article or piece of equipment is of equal substance function to that specified, the City may approve, in writing, its substitution and use by the Contractor. Any cost 33 differential shall be deductible from the contract price and in such event the Contract Documents shall be modified by Change Order. The Contractor warrants that if substitutes are approved, no major changes in the function or general design of the Project will result. Incidental changes or extra component parts required to accommodate the substitute will be made by the Contractor without a change in the contract price or contract time. O. LANDS & RIGHT OF WAY. Prior to issuance of Notice to Proceed, the City shall obtain all lands and rights -of -way necessary for the carrying out and completion of Work to be performed pursuant to the Contract Documents, unless otherwise mutually agreed by the Contractor and City, in writing. The City shall provide to Contractor information which delineates and describes the lands owned and right of way acquired. The Contractor shall provide at its own expense and without liability to the City any additional land and access thereto that the Contractor may desire for temporary construction facilities, or for storage of materials. P. SURVEYS, PERMITS AND REGULATIONS. The City shall furnish all boundary surveys and establish all base lines for locating the principal component parts of the Work together with a suitable number of bench marks adjacent to the Work as shown in the Contract Documents. From the information provided by the City, unless otherwise specified in the Contract Documents, the Contractor shall develop and make all detail surveys needed for construction such as slope stakes, batter boards, stakes for pipe locations and other working points, lines, elevations and cut sheets. The Contractor shall carefully preserve bench marks, reference points and stakes and, in case of willful or careless destruction, shall be charged with the resulting expense and shall be responsible for any mistake that may be caused by their unnecessary loss or disturbance. Permits and licenses of temporary nature necessary for the prosecution of the Work shall be secured and paid for by the Contractor unless otherwise stated in the supplemental general conditions. Permits, licenses and easements for permanent structures or permanent changes in existing facilities shall be secured and paid for by the City, unless otherwise specified. The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations bearing on the conduct of the Work as drawn and specified. If the Contractor observes that the Contract Documents are at variance therewith, the Contractor shall promptly notify the City in writing, and any necessary changes shall be adjusted as provided in Article VIl changes in the Work. Q. SUBSURFACE CONDITIONS. The Contractor, before bidding the Project, has the responsibility to become familiar with the Project site and the conditions under which Work will have to be performed during the construction period. Excavating for foundations of surface structure: buildings, bridges, tanks, towers, retaining walls and other types of surface structures. The Contractor shall promptly, and before such conditions are disturbed (excepting an emergency), notify the City by written notice of subsurface or latent physical conditions at the site differing materially from those indicated in the Contract Documents. Contractor shall also be required to notify City of any unknown physical conditions at the site of unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents at the location of the Project. The City shall investigate the conditions, and if it is found that such conditions do so materially differ and cause an increase or decrease in the cost of, or in the time required for, performance of the Work, the Contract Documents may be modified by Change Order as provided in 34 Article VII. Any claim of the Contractor for adjustment hereinafter shall not be allowed unless the required written notice has been given; provided that the. City may, if the City determines the facts so justify consider and adjust any such claims asserted before the date of the final payment. Excavating for below -surface structures: water mains, sewers, power and telephone cables and other types of below surface structures. No extra compensation will be paid for rock excavation or varying geologic features encountered on the Project, unless so shown as a bid item in the Bid Form for bid. If man-made hazards are encountered by the Contractor, excluding utilities, which are not visible from the surface, such as buried concrete foundations, buried garbage dumps that cannot be by-passed and requires additional Work consult the Resident Project Representative. R. SUPERVISION BY CONTRACTOR. The Contractor will supervise and direct the Work. The Contractor will be solely responsible for the means, methods, techniques, sequences and procedures of construction. The Contractor will employ and maintain on the Work a qualified supervisor or superintendent who shall have been designated in writing by the Contractor or the Contractor's representative at the site. The supervisor shall have full authority to act on behalf of the Contractor and all communications given to the supervisor shall be a binding as if given to the Contractor. The supervisor shall be present on the site at all times as required to perform adequate supervision and coordination of the Work. ARTICLE V CONTRACT DOCUMENTS A. The following documents, and any other documents that are attached to, incorporated by reference into, or otherwise included in them, and all Change Orders, are hereby incorporated into this Agreement, and form the entire agreement between City and Contractor, and are referred to as the Contract Documents: INFORMATION FOR BIDDERS 2. BID FOR UNIT PRICE CONTRACTS 3. BID FORM 4. BID BOND EXPERIENCE QUESTIONNAIRE 6. AFFIDAVIT OF WORK AUTHORIZATION 7. This AGREEMENT BETWEEN CITY OF RIVERSIDE AND CONTRACTOR PERFORMANCE BOND PAYMENT BOND 10. MAINTENANCE BOND 11. PREVAILING WAGE RATES - STATE OF MISSOURI DIVISION OF LABOR STANDARDS 12. TIME FOR COMPLETION 13. SCOPE OF WORK 14. TECHNICAL SPECIFICATIONS 35 15. NOTICE TO PROCEED 16. APPLICATION FOR PAYMENT FORM 17. CHANGE ORDER FORM 18. CERTIFICATE FOR SUBSTANTIAL COMPLETION 19. AFFIDAVIT OF COMPLIANCE WITH THE PREVAILING WAGE LAW 20. ANTI -DISCRIMINATION AGAINST ISRAEL ACT CERTIFICATION 21. CONTRACTOR AFFIDAVIT FOR FINAL PAYMENT 22. SUBCONTRACTOR AFFIDAVIT FOR FINAL PAYMENT 23. ENGINEER/CONSULTANT CERTIFICATE for Acceptance & Final Payment B. Contractor represents that it has examined and become familiar with the Contract Documents in their entirety, that any and all ambiguities, inconsistencies, and conflicts observed by Contractor have been called to City's attention in writing and have been resolved in writing to Contractor's satisfaction. Except for actual conflict between provisions in the Contract Documents, making it impossible for Contractor to comply with all provisions of the Contract Documents, the Contract Documents shall be cumulative, and Contractor shall comply with all provisions of all Contract Documents. In case of actual conflict, Contractor shall notify City of the conflict in writing and then shall comply with such provisions of the Contract Documents as City directs. ARTICLE VI PAYMENTS A. Prior to submitting its first application for payment in accordance with the terms hereof in substantially the form attached hereto as Exhibit 1 (an "Application for Payment"), Contractor shall provide City with a schedule of values dividing the Work, and the Contract Amount, into workable categories in a form acceptable to City. Each Application for Payment shall be based upon the percentage of actual completion of each category, multiplied by the dollar value of such category. B. On or about the first day of Contractor's monthly accounting period, Contractor shall submit an Application for Payment to the Resident Project Representative. In addition to the amount of payment requested in the Application for Payment, each Application for Payment shall list the original Contract Amount, the amount Contractor has invoiced City to date, the amount Contractor has received to date, total additions to and deletions from the Contract Amount pursuant to approved Change Orders, and an itemization of any further additions to or deletions from the Contract Amount that Contractor claims. Contractor shall identify each Subcontractor and supplier whom Contractor intends to pay from the requested payment and shall state the amount Contractor intends to pay each such Subcontractor and supplier. An Application for Payment shall not include a request for payment for any portion of the Work that was performed or furnished by a Subcontractor or supplier if Contractor does not intend to pay such Subcontractor or supplier from such payment, nor shall the Application for Payment include a request for payment for any Work performed deemed unsatisfactory by City. Contractor shall include with each Application all supporting documentation as City may require. The City shall, within fifteen (15) days, review and approve such Application for Payment, or return the Application for Payment to the Contractor indicating in writing the reasons for refusing to approve payment. In the latter case, the Contractor may make the necessary corrections and resubmit the Application. Within fifteen (15) days 36 of its receipt of payment from City, Contractor shall pay all Subcontractors and suppliers to whom payment is owed from the amount paid to Contractor. C. All payments under this Agreement shall be made only upon the approval of Resident Project Representative and Administrator. Resident Project Representative shall review each Application for Payment and certify for payment such amounts as Resident Project Representative determines are due Contractor. From the total amount certified. City shall withhold five percent (5%) as retainage until final completion and acceptance of the Work. The five percent (5%) retainage may be reduced by Change Order if final completion and acceptance of the Work is delayed due to unforeseen circumstances and the Work is usable for its intended purpose by the City. If reduction in the retainage is approved, the remaining retainage shall be an amount equal to or greater than 200% of the estimated amount necessary to complete the Work. D. The City Treasurer, upon presentation of an Application for Payment. shall prepare a check for the sum certified to be due (exclusive of retainage), payable out of the funds in the City Treasury available for Contractor under the authorizing Resolution or Ordinance approved by the Board of Aldermen. Payment shall be made to Contractor after the Board of Aldermen review and approve the payment and authorize the Mayor and City Treasurer to sign and deliver the check. E. Neither Administrator or Resident Project Representative's approval certificate nor payment made to Contractor shall constitute acceptance of any part of the Work. Contractor shall remain obligated to perform all Work in accordance with the Contract Documents. F. With each Application for Payment. Contractor shall submit a signed certificate of receipt of prior payments and release of claims and rights in connection with prior payments, in a form approved by City. City may, at its option, also require a similar receipt and release of claims and rights from each Subcontractor or supplier performing any Work, prior to making any payment to Contractor. The Subcontractors' and suppliers' receipts and releases shall be in a form approved by City and shall indicate that (except for retainage) all debts for Work performed or materials supplied included on any previous Application for Payment to City from Contractor have been satisfied and that the Subcontractor or supplier waives and releases any and all claims or rights in connection therewith. G. Contractor shall not be entitled to final payment for the Work until Contractor submits a final Application for Payment, all requirements of the Contract Documents are complied with, and Resident Project Representative issues his or her certificate to that effect. The Engineer's Certificate of Acceptance will be on the form attached hereto as Exhibit P. City, within thirty (30) days after the delivery of Engineer's Certificate of Acceptance, shall pay Contractor all remaining funds which Contractor is due under this Agreement. H. Acceptance of final payment by Contractor shall release City from all further obligations to Contractor, except as to such amounts, if any, Contractor has identified in its final Application for Payment as claimed by Contractor. All claims not identified in the final Application for Payment are waived. Any payment, however final or otherwise, shall not release the Contractor or its sureties from any obligations under the Contract Documents or the Performance and Payment Bonds. I. City may withhold final or any other payment to Contractor on any reasonable basis, including but not limited to the following: 3-7 1. Unsatisfactory job progress, 2. Defective Work, 3. Failure to make payments to Subcontractors or suppliers, 4. Reasonable evidence that all Work cannot be completed for the unpaid balance of the. Contract Amount, 5. Damage by Contractor or Subcontractors or suppliers to property of City or others, 6. Contractor's breach of this Agreement, or 7. Contractor's failure to provide requested documentation. J. The Contractor shall, at the request of City, furnish satisfactory evidence that all obligations to Subcontractors, laborers, workmen, mechanics, materialmen and furnishers of machinery and parts thereof, equipment, tools and all supplies incurred in the furtherance of the performance of the Work have been paid, discharged or waived. If Contractor does not pay Subcontractors or suppliers for labor and/or material properly provided, City may, but shall not be required to, pay Subcontractors and suppliers directly. Any payments made to Subcontractors and suppliers shall be charged against the Contract Amount. City shall not be liable to Contractor for any such payments made in good faith. This provision shall not confer any right upon any Subcontractor or supplier to seek payment directly from City. K. Notwithstanding any other provision for payment contained herein, in the event the Missouri Department of Labor and industrial Relations has determined that a violation of Section 292.675 RSMo has occurred and that a penalty shall be assessed, the City shall withhold and retain all sums and amounts due and owning when making payments to Contractor under this Agreement. ARTICLE VIi CHANGES/CLAIMS A. City, without invalidating this Agreement, may at any time and without notice to any surety, order additions to, deletions from, or other changes to the Work. Upon receipt of such an order, in writing, Contractor shall proceed as and when directed in the order. Contractor shall not proceed with any addition, deletion, or other change without a written order. No oral direction or order shall constitute authority for Contractor to proceed with any addition, deletion, or other change. If Contractor undertakes any addition, deletion, or other change without a written order from City, Contractor shall not be entitled to any increase in the Contract Amount or the time for performance of the Work, and Contractor shall be solely and completely responsible I'or the acceptability to City of the addition, deletion, or other change. B. If a change to the Work causes a net increase or decrease in the cost of Contractor's performance, the Contract Amount shall be increased or decreased as follows: 1. If the Work is covered by unit prices set forth in Contractor's Bid for Unit Price Contracts, by application of such unit prices to the quantities of the items involved; or 8 ?. If the Work involved is not covered by unit prices set forth in Contractor's Bid for Unit Price Contracts, by a lump surn as to which Contractor and City mutually agree prior to the commencement of performance of the change. C. if a change to the Work causes an increase or decrease in the time required for Contractor's performance, an equitable adjustment to the time for performance shall be made. D. A change in the Contract Amount or the time for performance of the Work shall be accomplished only by written Change Order, which shall state the increase or decrease, if any, in the Contract Amount or the time for performance. No course of conduct or dealings between the parties, nor express or implied acceptance of alterations or additions to the Work, and no claim that City has been unjustly enriched by any alteration or addition to the Work, whether or not there is, in fact, any such enrichment, shall be the basis of any claim to an increase in any amounts due under the Contract Documents or a change in the time for performance of the Work. E. Agreement on any Change Order shall constitute a final settlement of all matters relating to the change in the Work that is the subject of the Change Order, including but not limited to all direct and indirect costs associated with such change and any and all adjustments to the Contract Amount and time for performance of the Work. F. If Contractor is delayed or interfered with at any time in the commencement or prosecution of the Work by an act or neglect of City, an employee, officer, or agent of City, or an architect or engineer or separate contractor engaged by or on behalf of City, or by changes ordered in the Work, an act of God, fire, or other cause over which Contractor has no control and that Contractor could not reasonably anticipate, the time for performance of the Work shall be equitably extended, provided that Contractor gives notice as provided for in Paragraph G below. G. Any claim by Contractor for additional time or money for the performance of the Work, including but not limited to any claim based on or arising out of an addition to, deletion from, or other change to the Work and/or delay to or interference with commencement or prosecution of any of the Work, shall be submitted to City's designated representative within five (5) working days of the beginning of the event for which the claim is made or on which it is based. If any claim is not submitted within the five-day period, it shall be deemed waived. H. No change or claim, nor any delay or dispute concerning the determination of any increase or decrease in the amount of time and money for the performance of the Work, shall excuse Contractor from proceeding with prosecution of the Work, including any Work as changed. ARTICLE VIII INSURANCE A. Contractor shall, at all times during the performance of any of the Work, maintain not less than the following insurance coverages and amounts: 1. COMMERCIAL. GENERAL LIABILITY INSURANCE written on an occurrence basis, and agrees it's coverage will not contain any restrictive endorsement(s) excluding or limiting ongoing and completed operations, personal & advertising tG injury, blanket contractual liability or cross liability, independent contractors, broad form property damage, bodily injury, and agrees it's coverage will not contain any restrictive endorsement(s) excluding explosions, collapse, and underground with a minimum limit of $3,000,000 each occurrence. if a general aggregate limit applies, either the general aggregate limit shall be twice the required per occurrence limit or the general aggregate shall apply separately to this project (ISO CG 20 03), or if there are multiple locations (ISO CG 25 04). 2. COMPREHENSIVE BUSINESS AUTOMOBILE LIABILITY INSURANCE for all owned, non -owned and hired automobiles and other vehicles used by Contractor with a combined single limit of $1,000,000 minimum. 3. WORKERS COMPENSATION INSURANCE with statutory limits required by any applicable Federal or state law and Employers Liability insurance with minimum limit of $1,000,000 per accident. 4. RUiLDER'S RISK - Unless otherwise provided, Contractor shall purchase and maintain, in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located, property insurance written on a builder's risk "all-risk", including testing, when required, or equivalent policy form in the amount of the initial Contract Sum, plus value of subsequent Contract modifications and cost of materials supplied or installed by others, comprising total value for the entire Project at the site on a replacement cost basis without optional deductibles. The Contractor shall be solely responsible for any deductible amounts. Such property insurance shall be maintained, unless otherwise provided in the Contract Documents or otherwise agreed in writing by all persons and entities who are beneficiaries of such insurance, until final payment has been made or until no person or entity other than the City has an insurable interest in the property, whichever is later. This insurance shall include interests of the City, the Contractor, subcontractors and sub - subcontractors and suppliers in the Project. Such coverage shall name the City as a loss payee as their interest may appear. If the project does not involve new or major reconstruction, at the option of the City, an Installation Floater may be acceptable. For such projects, an installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, and equipment. The Installation Floater shall provide property damage coverage for any building, structure, or equipment damaged, impaired, broken, or destroyed during the performance of the work, including transit, installation. and testing at the City's site. CLAIMS -MADE POLICIES - If any of the required policies provide coverage on a claims -made basis: The retroactive date must be shown, and this date must be betbre the execution date of the contract or the beginning of contract work. Insurance must be maintained, and evidence of insurance must be provided for at least five (5) years after completion of the contract of work. 40 • If coverage is canceled or non -renewed, and not replaced with another claims - made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase "extended reporting" coverage for a minimum of five (5) years after completion of contract work. • If the services involve lead -based paint or asbestos identification / remediation, the Contractors Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold. 6. UMBRELLA OR EXCESS LIABILITY may satisfy minimum liability limits required above for Commercial General Liability (CGL) under an Umbrellas or Excess Liability policy. There is no minimum Per Occurrence limit of liability under the Umbrellas or Excess Liability: however, the Annual Aggregate limit shall not be less than the highest Each Occurrence limit for either Commercial General Lability or Business Auto Liability. Contractor agrees to endorse the City its officers, agents, volunteers, lessees, invitees and employees, covered as an additional insured on the Umbrellas or Excess Liability and the Certificate of Insurance states that the Umbrella or Excess Liability provides coverage on a "Follow -Form" basis. B. Prior to construction starting, Contractor shall furnish the City with certificates of insurance evidencing the required coverage, conditions, and limits required by this agreement and make the City, its officers, agents, volunteers, lessees, invitees, and employees, covered as an additional insured on each policy of insurance that Contractor is required to maintain under the contract documents and provide the appropriate additional insured endorsement(s). Each additional insured endorsement shall expressly afford coverage to the additional insured's not only arising out of the named insured's operations or work but also arising out of the named insured's completed operations. All insurance shall be written by an insurer or insurers acceptable to City and with a minimum financial rating not lower than "A-" in Best's Insurance Guide, latest edition. C. City's receipt or review of any certificate of insurance reflecting that Contractor or one of its subcontractors or suppliers has failed or may have failed to comply with any insurance requirement of the contract documents shall not constitute a waiver of any of City's insurance rights under the contract documents, with all such rights being fully and completely reserved by the City. D. Contractor hereby agrees to waive rights of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers' Compensation policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by the Contractor, its employees, agents, and subcontractors. E. Similarly, Contractor shall require insurance with the same coverage and limits from its subcontractors and suppliers, and their insurance policies shall be endorsed to name the same additional insureds as required of Contractor. F. All completed operations coverages shall be maintained by Contractor and its subcontractors or suppliers for five (5) years following the completion of the Project. 41 G. Any coverage available to the City as a named insured shall be secondary, so that the coverage to the City as an additional insured on the policies maintained by Contractor and subcontractors is primary, including any umbrellas or excess policies. H. No provision of this agreement shall constitute a waiver of the member's right to assert a defense based on sovereign immunity, official immunity, or any other immunity available under law. For any claim or suit seeking damages from the Missouri municipality scheduled in this endorsement because of "bodily injury", "property damage", or "personal and advertising injury" caused by "your work", the coverage provided herein does not apply to any claim or "suit" which is barred by the doctrines of sovereign immunity, qualified immunity, and/or official immunity although defense of such actions will be provided. No provision of this condition of coverage, endorsement, or this policy, will constitute a waiver of this company's right to assert a defense based on the doctrines of sovereign immunity, qualified immunity, and/or official immunity. 1. If the contractor maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. J. If Contractor is a transient employer as defined in Section 285.230 RSMo, Contractor must post in a prominent and easily accessible place at the Work site a clearly legible copy of the following: (1) the notice of registration for employer withholding issued to such transient employer by the Director of Revenue; (2) proof of coverage for workers' compensation insurance or self-insurance signed by the transient employer and verified by the Department of Revenue through the records of the Division of Workers' Compensation; and (3) the notice of registration for unemployment insurance issued to such transient employer by the Division of Employment Security. Any transient employer failing to comply with these requirements shall, under Section 285.234 RSMo be liable for a penalty of $500 per day until the notice required by this Paragraph are posted as required by law. K. Any self -insured retention (SIR) must be declared to and approved by the city prior to any work being performed under this agreement. When the SIR exceeds $25,000, the city may require proof of ability to pay all claims handling and defense costs, such as an audited financial statement or bond. Any SIR is the sole responsibility of the contractor or sub -contractor, if any. The city reserves the right to deduct from the final payment to the contractor any unsatisfied SIR which would result in a lien against the project. All SIRs will be shown on the Certificate of Insurance. ARTICLE IX INDEMNITY A. To the fullest extent permitted by law, Contractor shall defend, indemnify, and hold harmless City, its employees, officers, and agents, volunteers, invitees, and lessees, and any architects, engineers, or other design professionals engaged by or on behalf of City, from and against claims, damages, losses, and expenses, including but not limited to attorney's fees, arising out of or resulting from the performance of the Work, provided that such claim, damage, loss, or expenses is attributable to bodily injury, sickness, disease, or death or to injury to or destruction of tangible property (other than the Work itself), but only to the extent caused or allegedly caused by the negligent or willful acts or omissions of Contractor, a Subcontractor or supplier, or anyone directly or indirectly employed by them, 42 or anyone for whose acts they may be liable, regardless of whether such claim, damage, loss, or expense is caused in part by a party indemnified hereunder. This obligation is not intended to, and shall not, negate, abridge, or reduce other rights or obligations of indemnity that would otherwise exist as to a party or person as set forth in this Agreement. B. In claims against any person or entity indemnified herein by an employee of Contractor, a Subcontractor or supplier, or anyone directly or indirectly employed by them or for whose acts they may be liable, the indemnification obligation shall not be limited by a limitation on the amount or type of damages, compensation, or benefits payable by or for Contractor or a Subcontractor or supplier under workers' compensation acts, disability benefit acts, or other employee benefit acts. ARTICLE X PATENT LIABILITY Contractor agrees to defend, indemnify, and hold harmless City, its officers, employees and agents from and against any claim, action or suit that may be brought against them for Contractor's infringement of any Letters Patent in the performance of this Agreement or any breach or violation of trademark or proprietary or trade secret rights of others, as well as against any judgments, decrees, damages, costs and expenses sought, adjudicated, or recovered against any of them, on account of any such actual or alleged infringement. ARTICLE XI COVENANT AGAINST LOBBYING AND UNDUE INFLUENCE A. Contractor represents and warrants that it has not employed or retained any company or person, other than a bona fide employee working for Contractor, to solicit or secure this Agreement, and that it has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift, or any other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to void this Agreement without liability and, in its discretion, to deduct from the Contract Amount, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. B. Contractor represents and warrants that no payments have been or shall be made, directly or indirectly, by or on behalf of Contractor to or for the benefit of any officer, employee, or agent of City who may reasonably be expected to influence the decision to requisition issue or take any action with respect to this Agreement. Contractor shall allow a mutually agreeable nationally recognized certified public accounting firm to examine, at City's expense, such of Contractor's books and records as may be necessary, in the accountant's reasonable opinion, to verify Contractor's compliance with this Article. C. No official of the City who is authorized in such capacity and on behalf of the City to negotiate, make, accept, or approve, or to take part in negotiating, making, accepting, or approving any architectural, engineering, inspection, construction, or material supply contract or any subcontract in connection with the construction of the Project, shall become directly or indirectly interested personally in this Agreement or in any part hereof. No officer, employee, architect, attorney, engineer, or inspector of or for the City who is authorized in such capacity and on behalf of the City to exercise any legislative, executive, supervisory, or other similar functions in connection with the construction of the Project; shall 43 become directly or indirectly interested personally in this Agreement or in any part thereof, any material supply contract, subcontract, insurance contract, or any other contract pertaining to the Project. ARTICLE XII RECORDS REGARDING PAYMENT For a period of at least two (2) years after final payment to Contractor, Contractor shall maintain, in accordance with generally accepted accounting principles, such records as are necessary to substantiate that all Applications for Payment hereunder were valid and properly chargeable to City. For lump sum contract Work, the records shall demonstrate that the City was billed at appropriate times for proper percentages of completion and for payments to Subcontractors and suppliers. For any Work, including extra Work, not charged on a lump sum basis, the records to be maintained hereunder include but are not limited to all contracts, subcontracts, material bills, correspondence, accounting records, time sheets, payroll records, canceled checks, orders, and invoices pertaining to City's account. City or its representative shall, upon reasonable prior notice to Contractor, be given the opportunity to audit these records at any time during normal business hours to verify the accuracy of Contractor's invoices and charges. ARTICLE XIII NOTICES A. The following persons are designated by the respective parties to act on behalf of such party and to receive all written notices and Applications for Payment: If to the City: Travis Hoover 2950 NW Vivion Rd. City of Riverside, MO Riverside, MO 64150 thoovev a tiversidemo. eov with a copy to: Olsson James Gallagher 1717 Ingersoll Avenue, Suite I I I Des Moines, IA 50309 1gallacherri bolsson.com If to the Contractor: Name: Jerry Prochko Title: Department Manager Street Address: 6900 Executive Drive City, State Zip: Kansas City, MO 64120 Email: iprochko+a'blackandmcdonaid.com B. Any notice required by the Contract Documents to be given in writing or that either City or Contractor wishes to give to the other in writing shall be signed by or on behalf of the party giving notice. The notice shall be deemed to have been completed when sent by certified or registered mail to the other party at the address set forth herein, or delivered in person to said party or their authorized representative. 44 C. Contractor's designated representative shall be available to meet with City at any time during the performance of the Work and shall have full authority to act on Contractor's behalf on any matter related to this Agreement and/or the Work. ARTICLE XIV DEFAULT AND TERMINATION A. If Contractor fails to comply, becomes unable to comply, or with reasonable probability (as determined solely by City) will become unable to comply with any of Contractor's obligations under the Contract Documents, including but not limited to (1) failure at any time to furnish sufficient labor or supervision, sufficient materials or services (including but not limited to insurance and bonds) complying with the Contract Documents, or sufficient or properly operating tools, equipment, or other items necessary for the performance of the Work, (2) failure in any respect to prosecute the Work with promptness and diligence, (3) causing any stoppage of, delay in, or interference with any work of City or any others on the Project, (4) abandonment by Contractor of all or any part of the Work, or (5) bankruptcy, insolvency or general assignment for the benefit of creditors by Contractor, Contractor shall be in default, and if the default is not corrected to City's satisfaction within seventy-two (72) hours of delivery of a written notice to Contractor to correct such default, City may, in addition to any other right or remedy City may have, terminate the services of the Contractor and take possession of the Project and of all materials, equipment, tools, construction equipment and machinery thereon owned by the Contractor and finish the Work by whatever method the City may deem expedient to correct the default, at Contractor's expense. In such case the Contractor shall not be entitled to receive any further payment until the Work is finished. If such costs exceed the unpaid balance due to Contractor, the Contractor will pay the difference to the City. B. If City exercises its right to take over and complete any part or all of the Work, City and its designees shall have access to and may take possession of Contractor's materials, tools, equipment, and other items at the Project site, en route to the site, or in storage or being manufactured or fabricated away from the site, as may be necessary to prosecute the Work taken over by City, and may employ Contractor's employees or former employees, all without any liability to Contractor. C. Contractor shall be liable for and shall pay to City all costs and expenses of whatsoever nature incurred by City as a result of any default by Contractor, including but not limited to the cost of labor, supervision, materials, tools, equipment, services, overhead, travel, and legal and accounting fees. Contractor also shall be liable for and shall pay to City all charges, liabilities, fines, penalties, losses, damages, and claims sustained by or assessed against City as a result of any delay or disruption resulting from any default by Contractor. The total amount of such costs, expenses, charges, liabilities, fines, penalties, losses, damages, and claims may be deducted by City from the amount, if any, otherwise due Contractor, and Contractor shall pay City the full amount of any excess of such total over the amount otherwise due Contractor. D. No right or remedy conferred upon or reserved to City by the Contract Documents is exclusive of any other right or remedy provided or permitted in the Contract Documents or by law or equity, but each right or remedy is cumulative of every other right or remedy, and every right or remedy may be enforced concurrently or from time to time. No exercise by City of any right or remedy shall 45 relieve Contractor from full and absolute responsibility for all of Contractor's obligations under the Contract Documents. E. No failure or delay of City to give notice to correct any default of Contractor or to exercise any of City's rights or remedies shall waive or excuse the default, and City shall remain free to pursue all rights and remedies. No failure of City to insist, in any one or more instances, upon the performance of any of Contractor's obligations under the Contract Documents shall be deemed or construed as a waiver or relinquishment of City's right to insist upon strict performance of the obligation in any future instance. F. If through no act or fault of the Contractor, the Work is suspended for a period of more than ninety (90) days by the City or under an order of court or other public authority, or the City fails to act on any request for payment within thirty (30) days after it is submitted, or the City fails to pay the Contractor substantially the sum approved by the Resident Project Representative and Administrator, then the Contractor may after ten (10) days from delivery of written notice to the City terminate the Agreement and recover from the City payment for all Work executed. G. The City, without terminating the service of the Contractor or written notice to the Surety, through the Administrator may withhold, without prejudice to the rights of the City under the terms of the Agreement, or on account of subsequently discovered evidence, nullify the whole or part of any approved partial payment estimate to such extent as may be necessary to protect the City from loss on account of (1) defective Work not remedied, (2) claims filed or reasonable evidence indicating probably filing of claims, (3) failure of Contractor to make payments property to Subcontractors or for material or labor, (4) a reasonable doubt that the Work can be completed for the balance then unpaid, (5) damages to another contractor, or (6) performance of Work in violation of the terms of the Contract Documents. ARTICLE XV TERMINATION FOR CONVENIENCE Notwithstanding anything contained herein to the contrary, City may, at any time, for any reason, and without Contractor's being in default, terminate Contractor's performance of any part or all of the Work for City's own convenience by giving written notice to Contractor. Upon receipt of notice of termination for City's convenience, Contractor shall, to the extent directed by City, stop Work and turn over to City or City's designee materials and equipment purchased for the Work. City shall pay Contractor, in accordance with the Contract Documents, for only so much of the Work as is actually performed as of the termination for convenience. City shall not be obligated to Contractor for any further payment, including but not limited to prospective overhead or profit on unperformed Work. If a termination by City of Contractor's right to proceed on the ground of default by Contractor is determined later to have been improper, the termination automatically shall be converted to a termination for City's convenience, and City's obligation to Contractor shall be limited to payment to Contractor as provided in this Article. ARTICLE XVI COMPLIANCE WITH LAWS A. Contractor shall comply strictly with all federal, state, and local laws, ordinances, rules, regulations. orders, and the like applicable to the Work, including, but not limited to any applicable 46 prevailing wage and prompt payment laws and all U.S. Army Corps of Engineers guidelines, rules, regulations, and criteria for Work within or adjacent to a flood control project area. Contractor shall secure all permits from public and private sources necessary for the fulfillment of Contractor's obligations under the Contract Documents. B. With each Application for Payment submitted by Contractor to City, Contractor shall include (a) a signed statement, in form acceptable to City, showing, for each weekly payroll period that ended during the period covered by the Application for Payment, the name, address, social security number, occupation, and craft of each worker employed by Contractor in connection with the Work and, for each such worker, the number of hours worked each day, the total hours worked during the payroll period, the gross amount earned, an itemization of all deductions, and the net wages paid and (b) a corresponding statement from each Subcontractor of any tier that employed any workers in connection with the Work during the period covered by the Application for Payment. C. This Agreement shall be governed by and construed in accordance with the laws of the State of Missouri. ARTICLE XVD LABOR STANDARDS PROVISIONS A. MISSOURI PREVAILING WAGE LAW. Not less than the prevailing hourly rate of wages established by the Missouri Department of Labor and Industrial Relations Division of Labor Standards, as set out in the wage order set forth in Exhibit D attached to and made a part of, shall be paid to all workers performing Work under the Agreement. An Affidavit of Compliance with the Prevailing Wage Law as set forth in Exhibit L shall be completed by Contractor and every Subcontractor employed on the Project prior to final payment. The Contractor will forfeit a penalty to the City of $100 per day (or portion of a day) for each worker that is paid less than the prevailing rate for any Work done under the contract by the Contractor or by any Subcontractor. B. EXCESSIVE UNEMPLOYMENT. During periods of excessive unemployment (any month immediately following two consecutive calendar months during which the level of unemployment in the state has exceeded five percent (5%) as measured by the United States Bureau of Labor Statistics) only Missouri labors (persons who have resided in Missouri for at least thirty days and intend to become or remain Missouri residents) and laborers from non-restrictive states (persons who are residents of a state which has not enacted state laws restricting Missouri laborers from working on public works projects in that state, as determined by the Labor and Industrial Relations Commission), may be employed under the contract, except that other laborers may be used when Missouri laborers or laborers from nonrestrictive states are not available, or are incapable of performing the particular type of work involved, if so certified by the Contractor and approved by the City. C. UNDERPAYMENT OF WAGES. In case of underpayment of wages by the Contractor or by any Subcontractors to laborers or mechanics employed by the Contractor or Subcontractor upon the Work covered by this Agreement, the City, in addition to such other rights as may be afforded it under this Agreement shall withhold from the Contractor, out of any payments due the Contractor, so much thereof as the City may consider necessary to pay such laborers or mechanics the full amount of wages required by this Agreement. The amount so withheld may be disbursed by the City, for and on account of the Contractor or the Subcontractor (as may be appropriate), to the respective laborers or mechanics 47 to whom the same is due or on their behalf to plans, funds, or programs for any type of fringe benefit prescribed in the applicable wage determination. D. LIMITATIONS ON EMPLOYMENT. No person under the age of sixteen (16) years and no person who, at the time, is serving sentence in a penal or correctional institution shall be employed on the Work covered by this Agreement. ARTICLE XVIII EQUAL EMPLOYMENT OPPORTUNITY The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor will take affirmative action to ensure that applicants and employees are treated during employment, without regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, employment, upgrading, demotion, or transfer; recruitment, or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. ARTICLE XIX SUBCONTRACTS, ASSIGNMENT, OR TRANSFER A. Except with the prior written consent of City, Contractor shall not assign this Agreement or any money due or to become due Contractor or issue a subcontract or purchase order to any person or entity for any or all of the Work. City's consent to any assignment, subcontract, or purchase order shall not relieve Contractor from any obligation under the Contract Documents, nor shall it create any obligation from City to any assignee, Subcontractor, or vendor. B. Each subcontract or purchase order issued by Contractor for any of the Work shall be in writing and shall provide that City is an intended third -party beneficiary of the subcontract or purchase order. C. The Contractor shall be fully responsible to the City for the acts and omissions of its Subcontractors, and of person either directly or indirectly employed by them, as the Contractor is for the acts and omissions of person directly employed by it. D. The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the Work to bind Subcontractors to the Contractor by the terms of the Contract Documents insofar as applicable to the Work of Subcontractors and give the Contractor the same power as regards terminating any Subcontract that the City may exercise over the Contractor under any provision of the Contract Documents. Nothing contained in this Agreement shall create any contractual relation between any Subcontractor and the City. E. Each subcontract or purchase order issued by Contractor for any of the Work shall provide that it is freely assignable by Contractor to City. Contractor hereby assigns to City all its interest in any present or future subcontract or purchase order issued by Contractor for any or all of the Work. This assignment shall be effective upon acceptance by City in writing and only as to the specific subcontract(s) and/or purchase order(s) that City designates in the writing. This assignment may be 48 accepted by City at any time, whether before or after final payment to Contractor, and may not be withdrawn by Contractor without City's written consent. ARTICLE XX SEPARATE CONTRACTS A. The City reserves the right enter into other contracts in connection with the Project. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their Work, and shall properly connect and coordinate the work with theirs. If the proper execution or results of any part of the Contractor's Work depends upon the work of any other contractor, the Contractor shall inspect and promptly report to the Administrator any defects in such work that render it unsuitable for such proper execution and results. B. The City may perform additional work related to the Project or the City may enter into other contracts containing provisions similar to these. The Contractor will afford the other contractors who are parties to such contracts (or the City, if the City is performing the additional work) reasonable opportunity for the introduction and storage of materials and equipment and the execution of work, and shall properly connect and coordinate the Work with theirs. C. If the performance of additional work by other contractors or the City is not noted in the Contract Documents prior to the execution of the contract, written notice thereof shall be given to the Contractor prior to starting any such addition work. If the Contractor believes that the performance of such additional work by the City or others involves it in additional expense or entitles it to any extension of the contract time the Contractor may make a claim thereof as provided in Article VII, ARTICLE XXI ACCESS TO SITEXLEANING UP A. Contractor shall ensure that the Work, at all times, is performed in a manner that affords reasonable access, both vehicular and pedestrian, around the site of the Work and all adjacent areas. B. Representatives of City may inspect or review any Work performed by Contractor, and consult with Contractor, at any time. City's inspections or reviews shall not constitute acceptance or approval of Work unless specifically stated in writing. Contractor shall meet with City at the request of City. C. Contractor shall at all times, during performance of the Work, keep the Project site clean and free from debris resulting from the Work. Prior to discontinuing Work in an area, Contractor shall clean the area and remove all rubbish and its construction equipment, tools, machinery, waste, and surplus materials. Contractor shall make provisions to minimize and confine dust and debris resulting from construction activities. If Contractor fails to comply with cleanup duties within twenty-four (24) hours after written notification from City of non-compliance, City may implement cleanup measures without further notice and deduct the cost from any amounts due or to become due Contractor. 49 ARTICLE XXII COMPETENCE Contractor represents and warrants that it maintains all necessary licenses, registration, competence, and experience to perform all the Work. ARTICLE XXM WARRANTY A. Contractor shall exercise high professional skill, care, and diligence in the performance of the Work, and shall carry out its responsibilities in accordance with customarily accepted good professional practices. The Contractor shall guarantee all materials and equipment furnished and Work performed for a period of one (1) year from the date of completion and acceptance of the Work. The Contractor warrants and guarantees for one (1) ,year from the date of completion and acceptance of the Work that the completed Work is free from all defects due to faulty materials or workmanship. The date of completion for all scopes of work shall be the last date of acceptance of all Work in this Agreement. Contractor shall promptly make such corrections as may be necessary by reason of such defects including the repair of any other damages that were caused by defects in the Work, at its own expense. The City will give notice of observed defects with reasonable promptness. In the event that the Contractor fails to make such repairs, adjustments or other Work that may be necessary by such defects, the City may do so and charge the Contractor the cost thereby incurred. In emergency where, in the judgment of the City, delay would cause serious loss or damage, repairs and replacement of defects in the Work and damage caused by defects may be made without notice being sent to the Contractor, and the Contractor shall pay the cost thereof. The Performance Bond shall remain in full force and effect through the warranty period. Neither final payment, Engineer's Final Certificate, nor any other provision in the Contract Documents shall affect Contractor's obligation to complete the Work free of defects in workmanship and material. B. Contractor shall remain solely responsible for the performance of the Work as required by the Contract Documents, notwithstanding any suggestions or observations made by another person or entity with respect to the Work. C. This Article does not establish a period of limitation with respect to any obligation of Contractor under the Contract Documents, and does not limit the time allowed by law for any action for breach of such obligation. ARTICLE XXIV STORAGE OF MATERIALS AND EQUIPMENT The Contractor shall provide at its own expense and without liability to the City any additional land and access thereto that the Contractor may desire for temporary construction facilities, or for storage of materials. Only materials and equipment that are to be used directly in the Work shall be brought to and stored at the Project site by Contractor. After equipment is no longer required for the Work, it shall be promptly removed from the Project site. Protection of construction materials and equipment stored at the Project site from weather, theft, and all other casualty or damage is solely the responsibility of Contractor. ARTICLE XXV TAXES A Missouri Sales Tax Project Exemption Certificate (Missouri Department of Revenue Form 5060) will be provided by the City for the purchase of any materials or personal property incorporated into or consumed in the Project, pursuant to RSMo 144.062. The Contractor will pay all other sales, consumer, use and other similar taxes required by the State of Missouri or other taxing jurisdiction. ARTICLE XXVI SAFETY A. Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with performance of the Work and shall take reasonable precautions for the safety of, and shall provide reasonable protection to prevent damage, injury, or loss to (1) employees and other persons at the Project site or who may be affected by the Work, (2) materials and equipment stored at on -site or off -site locations for use in performance of the Work, and (3) other property at the Project site or in its vicinity, such as trees, shrubs, lawns, walks, pavements, roadways, structures, and utilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall give notices required by and comply strictly with applicable laws, ordinances, rules, regulations, orders, and the like bearing on safety of persons or property or their protection from damage, injury, or loss. The Contractor will erect and maintain, as required by the conditions and progress of the Work, all necessary safeguards for safety and protections. The Contractor will notify owners of adjacent utilities when prosecution of the Work may affect them. The Contractor will remedy all damage, injury or loss to any property caused directly or indirectly, in whole or part, by the Contractor, any Subcontractor or anyone directly or indirectly employed by any of them or anyone whose acts any of them may be liable. C. The Contractor shall exercise proper precaution at all times for the protection of persons and property and shall be responsible for all damages to persons or property, either on or off the site, which occur as a result of its prosecution of the Work. The safety provisions of applicable laws and building and construction codes shall be observed and the Contractor shall take or cause to be taken, such additional safety and health measures as the City may determine to be reasonably necessary. D. Pursuant to Section 292.675 RSMo, Contractor shall provide a ten (10) hour Occupational Safety and Health Administration (OSHA) construction safety program for all employees who will be on -site at the Project. The construction safety program shall include a course in construction safety and health that is approved by OSHA or a similar program approved by the Missouri Department of Labor and Industrial Relations which is at least as stringent as an approved OSHA program as required by Section 292.675 RSMo. Contractor shall require its on -site employees to complete a construction safety program within sixty (60) days after the date Work on the Project commences. Contractor acknowledges and agrees that any of Contractor's employees found on the Project site without documentation of the successful completion of a construction safety program shall be required to produce such documentation within twenty (20) days, or will be subject to removal from the Project. Contractor shall require all of its Subcontractors to comply with the requirements of this Paragraph and Section 292.675 RSMo. 51 E. Contractor shall forfeit to the City as a penalty two thousand five hundred dollars ($2,500.00), plus one hundred dollars ($100.00) for each on -site employee employed by Contractor or its Subcontractor, for each calendar day, or portion thereof, such on -site employee is employed without the construction safety training required herein. The penalty described in this Paragraph shall not begin to accrue until the time periods herein have elapsed. Violations of this requirement and imposition of the penalty described in this Paragraph shall be investigated and determined by the Missouri Department of Labor and Industrial Relations. F. If City deems any part of the Work or the Project site unsafe, City, without assuming responsibility for Contractor's safety program, may require Contractor to stop performance of the Work or take corrective measures satisfactory to City, or both. If Contractor does not adopt corrective measures, City may perform them or have them performed and deduct their cost from the Contract Amount. Contractor shall make no claim for damages, for an increase in the Contract Amount, or for a change in the time for performance of the Work based on Contractor's compliance with City's reasonable request. ARTICLE XXVII AUTHORIZED EMPLOYEES Contractor acknowledges that Section 285.530 RSMo prohibits any business entity or employer from knowingly employing, hiring for employment, or continuing to employ an unauthorized alien to perform work within the State of Missouri. Contractor therefore covenants that it is not knowingly in violation of subsection 1 of Section 285.530 RSMo, and that it will not knowingly employ, hire for employment, or continue to employ any unauthorized aliens to perform Work on the Project, and that its employees are lawfully eligible to work in the United States. ARTICLE XXVIII INDEPENDENT CONTRACTOR Contractor is an independent contractor, and neither Contractor or any Subcontractors, suppliers, employees, or agents shall be deemed an employee or agent of City for any purpose. ARTICLE XXIX CONFLICT Contractor shall promptly upon discovery notify City of any conflict, ambiguity or inconsistency in the Contract Documents, or between any Contract Document and actual field conditions, and City shall resolve such conflict, ambiguity or inconsistency in its sole discretion. ARTICLE XXX PERFORMANCE, PAYMENT, AND MAINTENANCE BONDS The Contractor shall within ten (10) days after the receipt of the Notice of Award furnish the City with a Performance Bond and Payment Bond in forms set forth in Exhibits A and B in an amount at least equal to one hundred percent (100%) of the contract price, conditioned upon the performance by the Contractor all undertakings, covenants, terms, conditions and agreements of the Contract Documents, and upon the prompt payment by the Contractor to all persons supplying labor and materials in the 52 prosecution of the Work provided by the Contract Documents. Such bonds shall be executed by the Contractor and a corporate bonding company licensed to transact such business in the state in which the Work is to be performed and named on the current list of "Surety Companies Acceptable on Federal Bonds" as published in the Treasury Department Circular Number 570 and shall have a rating of at least "A=" from Best's. The expense of these bonds shall be borne by the Contractor. If at any time a surety on any such bond is declared a bankrupt or loses its right to do business the state in which the Work is to be performed or is removed from the list of Surety Companies accepted on Federal Bonds, Contractor shall within ten (10) days after notice from the City to do so, substitute an acceptable bond (or bonds) in such form and sum and signed by such other surety or sureties as may be satisfactory to the City. The premiums on such bond shall be paid by the Contractor. No further payment shall be deemed due nor shall payment be made to Contractor until the new surety or sureties shall have furnished an acceptable bond to the City. Contractor shall provide a maintenance bond in accordance with Exhibit C and in an amount equal to 50% of the cost of the Work, which shall be in effect for a term of two (2) years from the date that the Owner issues a certificate of substantial completion for such improvement covered by the bond, conditioned upon the faithful performance of the provisions, terms and conditions of this contract. The maintenance bond shall name the Owner as an oblige. ARTICLE XXXI SEVERABILITY Should any specific provision of this Agreement or other Contract Documents be found to be unenforceable, the remaining provisions shall remain in full force and effect. ARTICLE XXXII NO PRESUMPTION AGAINST THE DRAFTER No presumption or inference against the City shall be made because of the City's preparation of this Agreement or other Contract Documents. ARTICLE XXXIII DISPUTES/ATTORNEY FEES A. If a dispute arises out of or relates to this Agreement or other Contract Documents, or the breach thereof, and if the dispute cannot be resolved through negotiation, City and Contractor shall first try in good faith to resolve the dispute by mediation before resorting to litigation. Unless City and Contractor agree otherwise, the mediation shall be administered by the American Arbitration Association under its Construction Industry Mediation Rules. B. In the event of litigation between Contractor and City concerning the Project or this Agreement or other Contract Documents, the prevailing party shall be entitled to recover from the other party its reasonable attorney fees, costs, and expenses arising from such litigation. 53 ARTICLE XXXIV TITLES The titles given to the Articles in this Agreement are for ease of reference only and shall not be relied upon or cited for any other purpose. Specifically, but without limitation, the titles shall not define or limit any of the provisions of any of the Articles. ARTICLE XXXV PROVISIONS REQUIRED BY LAW DEEMED INSERTED Each and every provision of law and clause required by law to be inserted in this Agreement shall be deemed to be inserted herein and this Agreement shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted, or is not correctly inserted, then upon the application of either party this Agreement shall forthwith by physically amended to make such insertion or correction. All such laws, orders and regulations are applicable to this Project and are made a part hereof by reference. ARTICLE XXXVI ENTIRE AGREEMENT This Agreement and the other Contract Documents constitute the entire agreement between the parties with respect to their subject matter. Any prior agreements, understandings, or other matters, whether oral or written, are of no further force or effect. Subject to Article Vll of this Agreement, this Agreement and any other Contract Document may be amended, changed, or supplemented only by written agreement executed by both of the parties. THIS AGREEMENT shall be binding on the parties only after it has been duly executed by City and Contractor. [THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK] 54 IN WITNESS WHEREOF, the parties have caused this Agreement to be executed by their authorized representatives. APPROVED AS TO FORM: A7TORNEY.- By: P Attorney, d u 1 D COUNTERSIGNED BY: CFIT PURCHASING AGENT By: \ . B 'an E. Koral ty Administrator _--/ !'r� CITY OF RIVERSIDE: n} w Ka een L. Rose, Mayor lE,S• U U`1t� ATTEST: S Melissa McChesney, City Cle k CONTRACTOR: Custom Lighting Services LLC dba Black & McDonald .q.,.d by 34f1y Pr JMo 0 US. E=laxMo�Di.cranen�ro�sM.com, Jerry Proch o°,: m` g.'.g N-J" —IftLC 8.Ck6 Akin aw. ou•��ia a ow�a4 cauwu,on O�+iaa'1,4an4p... CN•7.ry Prucl+ho j?IS.D934 1fi27'08�W' By. (Signature) Printed Name: Jerry Prochko Title: Department Manager ATTEST: SECRETARY, 55 (Name Printed) EXHIBIT A PERFORMANCE BOND FOR THE FAITHFUL PERFORMANCE of each of the terms and stipulations of the AGREEMENT between the CITY OF RIVERSIDE and CONTRACTOR, for construction of HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS ( PROJECT NO: 620-2281, dated 20 , designated Resolution No. 2025- , in every particular, Custom Lighting Services, LLC dba Black and McDonald, as Principal, and as Surety, hereby firmly bind themselves and their respective heirs, executors, administrators, successors, and assigns, jointly and severally, unto the City of Riverside., Missouri, ("City") in the total aggregate penal sum of four hundred ninety-eight thousand six hundred thirty-two dollars and seventy cents ($498,632.70) lawful money of the United States, by these presents: THE CONDITION OF THIS OBLIGATION is such that in the event Principal shall faithfully and properly complete the Work required by the Contract Documents described in the Agreement and perform all of its duties, obligations, covenants, and conditions pursuant to the terms of the Contract Documents during the original term thereof, and any extensions thereof which may be granted by the City, including, without limitation, all warranty obligations and duties and if the Principal shall satisfy all claims and demands incurred under such Agreement, and shall fully indemnify and hold harmless the City from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the City for all outlay and expense which the City may incur in making good any default, then this obligation shall be void, otherwise to remain in full force and effect. PROVIDED FURTHER, Surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Work or to the specifications. PROVIDED FURTHER, that it is expressly agreed that the bond shall be deemed amended automatically and immediately, without formal and separate amendments hereto, upon amendment to the Agreement not increasing the Agreement price more than twenty percent (20%), so as to bind the Principal and the Surety to the full and faithful performance of the Agreement as so amended. The term "Amendment", 56 wherever used in this bond, and whether referring to this bond or the Agreement, shall include any alteration, addition, extension, or modification of any character whatsoever. The Performance Bond above is accepted by the City this day of , 20 CONTRACTOR AS PRINCIPAL (Signature) Printed Name: Title: I hereby certify that (1) 1 have authority to execute this document on behalf of Surety; (2) Surety has an A.M. Best rating of A- or better; (3) Surety is named in the current list of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies: as published in Circular 570 (most current revision) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury; and (4) Surety is duly licensed to issue bonds in the State of Missouri and in the jurisdiction in which the Project is located. SURETY By: (Signature) Printed Name: Title: Date: Note: • Date of Bond must NOT BE PRIOR TO DATE OF AGREEMENT. • If Contractor is a partnership, all partners must execute the Bond. SURETY POWER OF ATTORNEY MUST BE ATTACHED 57 EXHIBIT B PAYMENT BOND KNOW ALL PERSONS BY THESE PRESENTS: that Custom Lighting Services, LLC dba Black and McDonald, hereinafter called Principal, and , hereinafter called Surety, are held and firmly bound unto the CITY OF RIVERSIDE, MISSOURI ("City"), and unto all persons, firms and corporations who or which may furnish labor, or who furnish materials to perform as described under the Agreement and Contract Documents more fully described below and to their successors and assigns in the total aggregate penal sum of four hundred ninety-eight thousand six hundred thirty-two dollars and seventy cents ($498,632.70) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION is such that WHERVAS, the Principal entered into a certain Agreement with the City, dated the day of _ , 20 , for the construction of HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS (PROJECT: 620-228) approved by Resolution No. NOW, THEREFORE, in the event Principal shall pay the prevailing hourly rate of wages for each craft or type of worker required to execute the Work required by the Contract Documents described in the Agreement in the locality as determined by the Department of Labor and Industrial Relations of Missouri or by final judicial determination pursuant to the provisions of Sections 290.010 to 290.340 and 290.550 through 290.580, inclusive, of the Revised Statutes of Missouri, and shall timely pay to the proper parties all amounts due for material, machinery, equipment and tools, consumed or used in connection with the construction of such Work, and all insurance premiums, workers' compensation, and all other kinds of insurance, on such Work, and for all labor performed in such Work whether by Principal, Subcontractor, or otherwise, then this obligation to be void, otherwise to remain in full force and effect, and the same may be sued on at the instance of any Subcontractor, material supplier, laborer, mechanic, or other interested party, in the name of the City of Riverside, to the use of such parties, for any breach of the considerations hereof. Surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Work to be performed thereunder shall in any wise affect 58 its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Work. The Payment Bond above is accepted by the City this day of 120 CONTRACTOR AS PRINCIPAL By: (Signature) Printed Name: Title: I hereby certify that (1) I have authority to execute this document on behalf of Surety; (2) Surety has an A.M. Best rating of A- or better; (3) Surety is named in the current list of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies: as published in Circular 570 (most current revision) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury; and (4) Surety is duly licensed to issue bonds in the State of Missouri and in the jurisdiction in which the Project is located. SURETY By: (Signature) Printed Name: Title: Date: Note: • Date of Bond must NOT BE PRIOR TO DATE OF AGREEMENT • If Contractor is a partnership, all partners must execute the Bond. SURETY POWER OF ATTORNEY MUST BE ATTACHED 59 WWI MAINTENANCE BOND TWO YEAR MAINTENANCE BOND Bond Number: CITY OF RIVERSIDE, MISSOURI PROJECT: KNOW ALL MEN BY THESE PRESENTS, that we the undersigned Custom Lighting Services, LLC dba Black and McDonald, hereinafter referred to as "Contractor", and Corporation organized under the laws of the State of and authorized to transact business in the State of , as Surety, are held and finely bound unto the City of Riverside, Missouri hereinafter referred to as "Owner" in the penal sum of two hundred forty-nine thousand three hundred sixteen dollars and thirty-five cents ($249,316.35), lawful money of the United States of America for the payment of which sum, well and truly to be made, we bind ourselves and our heirs, executors, administrators, successors, and assigns, jointly and severally by these presents. THE CONDITION OF THE FOREGOING OBLIGATIONS IS SUCH THAT: WHEREAS, the above bonded Contractor has, on the day of , 20 , entered into a written contract with the aforesaid Owner for furnishing all materials, equipment, tools, superintendence, labor, and other facilities and accessories, for the construction of certain improvements as designated, defined and described in the Contract Documents; a copy of which is made a part hereof by this reference. NOW, THEREFORE, if the said Principal shall construct the improvements in such manner that the same shall endure without need of any repairs (whether resulting from defective materials or defective workmanship) for a period of two (2) years from and after the date of acceptance by the City of Riverside, then this obligation shall be void, otherwise to be in full force and effect in which case Contractor and Surety shall be responsible for the prompt payment of the penal sum to the City for such repairs and/or maintenance including any incidental costs associated therein, including but not limited to the costs of consultants and/or engineering investigations, testing, analysis and any other costs incurred to determine the cause of defect and/or the necessary repair and maintenance and attorney fees incurred in the collection of this Bond. PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract Documents, or the work to be performed thereunder, shall in any way affect its obligation on this bond and it does hereby waive notice of any change, extension of time, alteration, or addition to the terms of the Contract Documents, or to the work. IN TESTIMONY WHEREOF, the said Contractor has hereunto set his hand, and the said Surety has caused these presents to be executed in its name, and its corporate seal to hereunto affixed, by its attorney -in -fact duly authorized thereunto so to do, at on this the day of , 20 60 SURETY COMPANY CONTRACTOR BY (SEAL) BY (SEAL) BY (SEAL) (Attorney -in -fact) BY (SEAL) Accompany this bond with the Attorney-in-Fact's authority from the Surety Company (certified to include the date of the bond.) 61 EXHIBIT D PREVAILING WAGE RATES SNcial Wace Determination: Prevailing hourly rates of wages follow, as determined by the Division of Labor Standards, Jefferson City, Missouri. 62 Missouri Division of Labor Standards WAGE AND HOUR SECTION MIKE KEHOE, Governor Annual Wage Order No. 32 Section 083 PLATTE COUNTY In accordance with Section 290.262 RSMo 2000, within thirty (30) days after a certified copy of this Annual Wage Order has been filed with the Secretary of State as indicated below, any person who may be affected by this Annual Wage Order may object by filing an objection in triplicate with the Labor and Industrial Relations Commission, P.O. Box 599, Jefferson City, MO 65102- 0599. Such objections must set forth in writing the specific grounds of objection. Each objection shall certify that a copy has been furnished to the Division of Labor Standards, P.O. Box 449, Jefferson City, MO 65102-0449 pursuant to 8 CSR 20-5.010(1). A certified copy of the Annual Wage Order has been filed with the Secretary of State of Missouri. Original Signed bv___ — Logan Hobbs, Director Division of Labor Standards Filed With Secretary of State: Last Date Objections May Be Filed: April 9, 2025 March 10, 2025 Prepared by Missouri Department of Labor and Industrial Relations Building Construction Rates for PLATTE County OCCUPATIONAL TITLE "Prevailing Hourly Rate Asbestos Worker $71.19 Boilermaker $34.28' Bricklayer -Stone Mason $64.62 Carpenter $66.80 Lather Linoleum Layer MilW ht Pile Driver Cement Mason $57.71 Plasterer Communication Technician $65.55 Electrician Inside Wireman $75.86 ElKticlan Outside Lineman $34.28' Lineman Operator Lineman - Tree Trimmer Groundman Groundman - Tree Trimmer Elevator Constructor $34.28' Glazier $34.28' Ironworker $71.57 Laborer $50.93 General Laborer First Semi -Skilled Second Semi -Skilled Mason $54.93 Marble Mason Marble Finisher Terrazzo Worker Terrazzo Finisher Tile Setter Tile Finisher OperatingOperaUng Engineer $65.88 Group I Group II Group III Group III -A Group IV Group V Painter $55.19 Plumber $82.42 Pipe Fitter Roofer $61.62 Sheet Metal Worker $79.11 Sprinkler Fitter $70.76 Truck Driver $34.28" Truck Control Service Driver Group I Group 11 Group III Group IV Section 083 •Tne Division of Labor Standards received fewer than 1.000 reportable hours for this occupational title. The public works contracting minimum wage is established for this occupational tlffe using data provided by Missouri Economic Research and Information Center. "The Prevailing Hourty Rate Includes any applicable fringe benefit amounts for each occupational title as defined In RSMo Section 290.210. ANNUAL WAGE ORDER NO. 32 3125 Heavy Construction Rates for PLATTE County OCCUPATIONAL TITLE —Prevailing Hourly Rate Carpenter $67.97 Millwri ht Pile Driver Electrician (Outside Lineman) $34.28' Lineman Operator Lineman - Tree Trimmer Groundman Groundman - Tree Trimmer Laborer $52.48 General Laborer Skilled Laborer Operating Engineer $61.20 I —Group II —Group III —Group Group IV Truck Driver $53.30 Truck Control Service Driver Group I Group II Group III Group IV Section 083 Use Heavy Construction Rates on Highway and Heavy construction in accordance with the classifications of construction work established in 8 CSR 30-3.040(3). Use Building Construction Rates on Building construction in accordance with the classifications of construction work established in 8 CSR 30-3.040(2). If a worker is performing work on a heavy construction project within an occupational title that is not listed on the Heavy Construction Rate Sheet, use the rate for that occupational title as shown on the Building Construction Rate Sheet. 'The Division of Labor Standards received fewer than 1,000 reportable hours for this occupational title. Public works contracting minimum wage is established for this occupational title using data provided by Missouri Economic Research and Information Center. "The Prevailing Hourly Rate includes any applicable fringe benefit amounts for each occupational title. ANNUAL WAGE ORDER NO. 32 3125 OVERTIME and HOLIDAYS OVERTIME For all work performed on a Sunday or a holiday, not less than twice (2x) the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed or the public works contracting minimum wage, whichever is applicable, shall be paid to all workers employed by or on behalf of any public body engaged in the construction of public works, exclusive of maintenance work. For all overtime work performed, not less than one and one-half (1'/2) the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed or the public works contracting minimum wage, whichever is applicable, shall be paid to all workers employed by or on behalf of any public body engaged in the construction of public works, exclusive of maintenance work or contractual obligation. For purposes of this subdivision, "overtime work" shall include work that exceeds ten hours in one day and work in excess of forty hours in one calendar week; and A thirty -minute lunch period on each calendar day shall be allowed for each worker on a public works project, provided that such time shall not be considered as time worked. HOLIDAYS January first; The last Monday in May; July fourth; The first Monday in September; November eleventh; The fourth Thursday in November; and December twenty-fifth; If any holiday falls on a Sunday, the following Monday shall be considered a holiday. ANNUAL WAGE ORDER NO. 32 3/25 EXHIBIT E Time for Completion HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS (Proiett No. 620-228) Time for Completion: March 31, 2026 63 EXHIBIT F SCOPE OF WORK for HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS (Proiect No. 620-228) Contractor shall perform the following Work as more fully set forth in the Contract Documents: All Work necessary to construct the HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS as shown on and in accordance with the Technical Specifications and/or Drawings referred to in Exhibit G to the Agreement. The Work in the Project shall include but is not limited to the following: • Demolition and Site Preparation • Construction Staking • Traffic Signal Installation • Pavement Striping • Temporary Traffic Control • Site Restoration Contractor to provide all equipment, labor, and material necessary to pertonn the Project construction and related work as shown in the Contract Documents. The Work includes, but is not limited to, the following: I . Schedule and Coordinate all necessary inspections. 2. Contractor shall coordinate with all utilities prior to the work starting, including contacting underground locator services. 3. Include all temporary utility fees and permits. 4. Include 3rd party Special Inspections as required to demonstrate compliance with project specifications, including but not limited to compaction and material testing. 5. Include all surveying. layout and field engineering required for the performance of this work. 6. Provide digital photographs of the preconstruction, construction, and post construction site (see Article IV Progress of Work / Submittals (F) for specifics) 7. Provide all weather provisions to meet the schedule set forth in the contract documents. 8. Provide clean up associated with the contractors work. Site is to remain free of debris during the construction process. 9. Provide all traffic control as required throughout the construction process. See drawings for project location. 64 EXHIBIT G TECHNICAL SPECIFICATIONS HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS (Project No. 620-228) The following Specifications govern Contractor's performance of the Work: ENUMERATION OF SPECIFICATIONS AND ADDENDA: Following are the Specifications and Addenda governing the work, which form a part of this contract, as set forth the Contract Documents: SPECIFICATIONS: Division 1— General Requirements Section Description 01015 ONTRACTOR USE OF PREMISES 01030 PECIAL CONDITIONS 01040 COORDINATION 01270 MEASUREMENT AND PAYMENT 01310 JOB SITE ADMINISTRATION 01330 SUBMITTALS 01410 TESTING LABORATORY SERVICES 01524 WASTE AREA, MATERIAL STORAGE AND SITE APPEARANCE Division 2 — Site Work Section Description 02350 EROSION AND SEDIMENT CONTROL 02510 ASPHALT PAVEMENTS 02520 'ORTLAND CEMENT CONCRETE PAVING Division 3 — Project Special Provisions Section Description 1 ENERAL REQUIREMENTS 2 AWING 3 TRAFFIC SIGNAL INSTALLATION (HORIZONS PKWY AND NW MUSIC LVD) 4 REMOVING EXISTING SIGNS 65 5 TEMPORARY TRAFFIC CONTROL 6 CONTRACTOR CONSTRUCTION STAKING ADDENDA: No. n/a Date No. Date No. Date 66 EXHIBIT H CITY OF 2y�RIVERS Upstream from ordinary. NOTICE TO PROCEED DATE: 2025 PROJECT: HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS PROJECT NO.: 620-228 RESO: 2025- (approved Sept. 23, 2025) TO: Contractor: Custom Lighting Services, LLC dba Black and McDonald (address) 6900 Executive Drive Kansas City, MO 64120 You are hereby notified to commence work on or after the day of , 2025 in accordance with the Agreement dated Sept. 23, 2025. The date of substantial completion is 03/31 /2026. The project shall be completed and ready for final payment by 04/15/2026. CITY OF RIVERSIDE BY: Brian E. Koral, City Administrator Receipt of the above NOTICE TO PROCEED is hereby acknowledged BY: (Signature) (Title) (Company) this the day of , 2025. 67 EXHIBIT I APPLICATION FOR PAYMENT Continuation Sheet for Application for Payment (Contact Capital Projects and Parks Manager, Noel Bennion with the City of Riverside for an electronic version n ben nion,a�riversidemo.gov or by calling 816-451-8227) MY OF PAY APPLICATION NO. Project ND.-F- 7- _7 .4 =0 K= heed 0 Of PP Attad6 F* VaOA : NWd-ig 1?yS"T!(kd 0 0M. $ 4-F. -B -! C M QW-6 A.OWA (I'm I -/. u- 2V $ oll —VA-W of S(Wed MAKUWto Dow H $ =*L. -* — - - ----------- -- $ Affmano )ue Wds AppilaftnS . ....... . . ..... . .. ....... . ..... J -4 - -CONMACIMI -C9WMWT + eaewaaweCOMW mftrw 10 now al RD as wax ff!Aw�rdb W4 .ndffbb aW plfti-1 JMWMWn "Do.qDrINVAH" -14FqP)*V*Wk""1V CaWKW I& VJMW V p"MM W!t!e AMOWT,. 9T ',C9"MS Jy I -- - - -- - --We NVW Prf"d lum Pdftd --T 3 Dow DIW I -1-- i T BOW Do 'T — 091 T 68 EXHIBIT J CHANGE ORDER (Contact Capital Projects and Parks Manager, Noel Bennion with the City of Riverside for an electronic version n ben nion(a-:,riversidemo.p-ov or by calling 816-451-8227.) CTTT Of CRAKE ORDER NO. pstora Contractor Nome: Pap. . m~ 1.41 1 !E tow, 1 v The fasomng chorigas to the ortginai wrtnct amount ware r*qLimd to Cow cost Zo;Wi7y' tairto Lou/en: Fborside. Wasouri Ott Cortreclot or to reset!samrtgs wfized by the Corvaclor as a rest* o1a Oange in Die I I actual comMucted qmrdrfies from the e stimated qterCbes Shown on Va &d Proposal 7_ ___ .u;_. I smoPID CHANGE$ ii POW36fT CCWTNACT New New Nor New or LheClem No. C= lamD-4pd— A R.-m for Ch.W Odw Ad*e 0 'WSled AthpWed W Sc 00 --I $0,00 so, DO Poo $000 S000 ProMous Tdal SOAQ $D 00 t------ fft AmoLfft of Pr@V" 560D - i- SOAD ?V10 TNS Req�.-sl dym - —1 V Sabo Now C.mMd Amowd $600 L I ODIVA)I- J ME!11qM gNGMEER, IIr PITY Pf RIVERSIDE, ""Qkft Trask Hocmw. 8*.s P*1 AdM!q!q"0r:j m OdKorml, S'W" I CONTRACT 'ON -SITE PROJECT MAWdik CONTRACTO" COAMCAWn iof ctunie oyftr. :6k4ME PROJECT MANAGO CeMft;-- for Chavine 0Cder --a- 9*1 a 0— 11 seasnw ttM W. CW*.d D­rY 0. —WW ab­.bm, rd Wm* 1. V. co?Tl?�� .i= f. domm tm —ift - Tr�?!Lm� go 7 J 69 CM OF RIVERS P4KV * EXHIBIT K Certificate of Substantial Completion ito be completed after substantial completion of the rroiect i Project Name: HORIZONS PARKWAY AND MUSIC Project #: 620-228 BOULEVARD INTERSECTION IMPROVEMENTS Reouestor of Project: City of Riverside This (tentative) [definite] Certificate of Substantial Completion applies to: ❑ All Work under the Contract Documents: ❑ The following specified portions of the Work: Date of Substantial Completion The Work to which this Certificate applies has been inspected by authorized representatives of the City, Contractor, and the Engineer, and found to be substantially complete. The Date of Substantial Completion of the Project or portion thereof designated above is hereby declared and is also the date of' commencement of applicable warranties required by the Contract Documents, except as stated below. A [tentative] [definitive] list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. The responsibilities between the City and Contractor for security, operation, safety, maintenance, heat, utilities, insurance and warranties shall be as provided in the Contract Documents except as amended as follows: ❑ Amended Responsibilities L-1 Not Amended The City's Amended Responsibilities: Contractor's Amended Responsibilities: -n The following documents are attached to and made part of this Certificate: This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of Contractor's obligation to complete the Work in accordance with the Contract Documents. Executed by Engineer (Print & Sign) Accepted by Contractor (Print & Sign) Accepted by the City (Print & Sign) 71 Date Date Date EXHIBIT L AFFIDAVIT OF COMPLIANCE WITH THE PREVAILING WAGE LAW (to be completed at conclusion of project) upon being duly sworn upon my oath state that: (1) I am the of (2) all requirements of Section 290.210 to 290.340. RSMo, pertaining to the payment of wages to workers employed on public works projects have been fully satisfied with regard to this Contractor's work on HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS (Project No. 620-228); (3) 1 have reviewed and am familiar with the labor standards provisions and prevailing wage rules established by the Missouri Department of Labor and Industrial Relations Division of Labor Standards; (4) based upon my knowledge of these rules, including all occupational titles set out in the applicable regulations, I have completed full and accurate records clearly indicating: (a) the names, occupations, and crafts of every worker employed by this Company in connection with this Project together with an accurate record of the number of hours worked by each worker and the actual wages paid for each class or type of work performed, (b) the payroll deductions that have been made for each worker, and (c) the amounts paid to provide fringe benefits, if any, for each worker; (5) the amounts paid to provide fringe benefits, if any, were irrevocable paid to a trustee or to a third party pursuant to a fund, plan, or program on behalf of the workers; (6) these payroll records are kept and have been provided for inspection to the authorized representative of the City of Riverside and will be available, as often as may be necessary, to such City and such other regulatory agencies as may be deemed necessary; (7) such records shall not be destroyed or removed from the State of Missouri for one (1) year following the completion of Contractor's work on this Project; (8) when in effect, the requirements of Sections 290.550 through 290.580 RSMo. Pertaining to excessive unemployment were fully satisfied; and (9) there has been no exception to the full and complete compliance with the provisions and requirements of the wage orders applicable to the Agreement and Contract Documents. The matters stated herein are true to the best of my information, knowledge, and belief. I acknowledge that the falsification of any information set out herein may subject me to criminal prosecution. Contractor Signature Printed Name Subscribed and sworn to me this day of , 20 My Commission expires. Notary Public 72 EXHIBIT M ANTI -DISCRIMINATION AGAINST ISRAEL ACT CERTIFICATION Pursuant to RSMo. §34.600, a public entity shall not enter into a contract to acquire or dispose of services, supplies, information technology. or construction valued at $100,000, or with a contractor having ten or more employees, unless the contract includes a written certification that the person or company is not currently engaged in, and shall not, for the duration of the contract, engage m a boycott of., Goods or services from the State of Israel, Companies doing business in, or with, Israel Companies authorized by, licensed by, or organized under, the laws of the State of Israel; or Persons or entities doing business in the State of Israel. For a definition of the term "boycott", please refer to RSklo. §34.600.3. By signing below, the entity agrees and certifies that it does not currently, and will not for the duration of this contract, engage in any of the types of boycotts listed above, Contractor: Jerry Proch B��: ...�. Name: Jerry Prochko Title: Department Manager 73 EXHIBIT N CONTRACTOR AFFIDAVIT FOR FINAL PAYMENT (to be completed at conclusion ofproiect) HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS (Protect No. 620-228) STATE OF _ ) SS: COUNTY OF _ ) The Undersigned, of lawful age, being first duly sworn, states under oath as follows: 1. I am the of who is the general CONTRACTOR on the above referenced project. 2. All payrolls, material bills, use of equipment and other indebtedness connected with the Work for this Project have been paid and all Claims of whatever nature have been satisfied, as required by the Contract. 3. (❑) Prevailing wage does not apply; or (❑) All provisions and requirements set forth in Chapter 290. Section 290.210 through and including 290.340. Missouri Revised Statutes, pertaining to the payment of wages to workmen employed on public works projects have been fully satisfied and there has been no exception to the full and complete compliance with these provisions and requirements and the Mutual Wage Order contained in the Contract in carrying out the Contract and Work. CONTRACTOR has fully complied with the requirements of the prevailing wage law as required in the Contract and has attached affidavits from all Subcontractors on this Project, regardless of tier, affirming compliance with the prevailing wage law as stipulated in the Contract. 4. CONTRACTOR certifies that each Subcontractor has received full payment for its respective work in connection with the Contract. 5. This affidavit is made in behalf of the CONTRACTOR for the purpose of securing from the City of Riverside, Missouri, the certification of completion of the Project and receiving payment therefore. CONTRACTOR By Title On this day of 20_ before me appeared to me personally known to be the of I and who executed the foregoing instrument and acknowledged that (s)he executed the same on behalf of as its free act and deed. IN WITNESS WHEREOF, 1 have hereunto set my hand and affixed my official seal on the day and year first above written. My commission expires: Notary Public 74 EXHIBIT O SUBCONTRACTOR AFFIDAVIT FOR FINAL PAYMENT (to be completed at conclusion of project) HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS (Proiect No. 620-228) STATE OF SS: COUNTY OF After being duly sworn the person whose name and signature appears below hereby states under penalty of perjury that: 1. I am the duly authorized officer of the business indicated below (hereinafter Subcontractor) and I make this affidavit on behalf of Subcontractor in accordance with the requirements set forth in Section 290.290, RSMo. Subcontractor has completed all of the Work required under the terms and conditions of a subcontract as follows: Subcontract with: _, Contractor Work Performed: Total Dollar Amount of Subcontract and all Change Orders: $ 2. Subcontractor fully complied with the provisions and requirements of the Missouri Prevailing Wage Law set forth in Sections 290.210, RSMo through 290.340, RSMo. Business Entity Type: LJ Missouri Corporation �) Foreign Corporation �) Fictitious Name Corporation (_) Sole Proprietor �) Limited Liability Company �) Partnership �) Joint Venture L� Other (Specify)_ Subcontractor's Legal Name and Address Phone No. Fax: E:mail: Federal ID No. I hereby certify that I have the authority to execute this affidavit on behalf of Subcontractor. By: _ (Signature) (Title) NOTARY Subscribed and sworn to before me this (Print Name) (Date) day of My Commission Expires: (Signature) 75 , 20 EXHIBIT P ENGINEER/CONSULTANT'S CERTIFICATION For Acceptance and Final Payment (to be completed at conclusion of project) City of Riverside, Missouri Project Name: HORIZONS PARKWAY AND MUSIC BOULEVARD INTERSECTION IMPROVEMENTS Project No: 620-228 Contractor: Contract Date: Date of Completion and Acceptance: The Contractor has notified me that he has completed all work in accordance with the Contract Documents and that it is functioning properly. I hereby certify that a final inspection of all work under the Contract Documents was conducted by me and to the best of my knowledge; the work has been completed in accordance with the drawings and specifications and is functioning properly. I have approved all payment estimates, and prepared and received approval of all change orders. I have received the required certifications; instructions for operating the equipment, manuals, and other documents that are applicable to this project from the Contractor and have delivered them to the City. The City is now responsible for the security, operation, safety, maintenance, and insurance as applicable to the project. The Contractor will warranty all specified work for a period of one (1) year (or a longer period if governed by Missouri Statutes) from this date of completion. Notification has been given to the proper Government agencies that the work is completed. I recommend, under the provision of the Contract Documents that the Work be accepted and that final payment be made. Executed by the Engineer on this _ day of 20 Signature: (SEAL) Typed Name: _ cc: Contractor DIVISION 1- GENERAL REOUIREMENTS V&A 01015 CONTRACTOR USE OF PREMISES The Contractor shall confine all construction activities to the limits of the project right-of-way and easements. Any additional easements and access to private property that are desired outside the project limits are the responsibility of the Contractor. If the Contractor desires access to private property that is outside the project limits, the Contractor shall obtain a written agreement between the Property Owner and the Contractor and submit this written agreement to the City prior to accessing the private property. 01030 SPECIAL CONDITIONS A. Examination of the Site: Bidders may visit the site and inform themselves of all conditions presently existing. Failure to visit the site will in no way relieve the successful bidder from the necessity of furnishing all materials and performing all work required to complete the work in accordance with the specifications. B. Measurements: Any dimensions provided shall be verified by the Contractor. Any discrepancies between the specifications and the existing conditions shall be referred to the Owner for adjustment, before the work is performed. C. Protection of Monuments: The Contractor must carefully preserve bench marks. references or stakes and in case of willful or careless destruction, shall be charged with the resulting expense and shall be responsible for any mistakes that may be caused by their unnecessary loss or disturbance. D. Breakaue and DamaLe: The Contractor shall be responsible for any breakage, damage or other injury to existing or new facilities caused directly or indirectly by the Contractor's operations and shall replace, at Contractor's own expense, in a manner approved by the Owner any such broken or damaged material. E. Deliver of Materials: The delivery of all materials, equipment, and miscellaneous items entering into the construction of the work is a part of this contract, including freight and hauling charges both to and from transportation points. Payment of charges for the above items shall be made by the Contractor, except items designated as being provided by the City. An amount covering all charges for freightage and delivery of items shall be included as a part of the contract price and in no case will an extra be allowed for such charges. F. Storaee of Materials: All materials delivered to the job shall be stored so as to keep them in first class condition and free from deterioration or contamination. G. Coordination: All contractors, subcontractors and trades shall cooperate in coordination of their several works, but the principal responsibility for coordinating the project as a whole and the operations of the contractors and subcontractors shall lie with the Prime Contractor. H. Blastinc: No blasting will be allowed on this project. /e 01040 COORDINATION: A. All construction activities shall be coordinated with all utility owners and the City of Riverside. Contractor shall be responsible for notifying all utility owners with facilities within the project limits prior to construction so the utilities can be located and identified. B. All construction activities shall be coordinated with adjacent property owners affected by construction of the project to assure access to their properties. Driveways to adjacent properties shall be accessible at the end of each working day. C. The Contractor will be responsible for notifying the Resident Project Representative a minimum of 48 hours in advance in writing of the dates when construction will begin and end. The City will notify the school district, fire, and police departments, and the local newspapers. D. The Contractor shall be responsible for obtaining all necessary permits, and paying for any and all inspection and permit fees as required by the City. E. Proiect Coordination Meetings: In addition to the above said coordination responsibilities, the Contractor shall attend construction progress meetings with the Resident Project Representative on a monthly basis (at a minimum). Additional meetings may be held as needed. No direct payment will be made for this item but shall be considered subsidiary to other bid items. F. The Contractor shall coordinate his/her work to ensure that the Work is complete and to ensure efficient and orderly sequence of installation of construction elements. G. In the event certain parts of work are assigned to subcontractors, the Contractor shall be responsible to ensure each subcontractor completes work and that all interfaces between trades are properly addressed. All subcontractors shall also coordinate their work with the Owner through the Contractor. H. The Contractor is solely responsible for all Assignments of Work among subcontractors. I. The Contractor shall be responsible for assigning and coordinating work and ensuring that suppliers and installers are familiar with all requirements in Contract Documents relating to each item of work, regardless of location of information in Contract Documents. 01270 MEASUREMENT AND PAYMENT A. The quantities as given in the Bid Form are not guaranteed to be the exact or total quantities required for the completion of the Work shown on the drawings and described in the specifications. Increases or decreases may be made over or under the Bid Form estimated quantities to provide for needs that are determined by the Owner during the process of the Work. Contract unit prices shall apply to such increased or decreased quantities. The Bidder is warned against unbalancing his bid, since the unit prices will apply to deductions as well as additions. The Owner has the privilege of omitting or adding to any unit items in the Bid Form. 79 B. The Contractor agrees that he will make no claim for damages, anticipated profits, or otherwise, on account of any difference between the amounts of Work actually performed and materials actually furnished and the estimated amounts thereof. The Owner will not pay for or be responsible for unused materials which may have been ordered by the Contractor in accordance with the estimated quantities listed in the Bid Form. C. It is the intent of the Contract Documents that all costs in connection with the Work, including furnishing of all materials, equipment, supplies and appurtenances; providing all construction plant, equipment, and tools; and performing of all necessary labor to fully complete the Work, shall be included in the unit and lump sum prices named in the Bid Form. No item of Work that is required by the Contract Documents for the proper and successful completion of the Contract will be paid for outside of or in addition to the prices submitted in the Bid Form. All Work not specifically set forth in the Bid Form as a pay item shall be considered a subsidiary obligation of the Contract, and all cost in connection therewith shall be included in the process named in the Bid Form. D. if item does not appear in the Bid Form, or if said item is a part of another item listed in the Bid Form, it will not be measured for payment. E. Whenever in the Bid Form there is a discrepancy between unit prices and extensions or totals, the unit prices will govern, and the extensions or totals will be corrected accordingly. F. Items for payment will be measured in accordance with the stipulations of these specifications and as further shown on the drawings. Pay limits given are maximum, and where actual quantities of work items are less than as computed by said pay limits, the Contractor will be paid only for the actual quantities. G. Payment will be made as the sum of the following: 1. Final authorized quantity of each item in the Bid Form multiplied by the contract unit price therefore. 2. Lump sum payment for each item so listed in the Bid Form, at the contract lump sum price therefore. 3. Any special payment or adjustment, plus or minus, as provided for in the Agreement. 01310 JOB SITE ADMINISTRATION A. The Contractor, or a duly authorized representative to act for the Contractor, shall continually be present at the site of the work, whenever construction activities are underway, for the duration of this project. B. The Contractor shall designate, in writing, the duly authorized representative(s) at the preconstruction meeting. The duly authorized representative(s) will be the official liaison between the Owner and Contractor regarding the signing of pay estimates, change orders, workday reports and other forms necessary for communication and project status inquiries. Upon 80 project commencement, the Owner shall be notified, in writing, within five (5) working days of any changes in the Contractor's representative(s). 01330 SUBMITTALS A. Shop Drawings: A minimum of two (2) copies each of manufacturer's shop drawings and data sheets shall be submitted to the Owner indicating the necessary installation dimensions, weights, materials and performance information. The shop drawings shall be distributed as follows: One (1) copy for the City and one (1) copy for the prime Contractor. The Contractor shall supply additional copies as necessary for any subcontractors. Submittals for equipment and materials shall include reference to indicate where it is to be used; whether by tag number, specification paragraph, or description of use. Approval of shop drawings will be for conformance with the design concept of the project and for compliance with the information given in the Technical Specifications. The approval of a separate item, as such, will not indicate approval of the assembly in which the item functions. Submittals: Required submittals include but are not limited to the following: 1.1 Aggregate (other than those used in pavements or structures) A.Gradation Test Results B.Soundness Test Results 1.2 Fill Material A. Source for Material B. Moisture -Density Relationships 1.3 Concrete Mix Design (For Each Mix used on the Project) A. Source of Materials B. Concrete Manufacturer's Name C. Testing Laboratory Name D. Results of the Mix Design 1) Compressive Strength 2) Air Content 3) Slump 4) Cement Content 5) Water Content 6) Fine Aggregate a) Gradation Test Results b) Soundness Test Results 7) Coarse Aggregate a) Gradation Test Results b) Soundness Test Results 8) Additives as called for in plans or specifications 9) Certification of Reinforcing Steel 10) Certification of Fly Ash (if used) 81 1.4 Soil -Fly Ash Mixture or approved equal A. Fly ash material B. For soil -fly ash mixture (with specified % of fly ash) for each different type of soil anticipated to be used in the pavement subgrade stabilization: C. ASTM D558 modified to a 2 hour delay. At each moisture content, strength testing (ASTM D 1633) modified to curing sealed for 7 days at 100 degrees (F) shall be performed. 1.5 Pavement Marking Materials A. Certification that all materials used are in compliance with specifications included herein 1.6 Silt Fence A. Manufacturer's information showing compliance with KCAPWA. 1.7 Utility Conduits A. Certification that all materials used are in compliance with specifications included herein. 01410 TESTING LABORATORY SERVICES A. General: Work under this item shall consist of furnishing all materials, labor and equipment necessary for a private testing laboratory to provide the material testing for items incorporated into the project. The tests, frequency and reports required to confirm contract compliance shall be as specified in the KCAPWA Standard Specifications unless otherwise noted below: One copy of the test results shall be submitted to the Owner electronically within 24 hours of the test completion. The testing lab must be agreed upon by the Contractor and the Owner. B. Payment: No direct payment shall be made. This item shall be considered subsidiary to the bid items of the materials being tested. 01524 WASTE AREA, MATERIAL STORAGE AND SITE APPEARANCE A. General: The Contractor shall make his own arrangements for material and equipment storage areas and non -soil waste area. The Contractor shall keep the site clean and free of all refuse, rubbish, scrap materials, and debris as a result of construction activities so that at all times the site of the work shall present a neat, orderly and workmanlike appearance. This includes the removal of earth and debris from streets and roads that resulted from the Contractor's activity. The Contractor shall restore the site of work and adjacent disturbed areas to the condition existing before work began as a minimum. B. Payment: No direct payment shall be made. 82 DIVISIOIti 2 - SITEWORK 02350 EROSION AND SEDIMENT CONTROL A. General: Erosion and sediment control shall be in accordance with KCAPWA Standard Specifications Section 2150. 1. The Contractor is responsible for providing sufficient control of sediment and erosion to prevent migration of sediment off the construction site throughout the duration of the project. 2. All sediment escaping the project site and entering the downstream ditches shall be removed immediately at the expense of the Contractor. If the existing vegetation is damaged by the sediment, or by the removal of the sediment, it shall be replaced with like vegetation at the expense of the Contractor. B. PaN ment: No direct payment will be made. 02510 - ASPHALT PAVEMENTS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Under this section of the Specifications, the Contractor shall provide all labor, materials, tools and equipment necessary to complete the following items of work: 1. Bituminous concrete pavements. 1.2 RELATED WORK NOT INCLUDED IN THIS SECTION A. Earthwork: Section 02300 of this Manual. B. Materials and testing shall be in accordance with the latest edition of KCAPWA. 1.3 UNIT PRICE - MEASUREMENT AND PAYMENT A. Asphaltic Pavement: 1. Basis of Measurement: See units on bid form. 2. Basis of Payment: Includes all labor, equipment and materials necessary for mix design, supplying to site, testing, forming, placement, tack coat, curing, protection, joint sealing and backfilling. PART 2 - MATERIALS 2.1 ASPHALT MATERIALS A. Conform to KCAPWA 2.2 ASPHALT ACCESSORIES 84 A. Tack Coat: Homogeneous, medium curing, liquid asphalt, Type RC-70. 2.3 ASPHALT PAVING MIX A. Full Depth Patch: Type 5-01. B. 2" Edge Mill and Overlay and 2" Overlay: Type 6-01. C. Asphalt Hot Mix Recycling, if used, shall comply with KCAPWA. 2.4 SOURCE QUALITY CONTROL A. Provide tests of mix design for asphalt. B. Submit proposed mix design of each class of mix for review prior to commencement of work. PART 3 - EXECUTION 3.1 TESTING A. The Contractor shall provide and pay for the services of a qualified, independent testing laboratory to insure that the bituminous concrete mix designs and in -place thicknesses and densities of base and surface courses are in compliance with all the provision of the specifications. Asphaltic concrete testing shall meet KCAPWA standards. 3.2 INSTALLATION OF BITUMINOUS CONCRETE PAVEMENT A. Bituminous concrete pavements shall be constructed in accordance with the applicable section of KCAPWA except as herein amended. B. Apply a tack coat of emulsified asphalt to all vertical contact surfaces of existing pavement, manholes, catch basins, curbs and all other contact surfaces prior to paving. 3.4 CLEAN-UP A. Upon completion of the work, all surplus materials, debris, tools and equipment shall be removed from the site. END OF SECTION 02510 02520 - PORTLAND CEMENT CONCRETE PAVING PART 1 GENERAL 1.1 SECTION INCLUDES A. Concrete curb and gutter, flatwork and driveways. 85 1.2 UNIT PRICE - MEASUREMENT AND PAYMENT A. Concrete Curb and Gutter: I . Basis of Measurement: By the lineal foot. 2. Basis of Payment: Includes all labor, equipment and materials necessary for mix design, supplying to site, testing, forming, placement, curing, protection, joint sealing and backfilling. B. Concrete Flatwork: l . Basis of Measurement: By the square foot. 2. Basis of Payment: Includes all labor, equipment and materials necessary for mix design, supplying to the site, testing, forming, placement, curing, protection, joint sealing and backfilling. 1.3 MIX DESIGN A. The material shall be in accordance with the Kansas City Metro Materials Board, KCMMB4K design mix. 1.4 REFERENCES A. Division ll, Construction and Materials Specifications for Paving, Section 2200, and Incidental Construction, Section 2300, Kansas City Metropolitan Chapter of the American Public Works Association Standard Specifications (Current Edition) together with all additions, deletions and changes prescribed by the City of Riverside, Missouri, one copy of which shall be kept on site at all times. 1.5 SUBMITTALS A. Submit under provisions set forth in General and Special Conditions and Division 1 of these specifications. B. Product Data: Provide data on mix design, joint filler, admixtures, and curing compounds. 1.6 QUALITY ASSURANCE A. The Contractor is responsible for placing concrete when conditions are conducive to proper curing. A. Perform work in accordance with KCAPWA Standard Specifications and the requirements of the City of Riverside, Missouri. C. Obtain materials from same source throughout. PART 2 EXECUTION 86 2.1 EXAMINATION A. Verify that subgrade is compacted as specified in KCAPWA Section 2100, Grading and Site Preparation and ready to support paving and imposed loads. City Engineer shall approve all subgrade. 2.2 PREPARATION A. Moisten base to minimize absorption of water from fresh concrete. B. Verify that manholes, inlets or any other structures have been brought to the proper elevation, grade and alignment prior to placing concrete. Coat surfaces of manholes, curb inlets, existing structures and frames with oil to prevent bonding with concrete. C. Notify City a minimum of 24 hours prior to commencement of concreting operations. 2.3 CLEANUP A. The Contractor shall be responsible for removal from the site of excess concrete, rock, dirt, debris and any broken concrete. Clean up shall take place as work progresses. B. Contractor shall be responsible for the repair of any existing pavement, curb, sidewalk or driveway damaged or disturbed during construction to the satisfaction of the City. END OF SECTION 02520 DIVISION 3 - PROJECT SPECIAL PROVISIONS 6R 02350 EROSION AND SEDIMENT CONTROL A. General: Erosion and sediment control shall be in accordance with KCAPWA Standard Specifications Section 2150. 1. The Contractor is responsible for providing sufficient control of sediment and erosion to prevent migration of sediment off the construction site throughout the duration of the project. 2. All sediment escaping the project site and entering the downstream ditches shall be removed immediately at the expense of the Contractor. If the existing vegetation is damaged by the sediment, or by the removal of the sediment, it shall be replaced with like vegetation at the expense of the Contractor. B. Payment: No direct payment will be made. 02510 - ASPHALT PAVEMENTS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Under this section of the Specifications, the Contractor shall provide all labor, materials, tools and equipment necessary to complete the following items of work: 1. Bituminous concrete pavements. 1.2 RELATED WORK NOT INCLUDED IN THIS SECTION A. Earthwork: Section 02300 of this Manual. B. Materials and testing shall be in accordance with the latest edition of KCAPWA. 1.3 UNIT PRICE - MEASUREMENT AND PAYMENT A. Asphaltic Pavement: 1. Basis of Measurement: See units on bid form. 2. Basis of Payment: Includes all labor, equipment and materials necessary for mix design, supplying to site, testing, forming, placement, tack coat, curing, protection, joint sealing and backfil ling. PART 2 - MATERIALS 2.1 ASPHALT MATERIALS A. Conform to KCAPWA 2.2 ASPHALT ACCESSORIES 84 A. Tack Coat: Homogeneous, medium curing, liquid asphalt, Type RC-70. 2.3 ASPHALT PAVING MIX A. Full Depth Patch: Type 5-01. B. 2" Edge Mill and Overlay and 2" Overlay: Type 6-01. C. Asphalt Hot Mix Recycling, if used, shall comply with KCAPWA. 2.4 SOURCE QUALITY CONTROL A. Provide tests of mix design for asphalt. B. Submit proposed mix design of each class of mix for review prior to commencement of work. PART 3 - EXECUTION 3.1 TESTING A. The Contractor shall provide and pay for the services of a qualified, independent iesting laboratory to insure that the bituminous concrete mix designs and in -place thicknesses and densities of base and surface courses are in compliance with all the provision of the specifications. Asphaltic concrete testing shall meet KCAPWA standards. 3.2 INSTALLATION OF BITUMINOUS CONCRETE PAVEMENT A. Bituminous concrete pavements shall be constructed in accordance with the applicable section of KCAPWA except as herein amended. B. Apply a tack coat of emulsified asphalt to all vertical contact surfaces of existing pavement, manholes, catch basins, curbs and all other contact surfaces prior to paving. 3.4 CLEAN-UP A. Upon completion of the work, all surplus materials, debris, tools and equipment shall be removed from the site. END OF SECTION 02510 02520 - PORTLAND CEMENT CONCRETE PAVING PART I GENERAL 1.1 SECTION INCLUDES A. Concrete curb and gutter, flatwork and driveways. 85 1.2 UNIT PRICE - MEASUREMENT AND PAYMENT A. Concrete Curb and Gutter: 1. Basis of Measurement: By the lineal foot. 2. Basis of Payment: Includes all labor, equipment and materials necessary for mix design, supplying to site, testing, forming, placement, curing, protection, joint sealing and back -filling. B. Concrete Flatwork: 1. Basis of Measurement: By the square foot. 2. Basis of Payment: Includes all labor, equipment and materials necessary for mix design, supplying to the site, testing, forming, placement, curing, protection, joint sealing and backfilling. 1.3 MIX DESIGN A. The material shall be in accordance with the Kansas City Metro Materials Board, KCMMB4K design mix. 1.4 REFERENCES A. Division II, Construction and Materials Specifications for Paving, Section 2200. and Incidental Construction, Section 2300, Kansas City Metropolitan Chapter of the American Public Works Association Standard Specifications (Current Edition) together with all additions, deletions and changes prescribed by the City of Riverside, Missouri, one copy of which shall be kept on site at all times. 1.5 SUBMITTALS A. Submit under provisions set forth in General and Special Conditions and Division I of these specifications. B. Product Data: Provide data on mix design, joint filler, admixtures. and curing compounds. 1.6 QUALITY ASSURANCE A. The Contractor is responsible for placing concrete when conditions are conducive to proper curing. A. Perform work in accordance with KCAPWA Standard Specifications and the requirements of the City of Riverside, Missouri. C. Obtain materials from same source throughout. PART 2 EXECUTION 86 2.1 EXAMINATION A. Verify that subgrade is compacted as specified in KCAPWA Section 2100, Grading and Site Preparation and ready to support paving and imposed loads. City Engineer shall approve all subgrade. 2.2 PREPARATION A. Moisten base to minimize absorption of water from fresh concrete. B. Verify that manholes, inlets or any other structures have been brought to the proper elevation, grade and alignment prior to placing concrete. Coat surfaces of manholes, curb inlets, existing structures and frames with oil to prevent bonding with concrete. C. Notify City a minimum of 24 hours prior to commencement of concreting operations. 2.3 CLEANUP A. The Contractor shall be responsible for removal from the site of excess concrete, rock, dirt, debris and any broken concrete. Clean up shall take place as work progresses. B. Contractor shall be responsible for the repair of any existing pavement, curb, sidewalk or driveway damaged or disturbed during construction to the satisfaction of the City. END OF SECTION 02520 87 DIVISION 3 - PROJECT SPECIAL PROVISIONS 88 CITY OF RVVERS/DE, 80USS0URI HORIZONS PARKWAY AND NW MUSIC BOULEVARD INTERSECTION IMPROVEMENTS PROJECT SPECIAL PROVISIONS 1-GENERAL REQUIREMENTS ............................................................................................... 2 2-SAWING ................................................................................................................................... 6 3'TRAFFIC SIGNAL INSTALLATION (HORIZONS PKWYAND NVVMUSIC BLVD) ..... 6 4-REMOVING EXISTING SIGNS ............................................................................................. 6 5-TEMPORARY TRAFFIC CONTROL .................................................................................... 7 8 CONTRACTOR CONSTRUCTION STAKING .................................................................... 7 3-| CITY OF RIVERSIDE, MISSOURI HORIZONS PARKWAY AND NW MUSIC BOULEVARD INTERSECTION IMPROVEMENTS PROJECT SPECIAL PROVISIONS 1 - GENERAL REQUIREMENTS 1.1 SCOPE OF WORK The work provided for in these Specifications shall consist of furnishing all labor, materials, appliances, and equipment, and performing all work and operations in connection with the construction of items and all other incidental and related work as set forth in these Specifications and as directed by the Engineer to make a complete and finished job. 1.2 CONTRACT SPECIFICATIONS The Specifications that shall govern the materials furnished and work performed in the construction of the work covered by the Contract or Contracts based thereon, are divided, classified, designated, and arranged as shown in the PROJECT SPECIAL PROVISIONS, TABLE OF CONTENTS attached hereto. No attempt has been made in the foregoing designated Specifications to segregate work to be performed by any trade, subcontract, or proposal item, under any one specification. Any segregation between trade or craft jurisdiction limits, and the establishment of subcontract limits, will be solely a matter of agreement between the Contractor and their employees and their subcontractors. The Specifications will govern the construction of the entire work, and the provisions thereof will govern each item and unit of work to which such provisions apply. 1.3 STANDARD SPECIFICATIONS The work shall conform to these Specifications and to the "Standard Specifications" where reference is made herein. Where reference is made in the Specifications and Contract Documents to "Standard Specifications," it shall mean that the reference is made to the current edition of the Kansas City Metropolitan Chapter of the American Public Works Association (APWA) specifications. The following table outlines the APWA sections to be followed for this project: Section Number Section Title 2100 Grading and Site Preparation 2150 Erosion and Sediment Control 2200 Paving 2300 Incidental Construction 2400 Seeding and Sodding 2600 Storm Sewers 2700 Structures 2800 Street Lights Deviations to the Standard Specifications are contained within the project special provisions. S-2 All the work related to the traffic signal installation, pavement marking and signing, temporary traffic control, and fiber interconnect shall utilize the 2024 Missouri Standard Specifications for Highway Construction and current edition of the Standard Plans. 1.4 CONTRACT DRAWINGS The Contract Drawings or "Plans" on which the proposals and contracts are to be based, and which are to be supplemented by additional shop and dimension drawings of material and equipment and other drawings, where specified, are shown in the "Index of Sheets" on the cover sheet of the Plans. 1.5 MOBILIZATION OF EQUIPMENT a. Description Move required personnel, equipment, materials, supplies and incidentals to the project site prior to beginning work, This work includes other work and costs incurred before the project starts. All equipment used by the Contractor having metal tracks shall not be driven over City streets other than those streets being constructed. Such equipment must be transported from one work area to the next work area. Observe legal load restrictions when operating equipment, hauling equipment, or hauling materials on public roads; newly constructed/reconstructed base, pavement, and structures; and any existing base, pavement or structures that will remain in place. Assume responsibility for changes in legal load restrictions that occur after the project was let. Obtain the Engineer's written approval and a special permit to exceed legal load restrictions on the City street system and on newly constructed/reconstructed portions of the project. Protect roadways and structures within project limits from damage. Observe curing periods before operating equipment or hauling loads on newly constructed pavement, reconstructed pavement, or structures. Do not haul loads of any size on pavement base, except when operations require equipment on pavement base to place material. The Contractor shall assume all responsibility for damages to roadways and structures caused by the Contractor from operating equipment or hauling loads. No direct payment will be made for Mobilization as it shall be considered subsidiary to other bid items in the contract. 1.6 INSPECTION OF WORK The Contractor shall not commence placing concrete or backfilling of pipe/structures until such time as the City Engineer or their authorized representative has made inspection. Form location, grades, slopes and subgrade shall have been approved prior to placing any concrete. 1.7 BRACING AND SHORING It shall be the contractor's responsibility to brace and shore existing structures during construction. Any additional damage to or collapse of existing structures during the contract period shall be the sole responsibility of the Contractor. The Contractor shall brace and shore all trenches in full accordance with Occupational Safety and Health Standards - Excavations; Final Rule 29 CFR Part 1926. S-3 Bracing and shoring shall not be paid for directly but shall be considered subsidiary to other bid items. No additional payment shall be considered for increased quantities of earthwork, asphalt removal and replacement, or increases in other items as a result of compliance with this specification. 1.8 TRAFFIC SAFETY When working in the traveled way, the Contractor shall provide adequate and suitable barriers, signs, warning lights, flaggers, and all other equipment necessary to direct and reroute traffic and protect the public from moving or stationary vehicles, equipment, and materials, and other obstructions. Also, adequate protective warning lights and signs shall be provided to warn of any obstruction or excavation in the street, and easement area. All barricades, signs, lights and other protective devices in public right-of-way and easements shall be installed and maintained in conformity with applicable statutory requirements, the latest edition of the "Manual on Uniform Traffic Control Devices", and the Missouri Department of Transportation (MoDOT) traffic standards. The Police Department, Fire Department, and Med-Act shall be notified prior to closing a street with the approval of the City Engineer. 1.9 NOTIFICATION OF PROPERTY OWNERS The Contractor shall provide advance notification to the adjacent property owners on all phases of the operations. 1.10 TREE AND PLANT PROTECTION All trees and other vegetation which must be removed to perform the work shall be removed and disposed of by the Contractor; however, no trees or cultured plants shall be unnecessarily removed unless their removal is indicated on the drawings. All trees and plants not removed shall be protected against injury from construction operations. The Contractor shall take extra measures to protect trees designated to be preserved, such as erecting barricades or fences around the drip line, and trimming low hanging branches to prevent damage from construction equipment. Barricade or fence shall not be removed without consent of the Engineer. When the Contractor is performing any work that may damage the tree, hand excavating or tunneling methods shall be used. Where encroachment by vehicles or equipment is expected within the drip line of the tree, the contractor will be required to place at least a 6 inches layer of organic mulch on top of the affected area to offset possible compaction. Such trees shall not be endangered by stockpiling excavated material or storing equipment within the drip line of the tree. No backfill material exceeding 4 inches in depth shall be placed within the drip line area of any tree designated to be preserved without prior consent from the Engineer. When excavation is required within the drip line of any protected tree, the contractor shall take extra measures to protect as many roots as possible. All roots to be cut or removed shall be "cut" with a chain saw, trencher, or other methods as approved by the engineer that will leave a smooth cut surface. All roots exposed during excavation shall be protected to prevent the roots from drying out by covering the exposed area with canvas or burlap, peat moss, or mulch, and kept damp until the area has been backfilled. Where shown on the plans, trees requiring root removal of one third or more of the circumference of the root system, may require the pruning of limbs on the opposite side of the root removal or thinning the entire tree equally as directed by the Engineer. All pruning, repair, and replacement of trees and plants shall be performed by qualified nurserymen or arborists. Trees requiring trimming are as noted on the plans. This work shall not be paid for directly but shall be considered subsidiary to other bid items. S-4 When the injury or removal of trees designated to be preserved cannot be avoided; each tree injured beyond repair or removed shall be replaced with a similar tree, or provide compensation to the City as determined by the Engineer. 1.11 WEEDS The Contractor shall restrict the excessive growth of weeds, grasses, and other uncultivated vegetation within the project limits. The Contractor shall cut down any excessive growth by mowing or trimming or as directed by the engineer. No direct payment will be made for this work as it shall be considered subsidiary to other bid items in the contract. 12 RESTORATION a. Pre -Restoration Meeting The Contractor shall be responsible for scheduling a pre -restoration meeting within 1 (one) week prior to beginning final grading, select soil placement, and restoration of the sodded areas in the project_ The time and location of the meeting shall be approved by the Project Engineer, with required attendance by the Contractor's superintendent and any/all subcontractors involved in the restoration. The purpose of this meeting is to discuss in detail the requirements of sod restoration in the Specifications. At this meeting the Contractor shall provide: (1) A complete schedule of operations and proposed methods for soil preparation, sod placement, and watering. (2) A list of the equipment to be used for soil preparation and compaction, fertilizer distribution, sod delivery, placement and rolling, and watering. (3) The proposed source or sources of the sod, select soil, and water. (4) A list or set of "marked up" plans indicating the proposed location of each type of sod. (5) A list of at least 3 locations that the sod crew to be used on this project has placed sod within the previous 2 weeks. 1.13 UTILITY MEETINGS AND UTILITY ADJUSTMENT It shall be the duty of the Contractor to notify the serving utility companies of pending construction operations and the schedule of same, prior to any work being done on this project. The Engineer will furnish plans to the utility companies for their records. These companies will relocate and adjust their own facilities at no cost to the Contractor, except for waterline, Evergy ducts, Fiber ducts, sanitary and storm sewers. The Contractor shall be responsible for the adjustment and protection of all sanitary and storm sewer facilities. Some minor grading and backfill work may be required of the Contractor at locations of utility adjustments. This work shall be considered subsidiary to other items of work. The Contractor shall be responsible for holding periodic utility meetings with the City, the Engineer, and utility companies during the relocation of utility lines. The frequency of meetings will initially be bi-weekly (or more frequently if necessary) and then, as relocation work begins to diminish, will be held more infrequently. The Contractor shall keep minutes of the meetings and send copies to all those in attendance. 1.14 RIGHT-OF-WAY It is anticipated that all work will be performed within existing right of way and easements. The Contractor shall confine their construction operations to the existing right-of-way limits and S-5 easements established for the project. Equipment or materials shall not be stored beyond these limits without the express approval of the owner of such property. The Engineer shall be informed as to any arrangements that Contractor makes on their behalf in these matters. 1.15 CONSTRUCTION SCHEDULE After being awarded the contract, the Contractor shall immediately prepare a Critical Path Method (CPM) schedule for approval by the City Engineer that will ensure completion of the project within the contract time. This schedule shall be submitted and approved by the City Engineer before a Notice to Proceed is issued. No work on this contract shall begin until said schedule is approved. The City reserves the right to adjust the Contractor's schedule to coordinate with any other projects in the same area. 1.16 AS -BUILT PLANS The contractor shall be responsible for maintaining a set of plans on site that contains red line markups for any approved deviations in the plans for the purpose of a record as -built set of plans. This set shall be delivered to the Engineer upon final completion of the project. 2 - SAWING 2.1 MEASUREMENT AND PAYMENT All required sawing shall be subsidiary to other bid items. 3 - TRAFFIC SIGNAL INSTALLATION (HORIZONS PKWY AND NW MUSIC BLVD) 3.1 DESCRIPTION This work shall consist of furnishing all labor, materials and equipment to complete in place the traffic signal work as shown on the Contract Drawings (including standard details), as specified in the Missouri Department of Transportation's Section 902 Traffic Signals of the Missouri Standard Specifications for Highway Construction and Missouri Standard Plans for Highway Construction, latest revisions. 3.2 MEASUREMENT AND PAYMENT The Engineer will measure the traffic signal installation as indicated on the Contract Drawings, complete -in -place and accepted, as a unit lump sum quantity for all work necessary. Payment for "Traffic Signal Installation (Horizons Parkway and NW Music Blvd)" at the contract lump sum price bid is full compensation for the specified work. 4 - REMOVING EXISTING SIGNS 4.1 DESCRIPTION Existing sign removal shall consist of the complete removal of highway signs, sign posts, and foundations as shown on the Contract Drawings. Salvage existing signs and return to the City Engineer. 4.2 METHOD OF MEASUREMENT The Engineer will measure the removal of existing signs by the lump sum. S-6 Payment for "Removing Existing Signs" at the contract lump sum price bid is full compensation for the specified work. 5 - TEMPORARY TRAFFIC CONTROL 5.1 DESCRIPTION Temporary Traffic Control shall conform to Part VI of the Manual on Uniform Traffic Control Devices (MUTCD). Construction operations shall be coordinated to result in the least practicable delay to traffic. 5.2 METHOD OF MEASUREMENT The Engineer will measure traffic control by the lump sum, including all signs, barricades, warning lights, flaggers, temporary pavement markings and all other equipment necessary to safely direct and control traffic. Payment for "Temporary Traffic Control' at the contract lump sum price bid is full compensation for the specified work. 6 - CONTRACTOR CONSTRUCTION STAKING 6.1 DESCRIPTION The Contractor shall set construction stakes establishing all lines, slopes, continuous profile -grades, centerlines, and benchmarks necessary to control and perform the work. 6.2 MEASUREMENT AND PAYMENT The Engineer will measure contractor construction staking by the lump sum. Payment for "Contractor Construction Staking" at the contract lump sum price bid is full compensation for the specified work, which shall include all staking, establishing vertical and horizontal control points and property corner resetting. S-7