Loading...
HomeMy WebLinkAbout2008-128 - Agreement with Continental Consulting Engineers for Engineering Services. -~ BILL NO. 2008-128 ORDINANCE N0.2008-128 AN ORDINANCE AUTHORIZING THE MAYiOR TO EXECUTE AN AGREEMENT FOR ENGINEERING SERVICES WITH CONTINENTAL CONSULTING ENGINEERS, INC. FOR THE HORIZONS LIFT STATION AND SANITARY SEWER PROJECT WHEREAS, the City of Riverside, Missouri ("City") has engaged in negotiations with Continental Consulting Engineers, Inc. ("Continental") for provision of shop drawing review and construction coordination services related to the Horizons Lift Station and Sanitary Sewer project under consideration by the City (the "Services"). WHEREAS, the City and Continental have reached an agreement concerning the provision of and payment for such Services. NOW, THEREFORE, be it ordained by the Board of Aldermen of the City of Riverside, Missouri, as follows: Section 1. This Ordinance is intended and is hereby determined and declared to be necessary to accomplish and serve the public purpose of constructing the Horizons Lift Station and Sanitary Sewer project. Section 2. The City of Riverside shall enter into an agreement whereby Continental shall provide the Services to the City at a total cost of $66,972.00 (the "Agreement"). Section 3. The execution and delivery of the Agreement, in substantially the form attached hereto as Exhibit A, is approved, and the Mayor is authorized to execute the Agreement and to take such other actions reasonably necessary to carry out the intent of this Ordinance on behalf of the City, the execution of the Agreement being conclusive evidence of such approval. Section 4. The Mayor, the City Administrator, the City Attorney and other appropriate City officials are hereby authorized to take any and all actions as may be deemed necessary or convenient to carry out and comply with the intent of this Ordinance and to execute and deliver for and on behalf of the City all certificates, instruments, agreements and other documents, as maybe necessary or convenient to perform all matters herein authorized. Section 5. This Ordinance shall be in full force and effect from and after its passage and approval. JQ~ ~~ Passed this /D day of~ L~/08. ) ~~LJ~/~ Mayor Kathleen L. Rose ATTEST: w ~ i Crty Clerk C:1D000nenG end Settings\LRUSICK\LOCaI Settings\Tempmary In[emet FilealOLKlF86\Ordioavice eppmvi¢g Comioevlal Shop Drawing Lift $tetioa Contrutdoc r SINC& 1976 Continental CO,YSGLTING fiHCINEEEB, 1NC 9000 State Lina Road Leawood, Kansas 68206 Phone: (913) 642.6642 Fax: (913)642fi941 TO: Cook, Flatt 8 Strobel Attn: Sabin Yanez 9228 Ward Parkway, Suite 110 Kansas City, Mo 64114 Letter of Transmittal FROM: David 8. Lotz, P.E. Continental Consulting Cngineers, Inc. RE: Riverside Horizon Development Construction Services DATE: October 14, 2008 Dear Sabin, Please find attached a contract to provide on-call engineering services for the above referenced project. The following outlines our proposed scope and fee. Scope of Work: 1. Review and processing of shop drawings. The attached amount is based on the submittal schedule provided by Pyramid Excavation. Month Task Item Personal Hrs Rate/Hr September a JM 2 $137 b JM 2 $137 c JM 1 $137 d JM 2 $137 g JM 4 $137 h JM 1 $137 i JM i $137 k JM 2 $137 q JM 4 $137 s JM 4 $137 t JM 1 $137 v JM 1 $137 w JM 1 $137 x JM 1 $137 cc JM 4 $137 Subtotal September 2006 JM 31 $137 Subtotal Fee September $4,247 Month Task Item Personal Hrs Rate/Hr October j JM 1 $137 n JM 1 $137 o JM 3 $137 p JM 3 $137 r JM 3 $137 u JM 1 $137 y JM 8 $137 z JM 8 $137 dd JM 24 $137 ee JM 4 $137 Subtotal October 2008 JM 56 $137 Subtotal Fee October $7,672 Month Task Item Personal Hrs Rate/Hr November ai JM 2 $137 e JM 2 $137 } JM 1 $137 as JM 16 $137 bb JM 40 $137 Subtotal November 2008 JM 61 $137 Subtotal Fee November $8,357 Month Task Item Personal Hrs RateMr December I JM 4 $137 Subtotal December 2006 JM 4 $137 Subtotal Fee December $ 548 Month Task Item Personal Hrs Rate/Hr March 2009 m JM 4 $137 Subtotal March 2009 JM 4 $137 Subtotal Fee March 2009 S 548 Total Fee Item 1 $21,372 2. Coordination with City and Contractor. It is estimated that the resources of the following individuals will be required to answer questions and provide coordination with the City, Contractor, and Equipment Suppliers. The Contractor, Pyramid Excavation has provided a construction schedule that extends for a period of 12 months. Personal Hrs/month Rate/Hr H/months Total Hrs. PG 3 $220 12 36 $7,920 DL 8 $187 12 96 $17,952 JM 12 $137 12 144 $19,728 Total Fee Item 2 $45,600 Based on the proposed submittal and construction schedule, we agree to provide the services outlined in items 1 and 2 above on an hourly basis for a not to exceed fee of $66,972. Upon approval of the attached Fee proposal for shop drawing review and on- call engineering services we will commence with review of shop drawings and addressing contractor questions. Reimbursement of billings for travel, prints, deliveries and all other direct costs incurred for the project will be charged at direct costs. As stated previously, the contractor shop drawings will be reviewed based on the shop drawings schedule submitted by the contractor. Should additional shop drawings be submitted for review, should substantial re-submittals be required, or should the contractor propose materials as substitutions to those incorporated in the plans, then addtional fees may apply. Any additiona- effort on our part during the construction of this project, including additional design modrfications will be billed at our standard hourly rates, a copy of which is attached. If you have any questions or desire additional information, don't hesitate to call. I can be reached at 913-642-6642, extension 204. Sincerely, Continental Consulting Engineers, Inc. David S. Lotz, P.E. ~~_ o~ ~~_ $- Senior Civil Engineer "~'` "~ Your signature of the attached will allow us to commence with the required design mod'Ifications. ~ 9 Approved By: Sabin Yanez, Date l~ ~ ~8 Cc: David Blackburn, Riverside City Administrator