HomeMy WebLinkAboutR-2026-106 Authorizing Execution of Sales Contract with Custom Container Living Inc for Restroom at EH Young Riverfront ParkRESOLUTION NO. R-2026-106
A RESOLUTION APPROVING AND AUTHORIZING THE EXECUTION OF A SALES
CONTRACT WITH CUSTOM CONTAINER LIVING, INC. FOR RESTROOM AT E.H.
YOUNG RIVERFRONT PARK
BE IT RESOLVED BY THE BOARD OF ALDERMEN OF THE CITY OF
RIVERSIDE, MISSOURI AS FOLLOWS:
THAT the Board of Aldermen hereby approves the Sales Contract and
Superseding Addendum, copies of which are attached hereto in their substantial form,
with Custom Container Living, Inc. and authorizes the Mayor to execute the same on behalf of the City; and
FURTHER THAT that the Board of Aldermen hereby invokes Section 135.070(8)
of the Municipal Code and formally waives the competitive bidding procedures otherwise
required, and further finds and declares that entering into a contract with Custom
Container Living, Inc. is in the best interest of the City due to the company's specialized
expertise and its ability to meet the City's required timeframes; and
FURTHER THAT the Mayor, the City Administrator, and other appropriate City
officials are hereby authorized to take any and all actions as may be deemed necessary
or convenient to effectuate the sale and conveyance of the apparatus and to carry out
and comply with the intent of this Resolution and to execute and deliver for and on behalf
of the City all certificates, instruments, agreements and other documents, as may be
necessary or convenient to perform all matters herein authorized.
PASSED AND ADOPTED by the Board of Aldermen of the City of Riverside,
Missouri, the 21st day of July 2026.
/s/ Kathleen L. Rose
Kathleen L. Rose, Mayor
ATTEST:
/s/ Melissa McChesney
Melissa McChesney, City Clerk
ADDENDUM
1. This addendum is made and entered as of the last date in the signature box below, by and
between the City of Riverside, Missouri ("City") and Custom Container Living, Inc. ("Company").
2. This addendum form is hereby made a part of the Sales Contract by and between the parties
hereto ("Agreement"), modifying and superseding where it is inconsistent. All other terms and
conditions of the Agreement remain unchanged, and this addendum is expressly incorporated
and made a part of the Agreement.
3. Company may not assign or transfer this Agreement without prior written approval of the City.
4. Nothing in this Agreement shall constitute a waiver of the City's sovereign immunity,
official immunity, or any other limitation on liability under Missouri law. The City shall
not provide an indemnity, and any clause requiring the City to indemnify Company is hereby deleted.
5. Company acknowledges that Section 285.530 RSMo prohibits any business entity or
employer from knowingly employing, hiring for employment, or continuing to employ an
unauthorized alien to perform work within the State of Missouri. Company therefore
covenants that it is not knowingly in violation of subsection 1 of Section 285.530 RSMo,
and that it will not knowingly employ, hire for employment, or continue to employ any
unauthorized aliens to perform Work on the Project, and that its employees are lawfully
eligible to work in the United States.
6. The Company shall furnish the City with a Payment Bond in a form set forth as attached
hereto in an amount at least equal to one hundred percent (100%) of the contract price.
Such bond shall be executed by the Company and a corporate bonding company licensed
to transact such business in the state in which the Work is to be performed and named on
the current list of "Surety Companies Acceptable on Federal Bonds" as published in the
Treasury Department Circular Number 570 and shall have a rating of at least "A-" from A.M. Best.
7. Time is of the essence with respect to all dates, deadlines, and obligations set forth in this
Agreement. Each party acknowledges that strict compliance with such deadlines is a
material term of this Agreement.
8. City representatives may inspect the work at Company's facility at reasonable times upon 48 hours, notice.
9. Company shall, at its sole cost and expense, procure and maintain the following insurance
coverages, with companies authorized to do business in the State of Missouri and rated not less
than A-VII by A.M. Best:
1
a. Commercial General Liability (CGL). Minimum limits of$3,000,000 per occurrence
and $4,000,000 general aggregate, covering bodily injury, personal injury, property
damage, products/completed operations, contractual liability, and independent contractors.
b. Workers' Compensation and Employer's Liability. Workers' Compensation
coverage in compliance with Missouri law.
c. Builder's Risk/ Installation Floater. Company shall maintain Builder's Risk
insurance (or an Installation Floater) covering the Structure, materials, and
equipment from commencement of fabrication through final acceptance by the
City. Coverage shall be written on an "all-risk" or equivalent special form basis in
an amount equal to at least the full replacement cost of the Structure. The City of
Riverside shall be listed as Loss Payee and Additional Insured. The Policy shall
cover transit, loading and unloading, and on-site storage until the City issues written
notice of final acceptance.
d. Automobile Liability. Combined single limit of$3,000,000 for all owned, hired,
and non-owned vehicles used in delivery or performance of the work.
e. Proof of Insurance; Conditions Precedent to Payment. Company shall provide the
City with certificates of insurance and copies of Additional Insured and Waiver of
Subrogation endorsements before any work: begins or any payment is made.
f. Subcontractors. Company shall ensure that any subcontractor performing work
under this Agreement maintains insurance meeting the same requirements and shall
obtain Certificates of Insurance verifying such coverage.
IO. The occurrence ofany of the following shall constitute a default by Company under this Agreement:
a. Failure to meet any milestone or delivery deadline;
b. Failure to correct defective or non-conforming work within the time specified by the City;
c. Failure to supply adequate labor, materials, or equipment;
d. Failure to comply with applicable laws, codes, permits, or inspection requirements;
e. Failure to maintain required insurance;
f. Misrepresentation of any material fact;
g. Abandonment of the project;.
h. Insolvency, bankruptcy filing, or assignment for the benefit of creditors; or
i. Any other material breach of this Agreement.
Upon the occurrence of any Company default, and after providing written notice and a
reasonable cure period (not to exceed ten (I 0) days unless otherwise agreed), the City may
pursue any and all legal or equitable remedies available under Missouri law. No act or
failure to act by the City shall constitute a waiver of any default, nor limit the City's right
to enforce the Agreement.
2
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed by themselves
or by their authorized representatives.
CUSTOM CONTAINER LIVING, INC.:
By: /s/ Robert Wagoner
Signed with Odoo Sign e6a1373d7c...
Name: Robert Wagoner
Title: President
Dated: 07/07/2026
CITY OF RIVERSIDE, MISSOURI:
By: /s/ Kathleen L. Rose
Kathleen L. Rose, Mayor
Dated: July 21, 2026
ATTEST:
/s/ Melissa McChesney
Melissa McChesney, City Clerk
COUNTERSIGNED BY:
CITY PURCHASING AGENT:
By: /s/ Amy Strough
Amy Strough, City Administrator
Dated: July 21, 2026
3
CUSTOM CONTAINER LIVING
SALES CONTRACT
WHEREAS Custom Container Living, Inc (CCL), and City of Riverside (Buyer),
together "The Parties," agree to the following terms:
1. Subject. The subject of this Sales Contract (Agreement) is the manufacture and
delivery of one or more container structures (Structure). The Structure Design shall be as set
forth in Addendum A, which includes characteristics, drawings, the bid, and other relevant
illustrations. The term Structure shall apply to any and all container structures in the Structure Design.
2. Structure Description. The Structure(s) that is the subject of this Agreement is
generally described as: 20' bathroom with 2 ADA stalls and 20' storage room
3. Purchase Price and Payment. Buyer agrees to pay to CCL the Purchase Price
amount of $120,975,00 over 4 payments. Each payment shall be applied to the purchase price of
the structure(s). The Payment schedule is as follows:
Pmt | Amount | Milestone | Due Date
1 $30,243.75 Due 14 days after signing of contract 14 Days
2 $30,243.75 Due 30 to 45 days prior to start of construction October+/-
3 $30,243.75 Due at the halfway point of construction December+/-
$30,243.75 Due when construction is complete and ready for February 2027 +/-4 delivery
Total $120,975.00
4. Change Orders. The Parties agree that if changes to the Structure(s) are ordered
by Buyer and accepted by CCL , that a Change Order will be signed by both parties and added as
an addendum to this Agreement. Payment for change orders is due upon signing of the change
order, or as otherwise agreed by the parties. If the change order payment is to be added to the
schedule of payments in Section 3 of this agreement, a new schedule of all payments shall be
included in the change order. Changes to Delivery and Placement shall also be reflected in
Change Orders agreed to by both parties.
5. Delivery. Upon completion, CCL shall deliver the Structure to Buyer. All
standard delivery fees are included in the purchase price. Delivery means transporting the
Structure from CCL to Buyer, including Standard Placement of the Structure without a crane, as
described in Section 13. In the event that Standard Placement is not possible, and additional
equipment is required for Placement of the Structure due to conditions of the delivery site, Buyer
shall pay additional Placement charges. Buyer agrees that CCL has the right to determine
whether delivery is unreasonably risky or dangerous due to conditions of the site itself, weather
related, snow-or ice-covered roads leading to the site or at the site, temperatures that could
prevent a completed delivery (too cold to paint, caulk, apply sealants, etc.) or the site has not
been graded and prepared for the arrival of home. It is highly recommended you watch our
delivery video and ask any questions you have with a CCL team member. If you are still unsure
of a successful delivery it is recommend you request a site visit by a CCL team member ( site
visits have an additional cost).
6. The Structure shall be delivered to the following address:
1001 NW Argosy Pkwy, Riverside, MO 64150
7. Utilities. Buyer is responsible for setting up and connecting all utility services to
each Structure, once it is set. This includes but is not limited to electricity, sewer, water, gas, and internet.
8. Delays Beyond Control/Force Majeure. The estimated delivery date of the
Structure is set out in Section 3 of this Agreement. Buyer acknowledges that the Structure is
being custom built for Buyer, and that assembly is dependent upon some factors not under the
control of CCL. CCL is not responsible for delays beyond CCL's control caused by (including
but not limited to) delayed delivery of materials, plant shutdowns, staffing shortage, pandemic
restrictions, Covid 19, acts of God, changes to scope of work, natural disasters, unusually severe
weather, any present or future law or regulation or government authority, war, civil or military
disobedience, riot, terrorism, fire, earthquake, storm, flood, strike, work stoppage, or similar
occurrence. CCL will notify Buyer promptly in writing of any encountered delay of or inability
to perform any obligations set forth under this Agreement and provide a new estimated delivery date to Buyer.
9. Available Date. CCL will provide written notice via email to Buyer of the date
the Structure is available for delivery (Available Date). That milestone payment as set forth in
Section 3 of this Agreement will be due within 10 days of this notice. Failure to make payment
by this date is a material breach of this Agreement. CCL will then send a second written notice
providing an additional 10-day period for Buyer to make that milestone payment. If Buyer fails
to make the payment after the lapse of the second notice period, Buyer is in Default of the Agreement.
10. Delivery Date. The delivery date will be agreed upon by both parties, after the
Available Date notice has been received by Buyer, and after payment has been made by Buyer as
set forth in Section 9. By agreeing to the Delivery Date, Buyer represents that the condition of
the site is safe and ready for Placement. If Buyer is aware of weather or some other temporary
condition that may render Delivery and Placement difficult or dangerous, Buyer shall contact
CCL 72 hours in advance of the Delivery Date in order to reschedule. In the event that CCL
tenders Delivery for Placement, and the site is not safe and ready for any reason, Buyer will bear
any additional costs incurred by CCL. If there are Delays Beyond Control, CCL will contact
Buyer to reschedule the Delivery Date.
11. Default. Buyer shall be in default under this Agreement if (a) Buyer fails to
follow the payment schedule in Section 3 and does not make payments as outlined and described
Custom Container Living, INC. Sales Contract Page 2
Buyer's Initials KLR
in Section 9, (b) CCL advises, in writing, that it requires additional information and Buyer fails
to provide such information within the timeframe specified by CCL, or ( c) Buyer refuses to agree
to pay any Price Increases as further discussed in Section 21 of this Agreement. In the event that
Buyer is found to be in Default of this Agreement, CCL shall have the right to retain Buyer's
deposit. Buyer shall have no further right to the Structure, CCL shall not be obligated to deliver
the Structure to Buyer. Additionally, CCL is entitled to pursue Liquidated Damages as set forth
in Section 25 this Agreement.
12. Early Delivery. If the Structure is available for delivery before the scheduled
date, and the property as identified in Section 6 of this agreement is prepared and safe for
delivery, and CCL desires to deliver, Buyer may accept Early Delivery upon reasonable notice
from CCL. In this event, Buyer agrees to make the payment (as listed above in Section 3,
Payments) in advance so that the associated Structure can be scheduled for Early Delivery.
13. Placement. CCL will transport the Structure to the site located at the address in
Section 6, on the Delivery Date as defined in Section 10. The site is the location where the pad,
foundation or piers have been set by Buyer, and have been made ready by Buyer for Placement.
The purchase price includes Standard Placement, which means: Access to the site with a semi-
truck and trailer (Semi); Roadway and driveway must be dry and solid, covered with compacted
gravel, or a hard surface to prevent Semi from getting stuck; Site entrance or driveway from
roadway must be 35' to 40' wide to allow Semi access by turning down or backing in from
roadway; Easy, safe access to the site from driveway with at least 150' of open clearance with
solid ground at one end of the pad site for semi to get straight with pad for unloading; A pad or
piers provided that they are only elevated 4" or less. If these conditions are not available at the
site for Standard Placement, then additional Placement fees will be charged, and are due upon
Delivery, billed directly to Buyer. Additional Placement fees include the cost of special
equipment (e.g. a crane may be needed if the pad or piers are elevated more than 4") and
additional labor. If labor by CCL employees is required, it will be billed at $90 per hour per
employee, plus any additional travel and living expenses, and billed to Buyer. Any deviation
from Standard Placement will be reflected in a Change Order and attached to this Agreement as
an Addendum. CCL may require Buyer to sign the Change Order prior to unloading the
Structure.
14. Site Prep. Buyer must prep the site for the Structure. CCL will not prepare the
site for the Structure, or grade soil. The Buyer may request that CCL perform a site visit prior to
Delivery for an additional fee. In the event that CCL begins delivery of the Structure, but
delivery cannot proceed because of either site prep, access, or safety issues, Buyer may choose to
either have the Structure unloaded at another site within 3 miles of the Delivery Address in
Section 5, or have CCL return the Structure to its facility. In the event that a second delivery is
scheduled, CCL will charge another delivery fee to redeliver the Structure. The second delivery
fee may be greater than the original delivery fee and is set by CCL. Any change in delivery will
be reflected in a Change Order and attached to this Agreement as an Addendum. Buyer agrees
that CCL has the right to determine whether delivery is unreasonably risky or dangerous due to
conditions of the site itself, the roads leading to the site or any weather conditions.
CCL HAS NOT CONDUCTED A SITE VISIT -A STANDARD DELIVERY WILL APPLY
15. Permits, Utility Connections, State and Local Ordinances. CCL will use its
best efforts to provide Buyer with guideline information about required (if any) permits, utility
connections, and/or changes necessary for compliance with state or local ordinances. The
Custom Container Living, INC. Sales Contract Page 3
Buyer's Initials KLR
information provided by CCL should be used as a guideline only, and Buyer is responsible for
verifying, obtaining, and providing CCL with accurate information about requirements for
relevant permits, utility connections, and compliance with state and local ordinances. CCL does
not guarantee or represent that information provided as a guideline is accurate. Buyer agrees not
to rely on that information. If any changes to architectural plans, engineering plans, container
Structure, or the site are required because of state or local ordinances, codes, zoning, or for any
other reason, Buyer must request a Change Order that will be attached to this Agreement as an
Addendum. Payment for these changes shall be made by Buyer within 7 days of the Change
Order, and change work shall not be performed until Buyer pays for it.
16. Compliance with Applicable Laws and Ordinances. Buyer shall comply with
all applicable laws, including but not limited to state and local laws and ordinances as well as all
applicable industry standards. If an applicable law or ordinance requires a licensed plumber or
electrician to make utility connections to the Structure or any appliances, Buyer shall engage
local licensed professionals at their own expense. In the event that CCL performs any work, it
does not change Buyer's obligation under this section. If Buyer fails to obtain a necessary
permit or notify CCL of any permits needed by their state or local jurisdiction, and as a result
CCL is unable to deliver or place the Structure, then CCL may, at their option, obtain the permit.
If CCL incurs any costs, fines, or forfeitures, Buyer agrees to indemnify CCL, and shall pay that
amount to CCL within 7 days of notice from CCL. Failure to make such payment to CCL shall
be a material breach of this Agreement, and shall place the Buyer in Default.
17. Pre-Delivery Inspection. Upon notice of Available Date, before delivery, Buyer
may Notify CCL if Buyer would like to inspect the Structure before delivery at CCL' s facility by
contacting CCL at contact@customcontainerliving.com. Upon inspection by Buyer, any
changes or corrections will be discussed. If Buyer would like to make changes, a Change Order
shall be created if needed. If Buyer advises CCL of any build issues, CCL will perform necessary
corrections. If Buyer fails to request the Pre-Delivery Inspection, it will be waived, and the
Structure will be presumed to be built as Designed and agreed.
18. Post-Delivery Inspection. Upon Delivery and Placement of the Structure, Buyer
will have 2 weeks to inspect the Structure. Buyer will provide CCL with notification in the form
of a list of any and all build defects or issues. CCL agrees to make any necessary repairs within
21 days (or within a reasonable time if necessary and notice by CCL is given) after the Post-
Delivery Inspection period. CCL is not responsible for damage or defects caused by Buyer's
failure to connect utilities to, or properly maintain the Structure. In the event that there are no
build issues for which repair is necessary, Buyer may provide CCL with notice of that fact. In the
event that Buyer does not provide CCL with any notice within 2 weeks after Placement of the
Structure, the Parties agree that the Structure does not require any repairs.
19. Warranty. Buyer is responsible for all maintenance and upkeep of the
Structure(s). CCL will repair or replace any malfunctioning part or system in the
Structure for 1 year after Delivery and Placement on a permanent foundation unless such
malfunctioning part or system was due to (a) Buyer's failure to properly maintain the
Structure(s) or (b) ordinary use of the Structure(s). During this period CCL will repair
any water leaks, plumbing and electrical system, and other construction issues. CCL does
not warrant that the Structure will float if dropped in water or that the Structure is
tornado proof. CCL constructs the Structure from an almost new, one-way shipping container.
Shipping containers of this type are constructed to a standard which makes them watertight and
resistant to extremely strong winds. After CCL performs construction, the Structure should retain
Custom Container Living, INC. Sales Contract Page 4
Buyer's Initials KLR
these characteristics, however, CCL does not guarantee or represent that your container Structure
will be windproof, hurricane proof, tornado proof, fireproof or floodproof. A shipping container
may have suffered damage from use in the past as a shipping container that we are unaware of,
which may affect the utility or quality of that container's use as a Structure. Buyer acknowledges
that the Structure is made from a repurposed one-way shipping container that might have been
used to transport substances, materials, or chemicals. CCL cannot make any guarantees that the
container is free of any residue of chemicals or substances from fabrication of the shipping
container when it was new or any of the items transported in it during the life of the shipping
container. CCL does not warrant that any specific use or damage to the shipping container has or
has not occurred. During Design, Buyer may choose to have a new floor installed in the
container, for a fee.
20. Appliances and Fixtures. Notwithstanding Section 19, after CCL makes repairs,
if any, the result of the Post-Delivery Inspection, Buyer assumes the risk for repairing any
appliances and fixtures in the Structure. CCL will provide Buyer with warranty information for
these items, including but not limited to refrigerator, oven, hvac, plumbing and electrical
fixtures. Buyer agrees to deal with the manufacturer of these items directly. In any event, the
Warranty outlined in Section 18 does not apply to handyman or contractor repairs or
replacement of minor fixtures under $1,000 per item.
21. Price Increases. The Purchase Price is fixed for completion, Delivery, and
Placement as stated in this Agreement. Due to fluctuations in material, supply, transportation,
elevated labor cost, and fuel costs, CCL reserves the right to pass along unforeseen cost increases
to Buyer, not to exceed 3% of the above contracted price. If such increases occur, CCL will
notify Buyer of the increase, the reason, documentation of the increase, and the amount. The
increases will be reflected in a Change Order and attached to this Agreement as an Addendum.
Refusal of Buyer to agree to pay Price Increases shall be a material breach of this Agreement,
and shall place the Buyer in Default.
22. Risk of Loss. CCL shall maintain appropriate insurance throughout the build and
delivery of the Structure in the case of an unforeseen accident that would cause the Structure to
require repair or replacement. Buyer assumes the risk of loss to the Structure once it has been
permanently affixed to the foundation or piers. Buyer is responsible for verifying with Buyer's
applicable insurer that, upon affixation to the foundation or piers, any damage or loss to the
Structure or damage and/or loss related to the Structure will be covered by Buyer's applicable
insurance. CCL cannot bind Buyer's insurance and Buyer shall provide to CCL adequate proof
of insurance coverage required herein, including but not limited to certificate(s) of insurance or
any additional proof required by CCL to fully protect the interests of CCL. Buyer waives any
claims against CCL due to risk or loss of any kind after the Structure is affixed to the foundation
or piers, even if Buyer's insurance is not yet effective. After the Structure is affixed to the
foundation or piers, to the fullest extent permitted by law, Buyer agrees to defend, hold harmless
and to indemnify CCL for loss or damage to the Structure, loss or damage to property and/or any
injury or death to any person caused by and/or related, in any way, to the Structure or related, in
any way and in whole or in part, to Buyer's negligent acts and/or omissions regardless of any
negligence on the part of CCL
23. Limitation of Liability. Notwithstanding any other provision of this Agreement
and to the fullest extent permitted by law, Buyer agrees that the total liability, in the aggregate, of
CCL and CCL's officers, directors, partners, employees, agents, and consultants to Buyer, its
subsidiary and/or affiliated companies, and their respective officers, directors, employees,
Custom Container Living, INC. Sales Contract Page 5
Buyer's Initials KLR
agents, and anyone claiming by, through, or under Buyer for any and all injuries, claims, losses,
expenses, or damages whatsoever arising out of, resulting from, or in any way related to this
Agreement and any Addenda, from any cause or causes , shall be limited to the proceeds of
CCL's available insurance coverage.
24. Cancellation. Buyer may cancel this Agreement without any penalty within 3
business days of signing this Agreement . Buyer's notice of cancellation must be in writing,
physically delivered to CCL ' s address within 3 business days of signing this Agreement. Upon
receiving notice of cancellation, CCL shall refund any deposit paid by Buyer within 7 business
days of Buyer's deposit clearing CCL' s bank.
At any time, for any reason, if CCL elects to cancel this Agreement, provided that Buyer
has not breached this Agreement, CCL shall immediately provide Buyer with written notice , and
refund any funds paid by Buyer within 7 business days of Buyer's funds clearing CCL's bank.
If Buyer cancels this Agreement more than 3 business days after the date of this
Agreement, or if Buyer is in Default of the Agreement, CCL shall retain Buyer's deposit. CCL is
also entitled to pursue Liquidated Damages as set forth in Section 25.
25. Liquidated Damages. If Buyer is in Default of this Agreement, CCL shall be
entitled to keep the Structure in its existing condition, free from any claim of Buyer. In addition,
Buyer shall pay CCL an amount equal to 10% of the Purchase Price in Section 3 this Agreement.
26. Notice. The Parties' current contact information for purposes of notice is:
CCL
Custom Container Living, Inc
809 S. Orange St.
Butler, MO 64730
816-885-1344
contact@customcontainerliving.com
Buyer
City of Riverside
2950 NW Vivion Rd
Riverside, MO
27. Governing Law. This Agreement shall be interpreted and governed by Missouri
Law, and exclusive jurisdiction to resolve any disputes shall be in Cass County.
28. Dispute Resolution. CCL and Buyer agree to submit all claims and disputes
arising out of this Agreement to non-binding mediation prior to the initiation of legal
proceedings. This provision shall survive the completion or termination of this Agreement;
however, neither party shall seek mediation of any claim or dispute arising out of this Agreement
beyond the period of time that would bar the initiation of legal proceedings to litigate such claim
or dispute under the applicable law.
29. Attorney's Fees. If any term of this Agreement must be litigated to be enforced
the prevailing party will be entitled to an award of reasonable attorneys' fees from the other
party, along with any costs of suit and discretionary costs required to pursue this matter.
30. Entire Agreement. The Parties agree that this Agreement with the Exhibits and
Addendums are the entire Agreement between the parties. Any modification or Addendum must
be in writing signed by both parties. There shall be no oral modifications.
Custom Container Living, INC. Sales Contract Page 6
Buyer's Initials KLR
31. Severability. If any term, condition, or provision of this Agreement is found to be
unenforceable for any reason, the remaining terms, conditions, and provisions of this Agreement
shall be in full force and effect.
32. Counterparts. This Agreement may be executed in two or more counterparts,
each of which shall be deemed an original, but all of which together shall constitute one and the
same instrument.
AND WHEREAS The Parties agree by signing below:
/s/ Robert Wagoner
Signed with Odoo Sign e6a1373d7c.., 07/07/2026
Robert Wagoner, Managing Member Date
Custom Container Living, INC.
FOR BUYER:
/s/ Kathleen L. Rose 7/21/2026
NAME: Date
TITLE:
Custom Container Living, INC. Sales Contract Page 7
Buyer's Initials KLR
SAMPLE CHANGE ORDER
WHEREAS Custom Container Living, Inc (CCL), and (Buyer),
together "The Parties ," entered into a Sales Contract (Agreement) on / / for fabrication and
installation of the subject Structures;
AND WHEREAS The Parties agree to the following changes to terms of the Agreement:
1.
2.
BASED ON THESE CHANGES, The Parties agree to this Change Order. And by
signing below, this Change Order shall become part of the Agreement between The Parties on
this the day of .
Robert Wagoner, Managing Member Date
Custom Container Living, INC.
FOR BUYER:
NAME: Date
TITLE:
Custom Container Living, INC. Sales Contract Page 8
Buyer's Initials KLR
ADDENDUM A
Reference Order #S26300
Custom Container Living, INC. Sales Contract
Buyer's Initials KLR
Page 9
Transforming Spaces One Container at a Time
City of Riverside ATTN: Noel Bennion
2950 NW Vivion Rd.
Riverside MO 64150
United States
Quotation Date
06/24/2026
Description
Custom Build
Expiration
07/24/2026
20' 2 stall ADA restroom with an additional 20' storage room attached
Custom Container Living
809 S. Orange St.
Butler, MO 64730
United States
Quotation # 526300
Salesperson
Bryce Smith
Quantity Unit Price Amount
1.00 Units $113,750.00 $113,750.00
The bathroom & storage room will be constructed within two 20' one trip high cube shipping containers. The container structure
will be 16' wide, 20' long, 9'6" tall when placed back to back.
Exterior
Siding: exterior will be sided with painted board and batten siding (siding and color chosen by owner) LP products will be used
Roof: will be standing seam metal, single slope roof with a 12" soffit overhang on all sides, soffit and facia metal will match color
of roof metal
Entry Doors: all doors will be steel framed/steel slab commercial doors with occupancy deadbolt and standard locking deadbolt-
total of two 3' single outswing doors, and one 7'x7' insulated garage door for the storage room
Door Hardware: Will include Sch/age (or similar) mortise L series (or similar) Lockset, HES (or similar) Electric Strike -bathroom
doors will include occupancy indicator lock, chase entrance will have have standard manual hardware -total of 2 doors. Will work
with customer to match their current master key. Customer to provide master key to CCL for coordination.
Door Conduit: Conduit will be run and junction boxes placed per plans provided by Convergint -Convergint to finish out
necessary wiring on site -total of 2 doors
General
Hardware: all door hardware to be brushed nickel finish
Page 1 / 4
Transforming Spaces One Container at a Time
Custom Container Living
809 S. Orange St.
Butler, MO 64730
United States
Quotation # 526300
Flood Vent: will install six (6) of 16"x8" marine grade stainless steel flood vents, two in each bathroom and two in the storage
room -owner to provide height of flood vents
Interior Lighting: will install 4k LED 6" can lights -two (2) in each bathroom and two (2) in storage room, total of six (6)
Exhaust Fans: will install one Braun exhaust fan in each bathroom -total of 2 (ventilation vent) vented to the exterior, fan will be
wired with light
Heating and Cooling: will install Hyper Heat Mitsubishi mini-split system with an indoor head in each bathroom -total of 2
Exterior Lights : will install (2) dusk to dawn exterior lights by bathroom doors
Floor Drains: will install one Zurn 2" floor drain with a 5 3/16" round nickel Bronze Strainer, floor drain tied in to plumbing line -
one (1) in each bathroom and in storage room, total of 3
Interior
Interior Walls & Ceiling: will be Duramax Panels (selected by owner)
Flooring: flooring to be Sherwin Williams Epoxy coating with decorative color chips -owner to select color
Cove Base: will include an epoxy cove base that blends in seamlessly with the flooring
ADA Stall with urinal
Toilet -will install one (1) Gerber or similar porcelain ADA height floor mounted elongated toilet bowl with Sloan automatic hard-
wired flush valve, standard soft-close plastic open front toilet seat
Urinal: will install one (1) urinal with automatic chrome flush valve, porcelain -white in color
Sink: will install one ADA wall hung vanity sink (open below), porcelain -white in color
Faucet: will install Chicago 333 series faucet, chrome finish
Electric Hand Dryer: will install (1) Excel XL-SB 110/120 Xlerator electric hand dryer with stainless steel antimicrobial wall guard
below dryer
ADA Grab Bars: will install (2) ADA compliant grab bars behind and beside toilet
Lighting: will install 2 LED can lights with occupancy sensor switch
Page2 / 4
Transforming Spaces One Container at a Time
Custom Container Living
809 S. Orange St.
Butler, MO 64730
United States
Quotation # 526300
ADA Stall with Changing Table
Toilet -will install one (1) Gerber or similar porcelain ADA height floor mounted elongated toilet bowl with Sloan (or similar)
automatic hard-wired flush valve, standard so~ close plastic open front toilet seat
Sink: will install one ADA wall hung vanity sink (open below), porcelain -white in color
Faucet: will install Chicago 333 series faucet, chrome finish
Electric Hand Dryer: will install (1) Excel XL-SB 110/120 Xlerator electric hand dryer with stainless steel wall guard below dryer
ADA Grab Bars: will install (2) ADA compliant grab bars behind and beside toilet
Lighting: will install 2 LED can lights with occupancy sensor switch
Baby Changing Station: will install (1) Koala Kare KB300 Horizontal Surface Mounted Baby Changing Station
Storage Room
Finish: Interior and exterior finished to match container bathrooms
Electrical Panel: will house one 100 amp electrical service panel -*will work with owner and engineer on placement location
Heater: will install one (1) radiant wall heater
Water heater: will install Eco-Smart point-of-use electric water heater, total of 1 to service both sinks
Plumbing access: will install an approx. 1 'x2' removable piece of floor for plumbing access.
Water Shutoff: will install water-shutoff manifold to turnoff water supply to bathrooms individually
Garage Door: will install 7'x7' insulated garage door
Payment Bond
Payment Bond
CCL to furnish payment bond equal to the amount of the purchase price
Delivery and Logistics
1.00 Units $3,700.00 $3,700.00
Page3 / 4
Transforming Spaces One Container at a Time
Custom Container Living
809 S. Orange St.
Butler, MO 64730
United States
Quotation # S26300
This price includes stamped structural and Mf P engineered drawings for restroom and footings to frost depth. If any other
certifications are required, cost will be billed to customer on final invoice.
Customer Request
Steel Plates: will include anticipated 1/4" embed plates. Will include four
(4) single 12x12 embed plates and two (2) double 12x24 embed plates.
CCL to furnish plates only. Owner to install plates into foundation per
plans.
Double Container Delivery
Delivered to EH Young in Riverside, MO. This includes our standard drop-
off delivery. If any special equipment is required for delivery, total cost will
be the responsibility of the buyer. CCL will weld the bathroom to embed
plates in the foundation. Owner is responsible for connecting utilities and
ensuring site access.
Subtotal
Tax
Total
1.00 Units $1,500.00
225 .00 Units $9.00
$1,500.00
$2,025.00
$120,975.00
$0.00
$120,975.00
Thank you for the opportunity to provide a quote for this project. We could not be more excited about another potential
project with the city of Riverside. Please let me know if you have any questions.
Page 4 / 4