Loading...
HomeMy WebLinkAbout2023-12-14 Planning & Zoning Commission Packet MINUTES REGULAR MEETING PLANNING AND ZONING COMMISSION RIVERSIDE, MISSOURI Thursday October 26, 2023 6:30 p.m. The Planning and Zoning Commission for the City of Riverside, Missouri, met in regular session at Riverside City Hall, 2950 NW Vivion Road, Riverside, Missouri. The meeting was called to order at 6:30 p.m. Answering roll call were Matt Christopher, Mike Soler, Al Bowman, Frank Biondo and Ray Uhl. City Planner Sarah Wagner was also present. Members absent were Gale Perkins, Mike Lombardo, Richard Lanning and Mayor Kathy Rose. Approval of Minutes of June 22, 2023. Commissioner Biondo moved to approve the minutes of June 22, 2023, seconded by Commissioner Bowman. Motion passed 5-0. Appointing Chair City Planner Sarah Wagner let the Commission know that Stephen King has resigned from the Planning Commission due to health reasons. With his resignation we need to appoint a new Planning Commission Chair. Mike Lombardo has stated that he is still interested in serving as vice- chair. Al Bowman nominated Frank Biondo for Planning Commission Chair, second by Mike Soler. Motion passed 4-0, with Frank Biondo abstaining. Replat- 40 West City Planner Sarah Wagner gave the staff report. She noted that the Planning Commission originally approved the final plat for the small lot subdivision now called 40 West in 2021. At the time staff tried to divided up the lots evenly in size. Since approval staff has worked with several potential buyers and they all have unique size needs. This replat allows for the adjustment of lot lines to “right size” lots to individual businesses. Commissioner Biondo moved to recommend approval for the replat of 40 West to the Board of Alderman; seconded by Commissioner Uhl. Motion passed 5-0. Adjourn Commissioner Soler moved to adjourn at 6:39 p.m. Commissioner Biondo seconded and the meeting was adjourned 5-0. __________________________ Sarah Wagner City Planner Page 1 of 2 City of Riverside Staff Analysis Report Case Number PC23-13, Preliminary/Final Development Plan & Rezoning for property located south of NW 39th Street, west of NW Horizons Parkway, north of Interstate 635, and east of the Riverside Quindaro Bend Levee. General Information Applicant: LiveNation Worldwide, Inc. Location: South of NW 39th Street, west of NW Horizons Parkway, north of Interstate 635, and east of the Riverside Quindaro Bend Levee. Application: Rezoning and a Preliminary/Final Development Plan Existing Zoning: PD- Planned Development Proposed Zoning: PD- Planned Development Existing Land Use: Vacant Proposed Land Use: Amphitheater/Entertainment District Preliminary/Final Development Plan and Rezoning: Preliminary/Final Development Plan and Rezoning will be reviewed by the Planning Commission and the Board of Aldermen for approval. Site Area: 161.03acres Overview: The applicant is requesting approval of a rezoning from the Current PD- Zoning to a revised PD-Zoning for an amphitheater and related operations. The applicant is also requesting approval of a preliminary/final development plan for the same. Rezoning: The applicant is proposing to rezone the above-described property from for the current PD- Planned development standards adopted in August 2016 for an industrial development to the proposed plan for an amphitheater and related operations. Preliminary/Final Development Plan Site Layout: The applicant is proposing an approximately 15,000-seat open-air amphitheater. In addition to the amphitheater itself the development will include 15 ancillary buildings to serve its operations. This includes restrooms, food vendors, VIP areas, box office and more. General access to the site will come from NW Horizons Parkway at NW 39th Street and head south. VIP guests, ride share, and deliveries will be able to access the site from NW Helena Rd or NW Mattox Rd. Access to the site will be gated when not in operation. Parking: The plan proposes 30 paved employee parking spaces to the southwest of the property. Adjacent to that are 375 VIP and ADA parking spaces. The applicant is proposing 545 paved VIP parking spaces to the northwest of the property. Adjacent to that will be 206 rideshare queue parking spaces. General admission parking is located on the east side of the site with approximately 4,252 parking spaces. The applicant is proposing a recycled crushed Page 2 of 2 concrete for this parking surface. Staff is not familiar with this type of parking surface and will be working with the applicant to reach an agreement on an acceptable general admission parking surface. Infrastructure: New infrastructure is being brought to the site. Sanitary sewer as well as domestic water exists to the north along NW 39th Street. Electricity and gas will be extended from NW Horizons Parkway. Stormwater: Stormwater will be detained on the property with a detention basin and swales located in the northeast corner. Stormwater will drain from that area through a series of pipes and swales into the regional stormwater system and eventually drain through the levee into the Missouri River. Building Design: The amphitheater and ancillary buildings will consist of a mixture of building materials that include concrete, brick, metal, and glass. Landscaping: The applicant has provided an extensive landscaping plan that includes 455 shade trees, 72 street trees, and 119 parking lot trees. Additional shrubs and landscaping will be in the entry plaza. Signage: The applicant is not proposing any signage currently. Staff is anticipating larger scale signage consistent with other entertainment venues. Staff will work with the applicant on approving a master sign plan. Comprehensive Master Plan: Throughout the development of the Comprehensive Master Plan it was articulated by participants that improving community image/character and the quality and design of buildings and development were key concerns. It also indicated the desire to diversify the City’s profile and attract different opportunities for the community. This development addresses several of these concerns by taking an underutilized property and creating new development. Recommendation Staff finds the applications in conformance with the standards set forth in the UDO and the goals established in the Comprehensive Master Plan and therefore recommends approval of the applications with the following conditions: • The applicant will work with staff to agree upon and acceptable parking surface for general admission parking. • The applicant will work with staff to provide a master sign plan for the development. Attachments • Final Development Plan: Site Plan • Location Map • Elevations • Landscaping Page 1 of 2 City of Riverside Staff Analysis Report Case Number PC23-14, Preliminary/Final Development Plan & Rezoning for property located south of Missouri Highway 9, north of the BNSF Railroad, east of 5654 River Park Drive, and west of NW Horizons Parkway. General Information Applicant: Gunter Development Location: The south of Missouri Highway 9, north of the BNSF railroad tracks, west of NW Horizons Parkway and east of 5654 NW River Park Drive. Application: Rezoning and a Preliminary/Final Development Plan Existing Zoning: GP-I General Planned Industrial Proposed Zoning: PD- Planned Development Existing Land Use: Vacant Proposed Land Use: Industrial/Wearhouse Preliminary/Final Development Plan and Rezoning: Preliminary/Final Development Plan and Rezoning will be reviewed by the Planning Commission and the Board of Aldermen for approval. Site Area: 14.02 acres Building 1: 118,362 SF Building 2 (Future Phase): 31,720 SF Building 3 (Future Phase): 12,600 SF Overview: The applicant is requesting approval of a rezoning from GP-I General Planned Industrial to PD Planned Development and a preliminary/final development plan for a new small industrial/warehouse development. Rezoning: The applicant is proposing to rezone the above-described property from GP-I General Planned Industrial, which is a holding district, to PD Planned Development. This proposed zoning will have the same regulations as the rest of the PD zoning districts in the Horizons Development. Those regulations can be found in Attachment A. Preliminary/Final Development Plan Site Layout: The proposed site has been vacant for several years. The applicant is proposing a multi-building small scale industrial development. They are proposing to build the first building Page 2 of 2 which is approximately 118,362 square feet within the next few months with subsequent buildings coming in future phases. Parking: The plan proposes 192 standard parking stalls, which exceeds the 119 required by code. Infrastructure: No new infrastructure us needed for this development. Existing utilities are available to the site. The site has access in the form of a right in/ right out onto Missouri Highway 9. Stormwater: Stormwater will exit the property to the east and will enter the City’s regional stormwater system for the Horizons Development. Building Design: The building will be constructed of precast concrete with glass windows on the north and west elevations. Dock doors will face the south and east and be screened by the building and neighboring buildings from public view. Landscaping: The applicant has proposed a mixture of street trees and shrubs for the property. Street trees are proposed along NW Horizons Parkway and shrubs will be planted along the building’s north facade. Additional street trees will be required along Missouri Highway 9. Signage: The applicant is not proposing any signage at this time. Future signage will require a sign permit and approval by staff. Comprehensive Master Plan: Throughout the development of the Comprehensive Master Plan it was articulated by participants that improving community image/character and the quality and design of buildings and development were key concerns. This development addresses several of these concerns by taking an underutilized property and creating new development. Recommendation Staff finds the applications in conformance with the standards set forth in the UDO and the goals established in the Comprehensive Master Plan and therefore recommends approval of the applications with the following conditions: • Developer will work with staff on landscaping. • Developer will work with staff regarding grading. Attachments • Final Development Plan: Site Plan • Location Map • Elevations 1 Horizons “PD” Regulations (Adopted August 2016) A. Building Lines. There shall be no minimum front and rear setback requirements for the Planned Development. Building separation shall be a minimum of twenty (20) feet and separation of buildings will be required to meet minimum separation standards governed by the adopted building code of the City. Building setbacks shall be set by final development plan and where applicable final plat. B. Building Materials and Construction. All buildings and other structures within Horizons Business Park shall be constructed of attractive exterior sides of high quality materials including masonry, concrete, glass, and metal (when used in an incidental role). Specific materials which will be excluded include exposed (i) galvanized metal facades, (ii) nondecorative cinder or concrete block, and (iii) double T concrete panels. Exterior mechanical or electrical equipment, including, but not limited to, HVAC equipment shall be so placed or screened that the predominant design lines of the building or structure continue without visual distraction or interruption. If the function of the building or structure dictates placement of such equipment in such a manner or location that the building exterior walls themselves are unable to screen the equipment from view of adjacent existing or proposed streets or highways, they must be separately screened using materials compatible with the approved building materials with use of an appropriately designed parapet wall and the height of such screening shall be equal to the height of the equipment to be screened; or with acceptable landscaping. Accessory buildings, enclosures, appurtenant structures to, or extrusions from, any building or structure shall be of similar or compatible materials, design and construction. C. Building Material Colors. Color of materials used on the construction of all buildings, enclosures, and appurtenant structures shall be consistent throughout the entire development and will present a predominantly warm earth tone appearance. Exact color palette and materials will be approved by final development plan. D. Parking. Adequate off-street parking for employees, customers, owners and tenants shall be the responsibility of the property owners. All necessary parking facilities shall be provided for entirely on private property. Parking ratios will be provided in the development plan and will be reviewed and approved by the City. Parking on private or public streets or highways within the subject property is expressly prohibited. All parking areas and drives and access shall be paved with an impervious surface equal to asphalt or concrete and maintained in a well-kept condition. Each parking space provided shall be designated by lines painted on the paved surfaces and shall be adequate in area, generally spaces will be sized nine feet wide by eighteen feet long (9’ x 18’) when a curb abuts and nine feet wide by twenty feet long (9’ by 20’) when not abutting a curb. For the office portion of the Planned Development, it shall be the general standard that no parking spaces, parking aisles or roadways, except the access way, shall be permitted within the front ten (10) feet of the front setback. If parking spaces are provided in front of the building a landscape buffer shall be provided as described in the landscaping section of this regulation. Businesses experiencing rapid growth may submit a request to the Director of Community 2 Development to allow temporary gravel overflow parking. Parking may be allowed in accordance with the following standards: 1. A site plan identifying the parking area, parking lot size and specifications for base and gravel must be submitted for review prior to the parking being installed. 2. The parking area shall not impede public safety. 3. The maximum timeframe for the temporary gravel overflow parking is 18 months. At the end of the timeframe, the area must either accommodate a building/building expansion, become green space or be paved per City approvals and regulations. 4. An agreement outlining the specifications for the temporary gravel overflow parking shall be signed by the appropriate business representative and the Director of Community Development. E. Off-Street Loading. Provision for handling all truck service must be totally within the building site. Docks and loading areas facing non-industrial uses within the development shall be screened in accordance with the landscape provisions described in the PD regulations. All loading shall be paved with an impervious surface equal to asphalt or concrete. All side and rear loading service areas shall be properly screened from view from all existing or proposed streets, roads, or highways by walls, earth berms, and/or plant material. F. Outdoor Storage. Although the outdoor storage of materials and equipment is not preferred, the City recognizes it is an important component for some industrial businesses. Considering this, the outdoor storage of materials and equipment may be permitted in accordance with the following regulations. These regulations do not apply to the customary trailer parking activities associated with industrial businesses. 1. Outdoor storage is only permitted within the industrial portion of the Planned Development. 2. Because outdoor storage is not preferred, minimizing the visible impact of outdoor storage on public rights-of-way and less intense uses is critical. Thus, outdoor storage shall only be permitted in areas that are not visible from Horizons Parkway and the office portion of the Planned Development. 3. All outdoor storage must be located in a side or rear yard such that views from public rights-of-way and less intense uses are limited. 4. The maximum outside storage area shall be based on the business’s inside space. 10,000 square feet of first floor indoor space = 1,000 square feet of outside storage area. 5. Storage areas shall be located adjacent to the building and shall not extend more than 5 feet less than the length of the screening mechanism (i.e. – if the wing wall extends 80 feet from the building, the storage area shall not extend beyond 75 feet). This requirement may be waived if the storage area is behind a building and is not visible from any public rights-of-way and less intense uses. 6. The maximum height of stored items shall not exceed 20 feet. 7. Storage areas shall not impede vehicular traffic and emergency access points. 8. All materials being stored must be associated with the business that is located in the building adjacent to the storage area 9. Storage areas shall be maintained in a neat and orderly manner. 3 10. If outdoor storage is desired that cannot meet these criteria, a special use permit may be requested. When reviewing the request the following shall be taken into consideration. o Distance from Horizons Parkway, I-635 and Highway 9 - the farther away the more likely it is the request will be approved. o Visibility – the lower the visibility the more likely it is the request will be approved. o East or West – the industrial area west of Horizons Parkway within the Planned Developed is intended for more intense uses, thus outdoor storage west of Horizons Parkway is more likely to be approved. G. Waste Receptacles and Enclosures / Waste Removal. Waste receptacles in the industrial portion of the Planned Development shall be located behind or on the sides of buildings such that they are not readily visible from public rights-of-way. For the office portion of the Planned Development, facilities for storage of waste and rubbish shall be property screened within an approved trash enclosure. Each owner and tenant shall keep its premises, buildings and improvements and appurtenances in a safe, sightly, clean, neat and wholesome condition, and shall comply in all respects with all governmental, health and police requirements. Each owner and tenant shall remove, at its own expense, any rubbish or trash of any character which may accumulate on its property and shall keep unlandscaped and landscaped areas neat and well-maintained. Rubbish and trash shall not be disposed of on the premises by burning in open fires or incinerators. All rubbish and trash containers shall be properly screened by an appropriate enclosure. H. Permanent Park Signage. No sign shall be erected, placed or otherwise installed upon a Building Site or affixed to a Building, structure, or other improvement erected on a Building Site until the plans for such sign have been approved by the City. Flashing or moving signs are prohibited. Product or service replicas or models are prohibited, unless allowed per the Unified Development Ordinance. The location, size, design and color of all signs must be in keeping with the character of the Park. l. Park Monument Signs. Park Monument Signs shall be utilized to identify the development as whole and not individual businesses and shall only be permitted to the Master Developer of the Planned Development. Three Park Monument Signs shall be permitted, each with a maximum sign face of two-hundred fifty (250) sq. ft. Park Monument Signs are allowable in the public right-of-way. 2. Park Entry Signs. Park Entry Signs shall be utilized to identify main entrances of the development and not individual businesses and shall be permitted to the Master Developer of the Planned Development. Three Park Entry Signs shall be permitted, each with a maximum sign face of thirty-six (36) sq.ft. Park Entry signs are allowable in the public right-of- way. 3. Park Directional Signs. Park Directional Signs shall be utilized to identify buildings address, name of business, and in appropriate cases logos of the company occupying. 4 Each building shall be permitted to have a Park Directional Sign, each with a maximum sign face of twenty (20) sq.ft. 4. Building Facade Signs. Building Façade Signs shall be attached to the building to identify individual businesses and shall be approved as a component of the Final Development Plan. Industrial Buildings – For those lots that do not abut Horizons Parkway, each individual tenant may have a maximum of two (2) walls signs per building, with a maximum of one (1) sign per side of building. The maximum sign face per sign shall be one-hundred twenty (120) square feet, except for a building with a single tenant, the maximum sign face per sign shall be one- hundred fifty (150) square feet. For those lots abutting Horizons Parkway each individual tenant may have a maximum of three (3) wall signs, with a maximum of one (1) sign per side of building. The maximum sign face per sign shall be one-hundred twenty (120) square feet, except for a building with a single tenant, the maximum sign face per sign shall be one-hundred fifty (150) square feet. For signs with one line of copy, the maximum letter height shall be sixty (60) inches per letter. For signs with two lines of copy, the maximum letter height shall be forty-eight (48) inches per letter. Office Buildings - Each building may have a maximum of two (2) building façade signs. The total maximum sign face per building shall be eighty (80) square feet, with no sign being larger than fifty (50) square feet. For signs with one line of copy, the maximum letter height shall be sixty (60) inches per letter. For signs with two lines of copy, the maximum letter height shall be forty-eight (48) inches per letter. 5. For Sale or Lease Signs. A temporary wood, metal, or plastic sign may be erected on a developed building site to offer the property for sale or lease. One (l) such sign, having a maximum area of thirty (30) square feet for buildings less than 50,000 square feet, thirty-five (35) square feet for buildings more than 50,000 square feet but less than 150,000 square feet, and sixty (60) square feet for buildings more than 150,000 square feet. 6. Temporary Signs. Paper signs, stickers, transfers, signs printed or affixed to, or visible through the windows, doors or exterior walls of a building or other signs of a temporary character or purpose, regardless of the composition of the sign or the materials used therefore, are expressly prohibited. 7. Construction Signs. A temporary wood, metal, or plastic sign will be allowed during the construction of a building project. Such signs may be either single or double faced with each face having a maximum area of fifty square feet for building sites, less than three (3) acres and eighty square feet for building sites of three (3) acres or more. All signs permitted under this provision will be removed immediately upon issuance of an occupancy permit for any building constructed on the site. I. Landscaping. All open areas on any building site not occupied by buildings, storage, parking, access roads and loading shall be suitably graded with a slope not to exceed 3:1 to allow for mowing, 5 and drainage and shall be maintained in lawn, trees, and/or shrubs, including lawn irrigation in all such areas. It is the intent of these regulations to provide a park-like setting for the buildings, as well as to screen objectionable areas. Office Park: Building sites shall be landscaped in accordance with the general landscaping plan for the Park. All lots are required to provide a minimum landscape buffer of ten feet (10’) along public right-of-way, utilizing deciduous shade and ornamental trees, evergreen trees and shrubs. Building Site (Pervious Area): Building site shall include a minimum of one (l) two and one-half (2-½) inch caliper deciduous or evergreen tree (8’ in height) for each two thousand five hundred (2,500) square feet of pervious / green space area, to be planted in side yard, front yard or rear of building at common area. Substitutions are allowed for Pervious area calculation only based upon the following: 1 Shade Tree (2-1/2” cal.) or Evergreen Tree (8’ ht) = 20 shrubs 3’ in height or 2 ornamental trees 6’ in height Building Frontage at Street: 1 Shade Tree (2-1/2” cal.) or Evergreen Tree (8’ ht) for every 40 feet of street frontage to be planted along the street right-of- way. Common Area side or Building Rear: 1 Shade Tree (2-1/2” cal.) or Evergreen Tree (8’ ht) for every 40 feet of frontage on common area such as, lakes and canals. Parking Lots: Landscaped islands should be added at the ends of all parking rows and should be bermed and planted with either sod or landscaping. • 1 Shade Tree (2-1/2” cal.) or Evergreen Tree (8’ ht) for every 200 square foot of parking lot islands. • Fifty percent (50%) of the parking lot should be screened from view with shrubs 3’ in height. Building Foundation: Forty percent 40% of the building foundation should be landscape with ground covers, shrubs and ornamental trees. Industrial Park: Building sites shall be landscaped in accordance with the general landscaping for the Park: Building Frontage at Street: 1 Shade Tree (2-1/2” cal.) or Evergreen Tree (8’ ht) for every 40 feet of street frontage to be planted along the street right-of- way. Common Area side or Building Rear: 1 Shade Tree (2-1/2” cal.) or Evergreen Tree (8’ ht) for every 50 feet of frontage on common area such as, lakes and canals. Parking Lots: Landscaped islands should be added at the ends of all parking rows and should be bermed and planted with either sod or landscaping. • 1 Shade Tree (2-1/2” cal.) or Evergreen Tree (8’ ht) for every 200 square foot of parking lot islands. 6 • Parking lot screening is encouraged where green space exists. Screening should be shrubs 3’ in height not exceed 20% of the total frontage. Building Foundation: Building foundations should be landscaped at building entries and sides with groundcovers, shrubs and ornamental trees. The landscape development, having been installed, shall be maintained by Owner in a neat and adequate manner, which shall include the mowing of lawns, trimming of hedges, other such maintenance and watering including the installation of lawn irrigation on all sites. The landscaping shall be implemented and completed within six (6) months after certificate of occupancy of the building has been issued. J. Exterior Lighting. Lighting of buildings and public areas, such as parking, plazas, landscaping, fountains, sculptures, and walkways is required. All site lighting will be accomplished by using concealed source fixtures with a minimum average illumination in accordance with the requirements of the City of Riverside, Missouri. All exterior lighting will be metal halide or white in color and constant in nature, specifically excluding traveling, flashing or intermittent illumination of any kind and must be so arranged or shielded as to avoid glare or reflection onto any adjacent existing or proposed streets, highways, ponds or building sites. Pole mounted fixtures will have a maximum pole height of thirty-two (32) feet, including the base. K. Underground Utilities, Pipes, Etc. No pipe, conduit, cable, line or the like for water, gas, sewage, drainage, steam, electricity, or any other energy or service shall be installed or maintained upon any building site (outside of any building) above the surface of the ground. L. Fencing. All fencing on any building site shall be compatible with the building materials used in the construction of the major structure on said building site. Chain link fencing shall be finished with a black powder coat in the Planned Development. M. Animals. No livestock, poultry or other animals shall be kept on any part of the Park