HomeMy WebLinkAbout2018-05-10 Planning & Zoning Commission Packet
1
MINUTES
REGULAR MEETING
PLANNING AND ZONING COMMISSION
RIVERSIDE, MISSOURI
Thursday, January 25, 2017
6:30 p.m.
The Planning and Zoning Commission for the City of Riverside, Missouri, met in regular session at
Riverside City Hall, 2950 NW Vivion Road, Riverside, Missouri.
The meeting was called to order at 6:30 p.m. Answering roll call were Ray Uhl, Harold Snoderley,
Stephen King, Al Bowman, Mike Soler and Mike Lombardo. City Planner Sarah Wagner, Fire Marshall
Keith Payne, and Community Development Assistant Rhonda Smith. Members absent were Steven
Kaspar, Nathan Cretsinger, Jim Frakes, and Mayor Kathy Rose.
Approval of Minutes of
October 12, 2017.
Commissioner Snoderley moved to approve the minutes of October 12,
2018, seconded by Commissioner Uhl. Motion passed 5-0 with
Commissioner Bowman abstaining.
Public Hearing – Chapter
400 Unified Development
Ordinance Amendment
Chair Stephen King opened the public hearing at 6:31 pm.
City Planner Sarah Wagner gave a brief report noting that AT&T had
approached the city to place small cell towers within city limits. The
City Attorney Paul Campo has made changes to the Unified
Development Ordinance so the City can control the aesthetics and
locations of the small cell towers.
Commission Soler wanted to know if cell service functionality would be
better. Wagner noted that the small cell towers would be placed within
the city to improve service.
Commissioner Uhl wanted to know the height of the towers. Wagner
noted that they could be up to 30 feet tall but the expectation is that they
will be placed on existing structure such as light poles.
Chair Stephen King closed the public hearing at 6:43 pm.
Commissioner Snoderley made a motion to approve changes to Chapter
14 of the Unified Development Ordinance and refer the changes to the
Board of Aldermen; seconded by Commissioner Lombardo.
Motion passed 6-0.
Ajourn
Commissioner Uhl moved to adjourn at 6:47 p.m.
Commissioner Snoderley seconded and the meeting was adjourned 6-0.
2
____________________
Rhonda Smith
Community Development
NW
H
o
r
i
z
o
n
s
P
a
r
k
w
a
y
NW 41st Street
NW
M
a
t
t
o
x
R
o
a
d
NW
H
e
l
e
n
a
R
o
a
d
Riverside Logistics Martinrea
Adient (JCI)
Premium Waters
Yenfeng
4055 NWMattox RoadHorizonsSpec VII
4120 NW Mattox RoadHorizons Spec IX
.
Planning CommissionCases PC18-02 & PC18-03Final Development Plan Horizons Spec VIII & IX
Page 1 of 2
City of Riverside
Staff Analysis Report
Case Number PC18-02, Final Development Plan
4055 NW Mattox – Horizons Industrial Spec VIII
General Information
Applicant: NorthPoint Development, Horizons Industrial VIII, LLC
Location: 4055 NW Mattox Road
Application: Final Development Plan
Zoning: PD- Planned Development
Existing Land Use: Undeveloped
Proposed Land Use: Light Industrial
Final Development Plan: Final Development Plan will be reviewed by the Planning
Commission and the Board of Aldermen for approval.
Site Area: 344,559 sq.ft. (7.9 acres)
Building Size: 134,009 sq. ft.
Building to Area Ratio: Approximately 39%
Analysis
Site Layout: The proposed site is undeveloped. The property is bound on the north by 41st
Street. Martinrea is located to the east and Riverside Logistics to the west. The south side of
the property is undeveloped land owned by the City. The property has three access points. Two
access point from NW Mattox Road and one from NW 41st Street.
The building will run north-south with the main entrances being located on the west side of the
building on NW Mattox Road. Standard car parking is provided to the north and west of the
building with a few spaces on the south as well. Truck parking and loading/unloading areas and
docks will be located on the east side of the building facing the back side of Martinrea.
Parking: The plan proposes 193 parking spaces designated for customers and employees on the
north, south and west sides of the building. This is more than the 1 per 1,000 sq.ft.required by
code. There are 26 truck/trailer parking spaces to the north of the building.
Infrastructure:
Sanitary Sewer: Sanitary sewer is e located along the north side of the property.
Water: Water is available along the north side of 41st Street.
Gas: Gas is available along the north side of 41st Street.
Electric: Underground electric is located along the north side of 41st Street
Telecommunication: Telecommunication/fiber optics is available on the north side of NW 41st
Street.
Page 2 of 2
Stormwater: Stormwater from this site will be conveyed by swales along the south and east
sides of property to the regional dentition basin located south of Riverside Logistics.
Building Design: The building will be constructed of insulated precast concrete wall panels.
The applicant will be applying for Leadership in Energy and Environmental Design (LEED)
Certification. The building matches the theme throughout Horizons East and will be carried to
this building on the west side of Horizons Parkway. The building will include elements of glass
similar to other industrial buildings in this park. These glass elements will be on the north,
south and west sides of the building to increase natural light into the office areas. The
warehouse portion of the building will also include glass for clear story windows to allow
natural daylighting in warehouse operations.
Outdoor Storage: Horizons Spec VIII does not have any current outdoor storage needs. The
building is designed to be an industrial type use so the parking of truck trailers is anticipated.
The truck trailer parking will be on the east of the building facing the back of another industrial
building.
Landscaping: The approved PD regulations for all property east of Horizons Parkway address
landscaping for industrial sites. The four components of landscaping required includes:
building frontage at the street (right-of-way), common areas (not applicable to this site), parking
lots, and building foundation. The applicant has provided parking lot and foundation plantings
exceeding the adopted PD standards which require 1 tree per 40 feet and the applicant is
providing 1 tree per 30 feet of space. These plantings consist of trees located within the interior
yards and parking islands and shrubs at the building entrances
Signage: Site signage is regulated by the adopted PD regulations for the Riverside Horizons
Development. At this time the applicant has not submitted any sign plans.
Comprehensive Master Plan: Throughout the development of the Comprehensive Master Plan
it was articulated by participants that improving community image/character and the quality and
design of buildings was a key concern. Additionally, the Comprehensive Master Plan identifies
the site as part of the ‘Horizons Development’, which is ultimately envisioned to include a mix
of innovation and industry, mixed use, destination office, destination retail and recreation.
Recommendation
Staff finds the application in conformance with the standards set forth in the UDO and the goals
established in the Comprehensive Master Plan and therefore recommends approval of the
application with the condition that additional landscaping is added to the south side of the
building for screening.
Attachments
Final Development Plan: Site Plan
Landscaping Plan
Location Map
Page 1 of 2
City of Riverside
Staff Analysis Report
Case Number PC18-03, Final Development Plan
4120 NW Mattox – Horizons Industrial Spec IX
General Information
Applicant: NorthPoint Development, Horizons Industrial IX, LLC
Location: 4120 NW Mattox Road
Application: Final Development Plan
Zoning: PD- Planned Development
Existing Land Use: Undeveloped
Proposed Land Use: Light Industrial
Final Development Plan: Final Development Plan will be reviewed by the Planning
Commission and the Board of Aldermen for approval.
Site Area: 807,730 sq.ft. (13.95 acres)
Building Size: 213,016 sq. ft.
Building to Area Ratio: Approximately 26%
Analysis
Site Layout: The proposed site is undeveloped. The property is bound on the north by 43rd
Street, to the east by NW Mattox Road, the south by 41st Street and the west by NW Helena
Road. The property has four access points. Two access points are from NW 41st Street and there
is one access from NW Helena and NW Mattox Road.
The building will run east-west with the main entrances being located on the south side of the
building on NW 41st Street. Standard car parking is provided to south and truck parking will be
double stacked on the north side of the property along 43rd Street.
Parking: The plan proposes 147 parking spaces designated for customers and employees on the
south side of the building. There are 92 truck/trailer parking spaces to the north of the building
double stacked.
Infrastructure:
Sanitary Sewer: Sanitary sewer is e located along the north side of the property.
Water: Water is available along the north side of 41st Street.
Gas: Gas is available along the north side of 41st Street.
Electric: Underground electric is located along the north side of 41st Street
Telecommunication: Telecommunication/fiber optics is available on the north side of NW 41st
Street.
Page 2 of 2
Stormwater: Stormwater from this site will be conveyed by swales along the north, east and
south sides of property to the regional dentition basin located south of Riverside Logistics.
Building Design: The building will be constructed of insulated precast concrete wall panels.
The applicant will be applying for Leadership in Energy and Environmental Design (LEED)
Certification. The building matches the theme throughout Horizons East and will be carried to
this building on the west side of Horizons Parkway. The building will include elements of glass
similar to other industrial buildings in this park. These glass elements will be on the north,
south and west sides of the building to increase natural light into the office areas. The
warehouse portion of the building will also include glass for clear story windows to allow
natural daylighting in warehouse operations.
Outdoor Storage: Horizons Spec IX does not have any current outdoor storage needs. The
building is designed to be an industrial type use so the parking of truck trailers is anticipated.
The truck trailer parking will be on the east of the building facing the back of another industrial
building.
Landscaping: The approved PD regulations for all property east of Horizons Parkway address
landscaping for industrial sites. The four components of landscaping required includes:
building frontage at the street (right-of-way), common areas (not applicable to this site), parking
lots, and building foundation. The applicant has provided parking lot and foundation plantings
exceeding the adopted PD standards which require 1 tree per 40 feet and the applicant is
providing 1 tree per 30 feet of space. These plantings consist of trees located within the interior
yards and parking islands and shrubs at the building entrances
Signage: Site signage is regulated by the adopted PD regulations for the Riverside Horizons
Development. At this time the applicant has not submitted any sign plans.
Comprehensive Master Plan: Throughout the development of the Comprehensive Master Plan
it was articulated by participants that improving community image/character and the quality and
design of buildings was a key concern. Additionally, the Comprehensive Master Plan identifies
the site as part of the ‘Horizons Development’, which is ultimately envisioned to include a mix
of innovation and industry, mixed use, destination office, destination retail and recreation.
Recommendation
Staff finds the application in conformance with the standards set forth in the UDO and the goals
established in the Comprehensive Master Plan and therefore recommends approval of the
application with the condition that additional landscaping is added to the south side of the
building for screening.
Attachments
Final Development Plan: Site Plan
Landscaping Plan
Location Map