HomeMy WebLinkAbout1999 - 21 - Proposal for Additional Engineering Service by TransystemsBILL NO. 99-21 ORDINANCE NO. 99-~%~/ AN ORDINANCE ACCEPTING THE PROPOSAL FOR ADDITIONAL ENGINEERING SERVICES NEEDED BY TRANSYSTEMS CORP. TO PREPARE FOR NEW CONSTRUCTION CONTRACT TO COMPLETE STREET IMPROVEMENT PROJECT ON NW HIGH DRIVE, RIVERSIDE. BE IT ORDAINED BY THE BOARD OF ALDERMEN OF THE CITY OF RIVERSIDE, MISSOURI, AS FOLLOWS: SECTION 1: The Board of Aldermen agrees to accept the proposal from TranSytems Corp. to provide needed additional engineering services to prepare for a new construction contract to be awarded to a contractor who will complete the High Drive Street Improvement Project in a not-to-exceed amount of $34,958.00. SECTION 2: The Scope of Services is hereby accepted as printed on the attached forms. PASSED THIS 16TH DAY OF MARCH, 1999. ATTEST: _~ r Ed Rule Louise Rusick, City Clerk T?~NSYSTEMS ,~ CGl~2P0/?AT/O/V ~,/ March 11, 1999 Ann Daniels City Administrator P.O. Box 9135 4500 N.W. High Drive Riverside, MO 61168 Re: High Drive Engineering Services Supplement Job No. 369?-00 Dear Ms. Daniels: We are pleased to submit our supplemental proposal for the additional engineering services needed for High Drive. Upon your written notice to proceed, we propose to complete the following additional services. ADDITIONAL SCOPE OF SERVICES 1. Revise the plans and specifications for the project. It is our intent to minimize the revisions to the plans and describe the work completed to date in a narrative form that will be included in the specifications. 2. Prepare a revised construction cost estimate. 3. Provide contract documents for use by prospective contractor. 4. Attend and document two (2) coordination meetings. 5. Review the contractor's estimate. 6. Attend and document one (1)pre-construction meeting. 7. Document future construction progress review meetings. COMPENSATION We request compensation for the additional services based on our 1999 standard hourly rates (see attached schedule). Refer to Exhibit A for the Estimate of Man-hours and Exhibit B for the Estimate of Fees. 800 West 47th Street, Suite 600 • Kansas City, Missouri 64112 • Phone. [816]756-1484 Fax: [816)756-0559 HIGH DRIVE ENGINEERING SERVICES Supplement EXHIBIT B ESTIMATE OF FEES March 11, 1999 Professional Services ADDITIONAL SERVICES Principal (E5) 12 Manhours @ $185.00 /hr = $2,220.00 Proj. Manager (E4) 87 Manhours @ $120.00 /hr = $10,440.00 Engineer (E2) 188 Manhours @ $75.00 /hr = $14,100.00 Registered Land Surveyor (S4) 2 Manhours @ $73.00 /hr = $146.00 Designer (T4) 48 Manhours @ $68.00 /hr = $3,264.00 Technician (T3) 64 Manhours @ $56.00 /hr = $3,584.00 Expenses Mileage Plan reproduction Misc. (postage, deliveries) Subtotal Professional Services $33,754.00 10 trips x 45 miles/trip x $0.32 /mi. _ $144.00 12 sets x $80.00 /set = $960.00 $100.00 Subtotal Expenses $1,204.00 TOTAL COST FOR SUPPLEMENT $34,958.00 Exhibit B Page 1 of 1 SCHEDULE OF RATES TranSystems Corporation Kansas City Offices (Schedule of Hourlv Rates for 1999) Hourly Rate ~ PrincipaUEngineer V $185.00 Engineer IV 5120.00 ~ Engineer HI $ 89.00 Engineer II $ 75.00 Engineer I S 60.00 .architect [V $130.00 Architect III 572.00 PlannerlV 5124.00 Planner III $ 94.00 Planner II S 72.00 Planner [ 5 45.00 Railroad Specialist III 595.00 Railroad Specialist H 584.00 Railroad Specialist I 561.00 Technician V $ 95.00 Technician IV $ 68.00 Technician III $ 56.00 Technician H $ 48.00 Technician I $ 42.00 Survevor IV 5 73.00 Survevor III $ 54.00 Surveyor II S 45.00 Surveyor I $ 34.00 Three-Person Survev Crew 5125.00 Two-Persou Survey Crew 5105.00 Inspector N 5 70.00 Inspector III 5 55.00 Inspector II S 51.00 Inspector [ 5 39.00 Administrator II 547.00 Administrator [ 544.00 Clerical III S 51.00 Clerical fI 5 41.00 Clerical 1 5 34.00 Sub-contracted labor, material testing equipment, printing and technical photography, and all other directjob costs to be paid at cost. Vehicle mileage to be paid at the current IRS rate per mile.