HomeMy WebLinkAboutR-2026-025 Authorizing Street Light Modifications on Amphitheater Way and Authorizing Street Light Changes with EvergyRESOLUTION NO. R-2026-025
A RESOLUTION AUTHORIZING STREET LIGHT MODIFICATIONS ON
AMPHITHEATER WAY AND APPROVING AN AUTHORIZATION FOR STREET LIGHT
CHANGES WITH EVERGY
BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE,
MISSOURI, AS FOLLOWS:
THAT the street light additions and modifications described in the attached
"Authorization for Street Light Changes" dated February 2, 2026, including the installation
of lighting and related components along Amphitheater Way and the associated monthly
charges, are hereby approved; and
FURTHER THAT the Mayor, City Administrator, City Clerk, and other appropriate City
officials are hereby authorized and directed to execute the Authorization for Street Light
Changes on behalf of the City and to take such further actions as may be reasonably
necessary to carry out the intent of this Resolution, including coordination with Evergy for
installation and billing.
PASSED AND ADOPTED by the Board of Aldermen of the City of Riverside, Missouri,
the 17th day of February 2026.
/s/ Kathleen L. Rose
Kathleen L. Rose, Mayor
ATTEST:
/s/ Melissa McChesney
Melissa McChesney, City Clerk
evergy
AUTHORIZATION FOR STREET LIGHT CHANGES
City of Riverside
At the request of Riverside, Missouri on February 2, 2026, the following changes were authorized in our street lighting system
by resolution of the City of Riverside. Streetlights will be installed, in accordance with the schedule of charges listed below or
any effective superseding rate schedules on file with the governmental regulatory agency having jurisdiction over rates and
charges for service hereunder.
Add or Remove | No. Lights | Watts/Lumens | MRU Code Number | Location | Pole# | MONTHLY COST
ADD 36 12,500 LED-3TYPE3 LODS AMPHlTHEATER WAY 36 36 @ $24.63 = 886.68
ADD 36 STEEL OSPL AMPHITHEATER WAY 36 36@$1.54 = $55.44 UPGRADE
ADD 32 UGDIRT OEUS AMPHITHEATER WAY 32 32 @$6.51 = $208.32
ADD 4 UG OEUC AMPHITHEATER WAY 4 4 @ $24.82 = $99.28 PAVEMENT
ADD 36 BREAKAWAY OBAB AMPHITHEATER WAY 36 36 @$3.55 = $127.80 BASE
TOTAL $1377.52
TYPE ABBREVIATIONS
AP -Additional Pole
EDP -Existing Distribution Pole City Cl
EG -Enclosed Glassware
LED -Light-emitting Diode
L -Lumens FOR EVERGY USE ONLY
MV -Mercury vapor
MVS -Mercury Vapor Streamlined Date of Change
OG -Open Glass
OH -Overhead Wiring
Change Made By
SP -Steel Pole Mounting Work Request # M108974960
SVL -Sodium Vapor Lucalox
svu -Sodium Vapor Unalux Subdivision Morton Salt Am phitheater
svus -Sodium Vapor Unalux Streamlined Blanket WO#
TS -Traffic Signal (Location)
UG -Underground Wiring
WP -Wood Pole Mounting
Signed /s/ Melissa McChesney 2/17/26
City Clerk
FOR EVERGY USE ONLY
Date of Change
Change Made By
Work Request #M108974960
Subdivision Morton Salt Amphitheater
Blanket WO#
Signed
CCB Updated By
.ev 2/13/23 Internal Use Only