Loading...
HomeMy WebLinkAbout2000 - 089 - Supplemental Agreement No. 5 with Bucher, Willis, & Ratliff CorpBILL NO. 2000-89 ORDINANCE 1v0.2000- ~' `i AN ORDINANCE AUT'HORILING THE MAYOR TO ENTER INTO SUPPLEMENTAL AGREEMENT NO. 5 WITH BUCHER, WILLIS & RATLIFF CORPORATION, KANSAS CITY, NIO., FOR PROFESSIONAL ENGINEERING SERVICES STREET, STORM DRAINAGE, BRIDGE WIDENING, ANll SIDEV-'ALK IMPROVEMENTS, NW GA"TEWAY IN THE AMOUNT OF $31,200.00. BE [T ORDAINEll BY THE BOARD OF ALDERMEN FOR THE. CITY OF RIVERSIDE, MSISOURI, AS FOLLOWS: SECTION 1. 'The Mayor is hereby authorized to enter into a contract with Bucher, Willis & Ratliff Corp., Kansas City, Mo, to provide engineering services, street, bridge, storm drainage and sidewalk improvements, NW Gateway. SECTION 2. The City hereby agrees to pay the Engineer $2,400.00 as reimbursement for costs incurred by the Engineer in connection with the Designer construction Phase Services. SECTION 3. The City hereby agrees to pay the Engineer the (not to exceed) amount of $28,800.00 as reimbursement for costs incurred by the Engineer in connection with the Construction Observation Services. PASSED THIS 710 llAY OF NOVEMBER, 2000. .~^ ~ / .~il~ ~lC iC'1c Mayor Be Burch A T~. ~ / o. ~~ v :AR 23 ~O1 12:30 FROM:BWR Corporation KCMO 81fi3630027 T-216 P.03/05 F-106 SUFPLEMENTAL AGREEMENT NO. 5 TO AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES THIS SUPPLEMENTAL AGREEMENT N0.5 ("Supplement"), is made and entered into this 7th day of November , 2000, by and between the CITY OF RIVERSIDE, MISSOURI, a Mtuucipal Corporation of the State of Missouri (the "City"), and BUCHER, WILLIS & BAILIFF CORPORATION, a Missouri corpo=anon (the "Engineer"). WHEREAS, the City and the Engineer have entered into a certain Agreement for Professional Engineering Services, Street, Bridge, Storm Drainage, and Sidewalk Improvements, N.W. Gateway, City of Riverside, Missouri, Project No. 96-0I dated July 16, 1996 (the "Agreement"), in connection with the N.W. Gateway Road Project (the "Project"). WHEREAS, Page 7 of 7 in Exhibit I, identified in Article I, ADDITIONAL SERVICES TO BE PROVIDED EY CONSULTANT, of the Agreement indicates that the "Designer Construction Phase Services, Construction Observation, and Preparation of As-Built Construction plans" are not included in the scope of services and are considered additional work; WHEREAS, the Engineer has been directed by the City to provide the Designer Construction Phase Services to include: review of shop drawings, answering questions during construction, and load rating the structure, The Construction Observation Services will include providing assistance to the City Inspector on an as needed basis during construction operations, and prepatatian of the Record Construction Plans that reflect significant changes made during COnStIUCt10n. WHEREAS, the City is agreeable to the additional work to be performed by the Engineer in connection with construction phase services; NOW, THEREFORE, in consideration of the foregoing premises and the mutual covenants and agreements herein contained, and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties do hereby agree as follows: 1. The Engineer is hereby authorized to proceed. with the additional work 2, The City hereby agrees to pay the Engineer the amount of Two Thousand Four Idundred Dollars ($2,400.00) as reimbursement for costs incurred by the Engineer in connection with tha Designer Construction Phase Services. Such amouztt shall be paid in accordance with Article IV, PAYMENTS TO THE ENGINEER. o~vwu~wec~mvn~ens~mnur .gimme JAy 23 'O1 12:31 FRO~I:BWR Corporation KC1~0 6163630027 .,, •: - EXHIBIT A QtEVISED AUGU5T 2000) BUCHER, WILLIS & BAILIFF CORPORATION HOURT.Y RATES THOUGH DECEMBER 31, 2000 Class"ficatioa Principal ................................................................................$ 130.00 Senior Project Manager ...............................•--.....».............-$ 115.00 Project Manager ..........................._...-----------•--....----•--..........$ 105.00 Technical Manager ................................................................$ 95.00 • ~ 95.00 Senwr Engineer.........(Construction Enguteer In............$ Design Engineer N_ .............................................................$ 85.00 Design Engineer III... (Construction Engineer n ............. $ 7'0.00 .. ... Design Engineer II ......................................... ..... .............$ 65.00 Design fingisticer I.•.•.. (Construction Ter +~-+a*+) ..........-.$ 55.00 T-216 P.05/05 F-106 Senior Planner .......................................................................$ 90.00 Planner II ................................................................................$ 75.00 Planner I .................................................................................$ 60.00 Senior Architect ...................................................................$ 95.00 ArchitectII .................................................................•---.....---5 75.00 ArchitectL ..............................................................................$ 65.00 Architectural lntern ..............................................................$ 45-00 Senior Pazk Planner ..............................................................$ 95.00 Senior Landscape Architect ................................................. $ 95.00 Landscape Architect III .......................................................$ 75.00 Landscape Architect II .........................................................$ 65.00 Landscape Architect I ...........................................................$ 50.00 Senior Technician ..................................................................$ 70.00 Techn;cianlI ......................................................................._.$ 55.00 Teclu~ician I ............................................................................$ 50.00 Draftsman .............................................................................~ 40.00 Registered Land Surveyor ...................................................$ 70.00 Two-Man Survey Crew ..............................................»........ $ 125-00 Survey Technician .................................................................$ 55.00 Admivustrative Assistant------ ..............................................$ 65.00 WordProceasor .....................................................................$ 40.00 Clerlcal ....................................................................................$ 35.00 Nuclear Testing Gauge .......................................,.......-...... $ 40.00lUnit/Day Traffic Studies Equipment ................................................ ..$ 15.00lUnitlDay Computer ...............................................................................$ 12.00/Hour Mileage ............................ .................................................$ 0.325/Mile ...... Survey Vehicle Mileage ........................................................$ 0.35/Mile